In Fayette County one office handles most building permits: the Fayette County Building Department at 121 East East Street, Washington Court House (740-335-2212), certified for both the Ohio Building Code and the residential code. It permits and inspects houses in every township and village outside the City of Washington Court House, and commercial buildings throughout the county, including in that city, where the city’s own department permits houses. A new house is priced at a $300 review fee plus per-area charges for building, electrical and HVAC work, and on a site that may flood no permit is issued until the county Floodplain Manager has cleared it.
What requires a building permit in Fayette County?
The county department issues permits for new construction, additions and alterations to existing buildings, signs, solar panel installations, demolition and other work. Its residential and commercial fee schedules show how far that reaches.
Residential work it prices
- New houses, two- and three-unit dwellings, additions of any size and major renovations
- Detached garages, pole barns, on-site built sheds and moving a structure
- Industrialized units and manufactured homes
- Porches and decks, roofs added over them, and minor alterations
- Electrical, HVAC and plumbing alterations, water heaters, temporary electric and service releases
- Fireplaces, re-roofing, solar panels, off-site built sheds and swimming pool electrical
Commercial work it prices
- New buildings, additions and major alterations, by floor area
- HVAC, electrical, plumbing, fire alarm and sprinkler systems
- Minor alterations, re-roofs and equipment replacements
- Signs, demolition and temporary trailers or tents
- Certificates of use and occupancy
A use and occupancy permit is required for every new home, addition, pole barn and garage, and starting work without a permit adds a $100 charge on residential jobs ($75 on commercial). Zoning and floodplain approvals are separate and come first.
What the county decides and what the state holds
The county sets its own permit fees, registers and bonds contractors, zones the townships that use county zoning, and runs floodplain management under its Flood Damage Reduction Resolution, first passed in May 1995 and last revised and signed on November 9, 2020. Ohio writes the codes and certified the department to enforce them, licenses commercial trade contractors, and receives a surcharge of 1% on residential and 3% on commercial permit fees.
Fayette County building department: who handles permitting
The county department’s own description is the rule: it is responsible for residential building codes county-wide except in the City of Washington Court House, and for the commercial building code county-wide, including that city. Zoning is local to each township, village or the city.
Short on time to read all of this?
Get a free quote →| Place | Building permits | Zoning |
|---|---|---|
| Washington Court House city (14,375) | Houses: city Building & Zoning Department, 105 North Main Street, 740-636-2353. Commercial: county department | City |
| Jeffersonville village (1,246) | County department, residential and commercial | Village zoning official |
| Bloomingburg village (856) | County department, residential and commercial | Village zoning official |
| New Holland village, Fayette County part (131) | County department, residential and commercial | Village zoning official |
| Milledgeville village (97) | County department, residential and commercial | Village zoning official |
| Octa village (58) | County department, residential and commercial | County zoning official |
| Unincorporated townships | County department, residential and commercial | County zoning in Concord, Green, Jasper, Madison, Marion, Paint, Perry and Wayne; own officials in Jefferson and Union |
| Detail | Information |
|---|---|
| Office | 121 East East Street, Washington Court House, OH 43160 |
| Phone / fax | 740-335-2212 / 740-335-6644 |
| Hours | Monday to Friday, 7:30 a.m. to 4 p.m., closed noon to 1 p.m. |
| Building Official | Craig K. Breedlove |
| Contractor registration | Fayette County Contractor Administrator, same office; fayettecountycontractor@fayette-co-oh.com |
Population figures are the Census Bureau’s 2025 estimates; 702 of New Holland’s residents live in the Pickaway County part of the village.
Fayette County permit types
Applications can be delivered, mailed or submitted through the department’s online permit link. The residential and commercial plan approval applications were both revised in June 2026.
Residential permits
The residential plan approval application asks for the project address, owner, a description and value of the work, the total project area including finished space, garage, porches and decks, and the registration number of each contractor. Submit two sets of complete drawings: a site plan with acreage, boundaries and floodplain, setbacks, easements, utilities and driveways; foundation, floor and structural plans; and wall sections with insulation values. Electrical, mechanical and plumbing drawings are not needed before the permit is issued, but every system is inspected, and each listed contractor answers for its own trade.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial applicants file three printed sets of drawings or upload them through the portal, covering an index, site, floor and roof plans, elevations and sections, the building envelope, door and window schedules, structural drawings, fire suppression and alarm systems, fire-resistance rated elements and system descriptions. Drawings must identify the person who prepared them. A separate commercial certificate of use and occupancy application covers occupying a building.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: clear zoning with the local official first. The county zoning official covers Concord, Green, Jasper, Madison, Marion, Paint, Perry and Wayne townships and the Village of Octa, using the county’s 2025 zoning resolution (Wayne Township and Octa have their own resolutions on the county page); Jefferson and Union townships, the villages and the city have their own officials.
- Floodplain: the Floodplain Manager, whose office is inside the Fayette Soil and Water Conservation District, decides whether a site is in a flood hazard area; the zoning, building, engineering and health offices send possible flood sites to the manager and cannot issue permits for them without that clearance.
- Health: Fayette County Public Health approves septic systems and private wells and sets minimum clearances from them for additions, decks, garages, barns and pools.
- Driveways and drainage: the County Engineer approves driveway access and storm drainage on county roads; state routes go to ODOT.
Fayette County permit costs and fees
Both county schedules price work by affected gross floor area (AGFA): the square footage affected, including basements, garages, porches and other covered areas, divided by 100 and rounded up. The residential worksheet was revised November 5, 2021 and the commercial schedule August 3, 2026. Fees are calculated when plans are approved and paid by check or money order to the department when the approved plans are picked up.
| Work | Fee |
|---|---|
| New house, addition over 200 sq ft or major renovation | $300 review + $4 per AGFA building + $2 per AGFA electrical + $2 per AGFA HVAC + plumbing per fixture; two identical units × 1.5, three × 2.0 |
| Detached garage, pole barn or on-site built shed | $100 review + $2 per AGFA building + $1 each electrical and HVAC + plumbing |
| Manufactured home or industrialized unit | $150 |
| Addition up to 200 sq ft; porch or deck | $150 each; roof over existing porch or deck $100 |
| Major electrical, mechanical or plumbing alteration | $100 each |
| Water heater, re-roof, solar panels, fireplace, temporary electric, minor trade work | $50 each |
| Residential use and occupancy permit | $50 |
| Commercial building | $250 review + $10 per AGFA; HVAC and electrical $250 + $8 per AGFA each; plumbing $250 + $20 per fixture |
| Commercial fire alarm or sprinkler | $250 + $8 per AGFA each |
| Commercial minor alteration; sign | $150; $150 (extra wall signs $50) |
| Commercial certificate of use and occupancy | $75 |
| Re-inspection | $50 residential; $75 commercial |
| State surcharge | 1% residential; 3% commercial |
Rather talk it over?
Call 1-855-478-4290 →For a house with 2,500 square feet of affected area (AGFA 25), the schedule’s area charges are $100 for building, $50 for electrical and $50 for HVAC, on top of the $300 review fee and the plumbing fixture charge. The residential worksheet gives two plumbing rates, $8 per fixture on its first page and $4 on the plumbing worksheet, so the department’s own calculation decides that line.
Zoning fees in the county-zoned townships, Union Township and Octa date from May 6, 2008: $1 per $1,000 of project value, with a $25 minimum and a $100 maximum for residential and $500 for non-residential permits, $50 for a zoning appeal and $100 for a zoning change.
Trade permits and who may pull them
Electrical, HVAC and plumbing work is part of the county’s building permit for houses and commercial buildings, priced on the same worksheet and inspected by the same department; separate minor and major alteration fees cover stand-alone trade jobs.
- Contractor registration: all commercial contractors working anywhere in the county, and all residential contractors outside Washington Court House, register with the county before work starts. Registration needs the application, a $10,000 surety bond held by the department and a one-time $125 fee; a continuing bond keeps it current, and a lapsed bond means re-registering. Inspections are not scheduled until registration is complete.
- Licensed trades: electrical, plumbing, HVAC, hydronics and refrigeration contractors on commercial projects must hold Ohio Construction Industry Licensing Board licenses and supply a copy; fire protection contractors supply their certification number.
- Homeowners: the department’s inspection sheet says homeowners may do building, electrical, HVAC and plumbing work in the home they live in or intend to live in, taking responsibility for code compliance and for calling in inspections.
Rather not deal with the Fayette County building department?
Get a free quote →How to apply for a Fayette County building permit
A house inside Washington Court House goes to the city; everything else goes to the county department.
Contact the township, village or county zoning official listed on the county’s zoning page.
The Floodplain Manager clears any site that may flood; Fayette County Public Health approves any well or septic work.
Each contractor files the registration, bond and $125 fee unless already registered.
Two sets for a house, three sets or an upload for commercial work, with the plan approval application.
Pay the calculated fee when the approved plans are ready, then schedule inspections.
Review, corrections and what causes delay
Where a site may be in a flood area, permits wait for floodplain clearance, so a lot near a stream should start with the Floodplain Manager. Inspections are not scheduled until contractor registration is complete. On commercial jobs the schedule charges $75 for each plan review after the second. An approval stays valid if work starts within 12 months, and the owner can get one 12-month extension by asking at least 10 days before it expires.
Inspections in Fayette County
Call 740-335-2212 at least 24 hours ahead with the permit number, contractor number, type of inspection and date. Inspectors work between 9 a.m. and 4 p.m. on weekdays; they cannot promise a time, but footings and foundations get priority. Approved drawings must be on site, the address posted at the driveway, and stamped truss drawings on hand for the framing inspection.
The residential checklist covers footings and foundation, slab and underground plumbing and electric, rough framing, electric, HVAC, plumbing and gas under test, insulation, fireplaces, above-ceiling work and finals for each trade, with a bowl test for the final plumbing. Work not ready costs a $50 residential or $75 commercial re-inspection fee, paid before the next visit. On commercial jobs the owner arranges any special inspections required by Chapter 17 of the Ohio Building Code, and the certificate of use and occupancy follows the finals.
Ohio building code in Fayette County
The county department is certified by the state for the Ohio Building Code and the residential code. FEMA’s Community Status Book lists Fayette County’s unincorporated areas (community 390164) and the City of Washington Court House (390166) as participating in the National Flood Insurance Program, both with maps effective March 2, 2004; a Floodplain Board of Appeals hears variance requests under the county resolution.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Fayette County permit search and official resources
To see whether a parcel lies inside Washington Court House, use the county’s GIS map; the Board of Building Standards’ building department look-up maps the department with authority over each address. Records of past county permits sit with the building department; the county posts a public records request form for written requests.
- Fayette County Building Department
- Building permit applications and fee schedules
- Residential plan approval application
- Commercial building permit application
- Residential fee schedule worksheet
- Commercial fee schedule (rev. August 3, 2026)
- Inspection requirements
- Residential inspection checklist
- Commercial inspection checklist
- Contractor registration application
- Zoning officials and documents
- County zoning resolution (2025)
- County, Union and Octa zoning fees
- Floodplain management
- Flood Damage Reduction Resolution (2020)
- County Engineer’s Office
- Fayette County Public Health, environmental health
- Washington Court House Building & Zoning Department
- County public records request form
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Fayette County building permit FAQs
Does the county issue permits in Washington Court House?
For commercial buildings, yes. Houses in the city are permitted by the city’s Building & Zoning Department at 105 North Main Street.
Who issues building permits in the villages?
The county department, for both houses and commercial work in Jeffersonville, Bloomingburg, New Holland, Milledgeville and Octa; zoning stays with each village, except that Octa uses the county zoning official.
Can I build my own house in Fayette County?
Yes. Homeowners may do building, electrical, HVAC and plumbing work in a home they live in or intend to live in, and must call for each inspection.
How much does contractor registration cost?
A one-time $125 fee plus a $10,000 surety bond held by the county; keep the bond continuous to avoid re-registering.
Who handles septic systems and wells?
Fayette County Public Health, 317 South Fayette Street (740-335-5910), which permits, inspects and also checks well and septic systems when properties are sold.
When does a permit need floodplain clearance?
If a site may be in a flood area, the zoning, building, engineering and health offices refer it to the Floodplain Manager and cannot issue permits until the manager has decided whether it is in a flood hazard area.
How much notice does an inspection need?
At least 24 hours; inspections run from 9 a.m. to 4 p.m. on weekdays.
Who approves a new driveway?
The County Engineer’s Office at 1600 Robinson Road (740-335-1541) for county roads; ODOT for state routes.
Simplify Fayette County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Fayette County sooner?
Let Alliance prepare, file, and track your Fayette County permits while your crew stays on the job.
More Ohio permitting guides
Washington Court House
Read guide →Madison County
Read guide →Clinton County
Read guide →Forest Park Building Permit Guide
Read guide →Franklin County Building Permit Guide
Read guide →Fulton County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Fayette County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.