In Centerville, plans and inspections are handled at the city offices, 100 West Spring Valley Road, by the Centerville Building Department (Building Inspection, 937-428-4786, Monday to Friday 8:00 a.m. to 4:30 p.m.), which the Ohio Board of Building Standards certifies for commercial and residential buildings, including electrical, gas piping, HVAC and plumbing systems. Chief Building Official Derek Spurling leads the department. Most projects start with a city zoning permit or Certificate of Zoning Compliance from the Planning Department, and both kinds of application can be filed in the city’s online permitting portal.
What requires a building permit in Centerville?
Ohio law says work on a building cannot proceed until its plans are approved as the law requires, and in Centerville the city building department gives that approval. The city says building department approval is needed for the construction of commercial and residential structures, covering building, electric, plumbing, HVAC, gas and occupancy, and it names developing a vacant lot, adding a room, deck or garage, and electrical, heating, air conditioning or plumbing installations or replacements as typical triggers. Unsure cases are a phone call: 937-428-4786.
Zoning and building permit
- Sheds and detached garages over 200 square feet
- Decks over 200 square feet, attached to the house, or more than 30 inches above grade
- Building additions, including patio enclosures and patio covers (ask Building Inspection which permits apply)
- New homes and new or expanding businesses (which also need a certificate of occupancy)
Zoning permit only (typical)
- Pools, in-ground or above-ground, with an electric permit for any new wiring
- Fences, including a replacement of an existing fence
- Sheds and other accessory structures of 200 square feet or less
- Patios and driveway extensions adding more than 250 square feet of hard surface
- Temporary and permanent signs, including a new sign face (a sign may also need a building or electric permit)
Work in the street right-of-way, including driveway aprons, sidewalk repair, utility work, excavation and tree-lawn irrigation, needs a separate Public Works permit, because the city normally owns the street and the strips on each side.
What Centerville decides and what the state holds
The state writes the building, residential, mechanical and plumbing codes and certified the city’s department to enforce them for both commercial and residential work. The city decides land use through its Unified Development Ordinance, keeps an Architectural Preservation District and landmark program, registers trade contractors, and sets its own permit fees. Part of Centerville lies in Greene County, but the city’s departments serve the whole city.
Short on time to read all of this?
Get a free quote →Centerville building department: who handles permitting
The Building Inspection Department issues building, electrical, mechanical, gas piping and plumbing approvals and certificates of occupancy. The city employs building, electrical and plumbing inspectors and a master plan examiner who reviews every commercial and multi-family project. Zoning, property maintenance and Architectural Preservation District questions go to other divisions; the building office stresses that it handles only the building inspection part of a project.
| Office | Contact |
|---|---|
| Building Inspection (building, trades, occupancy, contractor registration) | 100 W Spring Valley Road, Centerville, OH 45458; 937-428-4786; fax 937-428-4718; Monday–Friday 8:00 a.m.–4:30 p.m. |
| Chief Building Official | Derek Spurling |
| Planning Department (zoning permits, Certificate of Zoning Compliance, boards) | Same address; 937-428-4760 on its permit pages (the department listing also shows 937-433-7151) |
| Public Works (right-of-way permits, flood maps) | 7970 S Suburban Road; 937-428-4782 |
| Portal | City online permitting portal (EnerGov self-service), with a user guide |
Centerville permit types
The building department uses one Application for Plan Approval for building, demolition, fire alarm, fire suppression, occupancy and permanent sign work, and separate applications for electrical or mechanical work and for gas piping or plumbing. Each form covers one project type or one address, ticks commercial or residential, and will not be processed without the actual job cost charged to the customer. It also asks whether the site is in a FEMA flood-prone area.
Residential permits
- New homes and additions: scaled drawings showing structure, foundation, elevations and trades; the Planning Department has its own how-to sheet for new single-family homes and additions.
- Decks, sheds and garages: a zoning permit first, then a building permit for decks and structures past the size or height limits above.
- Trade replacements: furnace, water heater, wiring and plumbing changes use the trade applications.
Accessory structure limits. The city’s accessory structure guide, a summary of Article 9.39 of the Unified Development Ordinance, allows one storage building per home, up to 12 feet tall and no larger than 750 square feet or 20% of the rear yard, whichever is less. Sheds may not sit in the front yard and need a 5-foot setback from the rear line; decks need a 5-foot side and rear setback; pools go in the rear yard, 10 feet from side and rear lines, inside a fence at least 60 inches high with a self-locking gate. A garage needs a paved driveway. The guide says buildings of 200 square feet or more need both zoning and building permits, while the zoning FAQ and forms put the building permit line at over 200 square feet, so ask before building one of exactly 200 square feet. The city does not enforce private covenants or deed restrictions.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
The city’s master plan examiner reviews commercial and multi-family plans, and the building official and fire official review them too. A new or relocating business needs a Certificate of Zoning Compliance for the use first, then a building permit for occupancy; tenant changes need a detailed floor plan, and the city posts a sample. The city has no general business license, but building, sign and occupancy permits are required.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Step one of the city’s process is checking with Planning whether a Certificate of Zoning Compliance is needed or the site is in the Architectural Preservation District. Staff-level zoning approvals take about 5 to 10 working days. Planning and zoning cases, record plats and appeals must be filed in person.
- Planning Commission. Meets at 7:00 p.m. on the last Tuesday of each month in Council Chambers and also sits as the Board of Zoning Appeals when a variance or appeal is filed.
- Board of Architectural Review. Meets at 5:30 p.m. on the first Tuesday of each month to decide changes in the Architectural Preservation District and to designated landmarks.
- Floodplain and drainage. Floodplain, grading and stormwater reviews are zoning certificates of $60 each; flood maps and studies can be seen at the Public Works facility.
Centerville permit costs and fees
Zoning and development fees are set by Section 1214.02 of the Unified Development Ordinance (Ordinance 3-09, passed June 15, 2009, amended by Ordinance 16-11, passed November 21, 2011). Building department fees are not printed on the city’s permit pages or forms: under the city’s approval process the fee is charged once the application is approved, so ask Building Inspection for the amount for your job. Applications add the state assessment, 1% for residential and 3% for commercial work.
| Item | Fee |
|---|---|
| Zoning certificate: accessory building, accessory use, fence or change of use | $30 each |
| Floodplain review / grading plan / stormwater drainage review | $60 each |
| Minor site plan / major site plan / development plan | $100 / $400 / $750 |
| Permanent sign / temporary sign or sign re-face | $75 / $35 |
| Variance / appeal | $400 / $300 |
| Conditional use / rezoning | $800 each |
| Demolition zoning certificate | $50 |
| Residential lot split or combination | $100 |
| Zoning verification letter | $40 |
| Driveway apron in the right-of-way (unless on a separate right-of-way permit) | $35 |
| Trade contractor registration with Building Inspection, per calendar year | $150 one trade; $250 two; $350 three |
Rather talk it over?
Call 1-855-478-4290 →Example from the schedule: a homeowner adding a 240-square-foot detached garage pays a $30 accessory building zoning certificate, plus the building department’s fee because the structure is over 200 square feet. The Planning Department takes checks made out to the City of Centerville, cash and credit cards. Contractor registration fees are not refunded or prorated.
Trade permits and who may pull them
Centerville inspects its own electrical, plumbing, HVAC and gas piping work. That makes it one of four Montgomery County cities where Public Health – Dayton & Montgomery County does not run plumbing inspections, though the health district still issues permits for on-premise sewer, water and irrigation or deduct meter installations in the city.
- Registration. Electrical, fuel gas piping, HVAC and plumbing contractors must register with the city each calendar year, January 1 to December 31, and city ordinance requires the matching state license. The fee is $150 per trade, $250 for two or $350 for three.
- Gas piping. There is no separate gas piping registration; registered HVAC and plumbing contractors may pull gas piping permits and do the work.
- Licenses. The state OCILB licenses commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors; Ohio has no state general-contractor license, and the city’s registration list covers only the four trades above.
- Signing. The applicant certifies on the plan approval form that the owner of record authorized the work and agrees to call for every required inspection.
Rather not deal with the building department?
Get a free quote →How to apply for a Centerville building permit
Ask Planning whether you need a zoning permit or Certificate of Zoning Compliance, or whether the site is in the Architectural Preservation District.
Plans are required for new construction, remodeling, commercial changes of use, electrical, fire protection, HVAC, gas piping and plumbing.
Use the city portal, or bring the plan approval form and one set of plans to 100 W Spring Valley Road; paper plans are scanned and kept electronically.
The Planning Department asks applicants to apply for the building permit in the portal together with the zoning permit.
The plans examiner, building official and fire official mark anything that does not meet code.
The department charges its standard inspection and filing fee once the application is approved.
The permit holder books each required inspection.
Review, corrections and what causes delay
The city asks for residential plans at least two weeks before the planned start and commercial or multi-family plans three weeks ahead. A portal application counts as complete only when every document is in, and approvals cannot issue until the plans meet all codes. Zoning applications are officially received only once the forms, plan sets and fees are all in; a sign or site plan needs three or six copies when filed on paper.
Inspections and certificates in Centerville
Call 937-428-4786 for inspections, either the day before or between 8:00 and 9:00 a.m. on the day you need one. City inspectors make the routine inspections required during construction, and scheduling them is the applicant’s duty. When the work is complete and matches the approved plans, the Building Official gives final approval and issues a certificate of occupancy where one applies.
A business moving into an existing space needs both the zoning certificate for the use and a building permit for occupancy before it opens.
Rental homes have their own inspection cycle. Under a program City Council approved in July 2006 (Chapter 840 of the Municipal Code), every residential rental unit gets an interior and exterior inspection every two years against the property maintenance and zoning codes. The routine inspection is free, inspectors work only with the owner or the owner’s agent present, and a return visit for unfixed violations can be billed at $75 an hour. Questions go to the Code Enforcement Office at 937-433-7151, and the city reminds landlords that Ohio law also requires rental properties to be registered with the Montgomery County Auditor.
Ohio building code in Centerville
Centerville enforces the statewide Ohio codes through its own certified department. FEMA’s Community Status Book lists the City of Centerville (community 390408), in Greene and Montgomery counties, as participating in the National Flood Insurance Program, with current flood maps effective October 27, 2022.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Centerville permit search and official resources
Applicants can track an application’s status in their portal account. For past permits or plans on a property, Centerville takes public records requests on its form for non-police records, under its posted public records policy.
- Centerville Building Inspection
- City online permitting portal
- Building permit approval process
- Building applications and forms
- Application for Plan Approval
- Trade contractor registration
- Planning and Zoning
- Zoning permit applications and how-to sheets
- Unified Development Ordinance fee schedule, Section 1214.02
- Accessory structure guidelines
- Residential rental inspection program
- Planning Commission
- Board of Architectural Review
- Public right-of-way permits
- Flood plains
- Public records requests
- Public Health – Dayton & Montgomery County plumbing
Inspections are where schedules slip.
Get a free quote →Centerville building permit FAQs
Does Centerville issue its own building permits?
Yes. Its building department is certified by the Ohio Board of Building Standards for commercial and residential work, including electrical, gas piping, HVAC and plumbing.
Do I need a permit for a shed in Centerville?
Every shed needs an accessory structure zoning permit ($30); a shed over 200 square feet also needs a building permit.
Do I need a permit for a deck?
A zoning permit always, and a building permit when the deck is over 200 square feet, attached to the house or more than 30 inches above grade.
Does a contractor need to register?
Electrical, gas piping, HVAC and plumbing contractors register each calendar year with a state license: $150 for one trade, $250 for two, $350 for three.
How do I schedule an inspection?
Call 937-428-4786 the day before, or between 8:00 and 9:00 a.m. the same day.
How early should I submit plans?
At least two weeks before the start for residential work and three weeks for commercial and multi-family projects.
How long does a zoning permit take?
About 5 to 10 working days for applications staff can approve; incomplete or complex applications take longer.
Simplify Centerville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Centerville sooner?
Let Alliance prepare, file, and track your Centerville permits while your crew stays on the job.
More Ohio permitting guides
Montgomery County
Read guide →Dayton
Read guide →Englewood
Read guide →Chillicothe Building Permit Guide
Read guide →Cincinnati Building Permit Guide
Read guide →Clark County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Centerville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.