The City of Springboro permits its own construction. The Building and Zoning Division of the Department of Public Service, 320 West Central Avenue (937-748-9791), is state certified to inspect all types of construction: it examines plans, issues building, electrical, HVAC, gas and zoning permits and inspects residential and commercial work. Since January 1, 2022 every application and set of drawings must be a PDF, sent to build@cityofspringboro.com. Fees follow the city’s posted 2026 fee sheet, for example $80 plus $0.25 a square foot for a residential remodel or addition, and plumbing permits come from the Warren and Montgomery County plumbing departments.
What requires a building permit in Springboro?
The division’s permit list: new construction, additions, alterations, finished basements, remodeling, swimming pools, accessory structures, decks, sheds and fences. Its “Is a Permit Required?” chart (revised June 2017) shows, job by job, whether a zoning permit, a building permit or another permit applies.
Building permit needed
- New homes, additions, remodels and finished basements
- Garages, and accessory buildings over 200 sq ft at homes or over 120 sq ft at businesses
- Decks, patio covers, carports and patio enclosures
- Hot tubs, in-ground and above-ground pools, and storable pools more than 24 inches deep
- Commercial tents over 400 sq ft and signs at commercial properties
- Exterior changes in the historic district
- Replacing roof decking, rafters or trusses
No building permit on the chart
- Fences (zoning permit only, $45)
- Patios, private walks and play structures
- Window and door replacement
- Driveway resurfacing, aprons up to 20 feet wide and new driveways up to 20 feet at the right-of-way
- Flag poles and backflow devices
- A second layer of asphalt shingles over one existing layer
Air conditioners, furnaces, wiring, irrigation systems and sump pumps need an “other” permit even where no building permit applies, and every structure must meet setbacks whatever its size. A roof may carry no more than two layers of shingles.
What Springboro decides and what the state holds
The Ohio Board of Building Standards sets the construction codes and certified Springboro’s department to enforce them. The city writes its own zoning code and map, its solar energy rules in Chapter 1276, its Chapter 1448 floodplain rules, its historic district and landmark protections, and its fees; the codified fee schedule is Section 1464.05.
Springboro building department: who handles permitting
The Building and Zoning Division handles all activities tied to building residential and commercial structures in the city. Plans are examined, permits issued and work inspected by city staff under Chief Building Official Tad Stoll (937-748-5780). A zoning inspector in the same office rules on setbacks, fence location and height, accessory building size and signs, and takes property maintenance complaints.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Building and Zoning Division | 320 West Central Avenue, Springboro, OH 45066; 937-748-9791; fax 937-748-6860; Monday to Friday 8 a.m. to 4:30 p.m. (the permits page lists 4 p.m.) |
| Applications | PDF files to build@cityofspringboro.com |
| Planning Department | Zoning amendments, subdivisions, site plans, historic preservation and solar reviews; 937-748-6183 |
| Engineering | Development review, right-of-way permits, water and sewer taps for commercial sites, floodplain administration |
| Plumbing, Warren County | Warren County Health District Plumbing Division, 513-695-1228; permits through its iWorQ portal |
| Plumbing, Montgomery County | Public Health – Dayton & Montgomery County, 117 S Main Street, Dayton; 937-225-4421 |
The city says the Warren and Montgomery County plumbing departments handle plumbing for Springboro, so ask Building and Zoning which county office covers your address before booking a plumber’s permit.
Springboro permit types
One building permit application covers residential and commercial work, but the form says each discipline and each address needs its own application: building, electrical, HVAC, gas, fire suppression, fire alarm, or commercial kitchen hood and suppression.
Residential permits
- New homes and additions: construction documents and a site plan; a $45 zoning fee and the Park/Playground fee are added for a new dwelling.
- Pools and hot tubs: every above-ground and in-ground pool also needs an electrical permit; the city posts barrier and electrical rules for pools and a spa and hot tub guideline.
- Gas: a new gas furnace needs a separate gas permit, but a replacement furnace does not.
- Fences: a site plan with the fence highlighted, its height and type, and whether it encloses a pool or sits on a corner lot or in the Olde Springboro Architectural District; the finished side must face out.
- Solar: a no-fee Solar Energy System Permit from the City Planner, then a no-fee electrical permit; ground arrays stay out of front yards.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
A business that moves into an existing space files a $45 Certificate of Zoning Compliance and confirms it has contacted the city tax department. Tents over 400 square feet, signs and fire and hood systems each take their own application.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The Planning Department writes the zoning code and subdivision rules; the Planning Commission meets at 6 p.m. on the second Wednesday of each month in Council Chambers and reviews planned unit developments, site plans and rezonings.
- Historic district. The city’s 50-acre historic district has more than 90 contributing structures, and five landmarks sit outside it. Exterior changes there need a certificate of appropriateness from the Architectural Review Board, which meets at 6 p.m. on the second Monday of each month at 320 West Central Avenue. An ordinance creating Section 1272.13, Landmark Properties, with a fee in Section 1464.05, was on the November 5, 2026 Council agenda for its third reading.
- Floodplain. The building application asks whether the property is in a floodplain; if it is, a separate floodplain development permit from the City Engineer, the floodplain administrator, is required first.
- Streets and utilities. Work in the public right-of-way takes a $54 right-of-way permit with drawings, a traffic plan, 24 hours’ notice and $1,000,000 of insurance, and new homes buy water and sewer taps on the city’s water and sewer application.
Not sure this scope needs a permit?
Get a free quote →Springboro permit costs and fees
The city’s posted “Building Permit Fees 2026” sheet (dated October 2026) lists every building, trade and inspection charge; the city describes its fee schedule as incorporating all fees it charges. Residential fees carry the 1% state fee and commercial fees the 3% state fee, matching the Board of Building Standards assessment of 1% on residential and 3% on nonresidential work.
| Work | Fee |
|---|---|
| New residential dwelling | $396 base + $16.76 per 100 sq ft living + $5.59 per 100 sq ft non-living + $28.25 plan review |
| New dwelling add-ons | $1,500 Park/Playground + $45 zoning |
| Residential remodel or addition | $80 + $0.25 per sq ft |
| Residential accessory structure / deck | $80 + $0.15 per sq ft / $80 + $0.20 per sq ft |
| Residential pool / storable pool | $100 / $26.75 a year |
| Residential electrical | $80 + $0.04 per sq ft; service change $125; temporary pole $90 |
| Residential HVAC | New: $80 + $0.03 per sq ft; replacement $100 |
| Residential gas line | $127.50 |
| Commercial building or addition | $150 + $45 per 100 sq ft, plus plan review; $929 Park/Playground for a new building |
| Commercial remodel | $150 + $35 per 100 sq ft, plus plan review |
| Commercial plan review | First hour $0; over 1 to 3 hours $96; over 3 hours $234 + $90 an hour |
| Re-inspection | $75 residential / $125 commercial |
| Permit extension | $100 plus state fee |
| Zoning compliance certificate / fence | $45 / $45 |
| Right-of-way permit | $54 application fee |
| Storm water utility | $600 single-family; $150 a unit for 4 or more units; $600–$1,500 commercial by size |
Rather talk it over?
Call 1-855-478-4290 →Where square footage cannot be measured, remodels are priced from cost instead: $80 plus $37.50 up to $5,000, $48.25 for $5,001 to $10,000 or $60 above that, plus $9.75 per $1,000 over $10,000 and $20 per required inspection. Worked examples from the sheet: finishing 500 square feet of basement costs $80 + (500 × $0.25) = $205, and a new house with 2,000 square feet of living space and 600 square feet of garage and other non-living space costs $396 + (20 × $16.76) + (6 × $5.59) + $28.25 = $792.99, plus $1,500 Park/Playground and $45 zoning, before the 1% state fee and the trade permits. The deck line on the 2026 sheet adds a $45 zoning fee, while the 2017 permit chart shows no zoning permit for decks; ask the counter which applies.
Water and sewer taps are billed on the city’s water and sewer application (February 2025 fees): a 1-inch water and sewer connection totals $9,910 in subdivisions platted before September 1, 1994 and $9,243 in later ones.
Trade permits and who may pull them
Electrical, HVAC and gas permits are city permits on the same application form, each filed separately and inspected by city staff. The posted Springboro forms ask for the contractor’s name, address, phone and email but do not set up a city contractor registration; commercial electrical, HVAC, plumbing, hydronics and refrigeration contractors hold Ohio Construction Industry Licensing Board licenses, and Ohio has no state license for general or residential contractors.
- Electrical: pools need $175 and hot tubs $140 electrical permits; solar arrays take a free electrical permit, with no extension fee since February 15, 2024.
- Plumbing in the Warren County part of the city: the Health District’s Plumbing Division reviews plans and inspects, takes permits and contractor registrations ($100) only through iWorQ, and charges $60 for a permit with one fixture plus $20 per extra fixture, or $50 for a water heater alone; fees double if work started first.
- Plumbing in the Montgomery County part: Public Health – Dayton & Montgomery County charges $45 for a new installation and $30 for a replacement, plus $14 per fixture, and lets homeowners take out plumbing permits for their own homes with a notarized affidavit and a $50 cash bond.
- Backflow and irrigation: the Health District sends Springboro water customers to the city (937-748-0020) for backflow device testing, and City Water Department staff inspect irrigation systems (937-748-0020 ext. 110).
How to apply for a Springboro building permit
Use the “Is a Permit Required?” chart to see which zoning, building and other permits your project needs.
Confirm setbacks with the zoning inspector; in the historic district get a certificate of appropriateness, and for a new site plan or PUD go to the Planning Commission.
Construction documents and a site plan in PDF only; hard copies are no longer accepted.
Building, electrical, HVAC and gas each need their own application.
Send it to build@cityofspringboro.com; add the floodplain permit, right-of-way permit or water and sewer application if the job needs one.
Through the county plumbing department that covers the address.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Plan revisions are filed with the city’s Revision Submittal Sheet. Commercial plan review is free for the first hour but billed after that, so incomplete commercial drawings add cost as well as time. The application form itself flags the usual gaps: a floodplain property needs its separate floodplain permit, a pool needs its electrical permit, and every discipline and address needs its own form. Solar permits expire 12 months after issue, with one 12-month extension if the owner asks in writing at least 10 days before expiry.
Inspections and certificates in Springboro
Call 937-748-9791 by 4:30 p.m. the day before with the address, permit number and type of inspection, then call between 8:30 and 9:00 a.m. on the day to get a time window. At every inspection the approved drawings must be on site, printed or on a laptop or tablet; a smartphone copy is refused.
The residential guide runs from footing, foundation and backfill through the rough trade inspections, rough framing (only after every rough trade inspection passes), insulation, sump line, sidewalk, driveway approach and water valve box to the finals. Sidewalks must be 4 inches thick and 6 inches through the driveway, and the final needs seed or sod in place or a signed landscape agreement. Commercial jobs add an above-ceiling inspection, fire suppression and alarm tests witnessed by the Building and Fire Departments, and a final exterior lighting and landscaping inspection backed by an as-built site drawing. A certificate of occupancy or temporary certificate must be issued before anyone moves in; for commercial buildings the water meter must be set first.
Ohio building code in Springboro
Springboro enforces the statewide codes through its own certified department and posts a current-codes sheet for residential and commercial work. Flood rules are local: Ordinance O-25-8, adopted March 6, 2025, replaced Chapter 1448, Flood Damage Reduction, from April 23, 2025, sets the flood protection elevation at the base flood elevation plus 1.5 feet of freeboard, and requires a floodplain development permit before any building, filling or grading in a special flood hazard area. FEMA’s Community Status Book lists the City of Springboro (community 390564) as participating in the National Flood Insurance Program, with current flood maps effective April 23, 2025.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Springboro permit search and official resources
The city posts monthly residential and commercial building permit reports on its Permit Reports page. For older plans or permit files on a property, ask the Building and Zoning Division; plumbing records sit with the county plumbing department that issued the permit.
- Springboro Building and Zoning Division
- Permits and applications
- Building Permit Fees 2026 (PDF)
- Is a permit required? chart (PDF)
- Building permit application (PDF)
- Certificate of zoning compliance application (PDF)
- Fence permit application (PDF)
- Water and sewer application and fees (PDF)
- Right-of-way permit application (PDF)
- Residential inspection guide (PDF)
- Commercial inspection guide (PDF)
- Residential roofing FAQ (PDF)
- Solar energy permit for residential property
- Permit reports
- Planning Department
- Planning applications
- Planning Commission
- Architectural Review Board
- Engineering
- Floodplain management regulations, effective April 23, 2025 (PDF)
- Warren County Health District Plumbing Division
- Public Health – Dayton & Montgomery County plumbing
- Ohio Board of Building Standards
Inspections are where schedules slip.
Get a free quote →Springboro building permit FAQs
Does Springboro issue its own building permits?
Yes. Its Building and Zoning Division is state certified to inspect all types of construction and handles plans, permits and inspections for homes and commercial buildings.
How do I submit a permit application in Springboro?
Email the application, drawings and site plan as PDF files to build@cityofspringboro.com. Paper sets have not been accepted since January 1, 2022.
Do I need a permit for a fence in Springboro?
A $45 zoning permit, with a site plan showing the fence. The permit chart shows no building permit for fences.
How much does a deck permit cost?
$80 plus $0.20 a square foot, so $140 for a 300-square-foot deck, plus the 1% state fee; the 2026 sheet also lists a $45 zoning fee for decks.
Do I need a permit to re-roof?
Not for a second layer of asphalt shingles over one existing layer. Replacing roof decking, rafters or trusses needs a permit and inspections.
Who handles plumbing permits in Springboro?
The Warren County Health District Plumbing Division or Public Health – Dayton & Montgomery County, not the city; ask Building and Zoning which one covers your address.
How do I book an inspection?
Call 937-748-9791 by 4:30 p.m. the day before, then call between 8:30 and 9:00 a.m. on the day for your time.
Simplify Springboro permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Springboro sooner?
Let Alliance prepare, file, and track your Springboro permits while your crew stays on the job.
More Ohio permitting guides
Warren County
Read guide →Mason
Read guide →Butler County
Read guide →Springdale Building Permit Guide
Read guide →Springfield Building Permit Guide
Read guide →Stark County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Springboro permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.