Carroll County’s own list of departments includes no building department or building inspector. The county offices that do issue approvals are the Carroll County General Health District (330-627-4866), which permits septic and gray water systems and runs the county’s only plumbing program, for commercial buildings; the Regional Planning Commission (330-627-5611), which approves lot splits and subdivisions and assigns house numbers; the County Engineer for county roads; and Environmental Services for sewer connections in its districts. For the building department with authority over an address, use the Ohio Board of Building Standards look-up map.
What requires a permit in Carroll County?
Carroll County’s offices issue permits through the health district, Regional Planning and Environmental Services, but not through any county building office. Which approvals a project needs therefore depends on what it is and where it sits.
County-level permits and approvals
- New and replacement sewage treatment systems and gray water recycling systems: Health District permit
- Private water systems (wells): Health District
- Plumbing in a new commercial building with plumbing fixtures: Health District plumbing permit
- Lot splits under 5 acres and major subdivisions: Regional Planning Commission
- House numbers for new construction: Regional Planning Commission
- Connections to a county sewer system: Environmental Services permit and tap fee
Where the state code reaches
- Commercial and other nonresidential buildings need plan approval from a certified department, or from the state where none has jurisdiction
- Houses are reviewed only where a department certified for residential work has jurisdiction
- Where no certified residential department has jurisdiction, house plans do not have to be submitted
The health district’s plumbing page is explicit that the county has only a commercial plumbing program, so the district’s plumbing permits cover commercial buildings only. Septic work is a different matter: the district handles the permits for household sewage treatment systems and inspects every new and replacement installation.
What the county decides and what the state holds
The building codes and the certification of building departments are the state’s. Locally, the Board of Commissioners adopts the sewer rules and rates for Environmental Services, the Regional Planning Commission enforces the 2024 subdivision regulations and handles variances to them, and the health district adopts its sewage and plumbing fees (household sewage fees adopted December 18, 2024; plumbing fees adopted August 19, 2015 by Resolution 15-021).
Carroll County building department: who handles permitting
The county government’s department list runs from the Auditor and Engineer to Environmental Services, the Health Department, Regional Planning and the Soil and Water Conservation District, with no building department among them. For the certified department, if any, that reviews buildings at a particular address, check the Board of Building Standards look-up map before planning a project.
Short on time to read all of this?
Get a free quote →| Office | What it handles and how to reach it |
|---|---|
| Carroll County General Health District, Environmental Health | Septic and gray water permits, wells, commercial plumbing, point-of-sale inspections; 301 Moody Avenue SW, Carrollton, OH 44615; 330-627-4866 (plumbing plans ext. 1522); Monday to Friday, 8 a.m. to 4 p.m. |
| Regional Planning Commission | Subdivisions, lot splits, variances, house numbers; 119 South Lisbon Street, 3rd floor, Carrollton; 330-627-5611; Monday to Friday, 8 a.m. to 4 p.m., closed noon to 1 p.m.; Director Lynda Wickline |
| County Engineer | County roads and bridges, engineering for townships, county maps; 200 Kensington Road NE, Carrollton; 330-627-4110; Monday to Friday, 7 a.m. to 3:30 p.m. |
| Environmental Services | County wastewater service, sewer connections and tap fees; 620 West Canal Street, Malvern; 330-863-1515; Monday to Friday, 8 a.m. to 3 p.m. |
| Soil and Water Conservation District | 1029 Countryside Drive NW; 330-627-9852 |
| Board of Commissioners | 119 South Lisbon Street, Suite 201; 330-627-4869; meets Mondays and Thursdays at 9 a.m. |
| County Auditor (parcel records) | 119 South Lisbon Street, Suite 203; 330-627-2250 |
Villages and townships
| Place | Building permits |
|---|---|
| Carrollton village (3,052) | The published sources do not say; ask the village |
| Minerva village, Carroll County part (1,717) | The published sources do not say; Minerva also lies in neighboring counties, so ask the village |
| Malvern village (1,092) | The published sources do not say; ask the village |
| Magnolia village, Carroll County part (320) | The published sources do not say; ask the village |
| Dellroy (262), Sherrodsville (217), Leesville (126) villages | The published sources do not say; ask the village office |
| Townships | No county building department; check the BBS look-up map, and ask Regional Planning, which the county lists as managing zoning and land use planning |
Not sure this scope needs a permit?
Get a free quote →The county had 26,475 residents in the Census Bureau’s 2025 estimate. Carroll County has no city; all seven incorporated places are villages.
Carroll County permit types
Each county office has its own applications: Regional Planning posts its subdivision, lot split, house number and variance forms; the health district posts its sewage procedures and its plumbing plan review, bond and registration packet; and Environmental Services posts its rules, rates and new service request.
Residential permits
- Septic system for a new home. A soil scientist must analyze the soil before a system is designed, using 60-inch test pits dug with excavation equipment; the district then follows its new build procedures and site review.
- Replacement septic system, under the district’s replacement procedures, and a sewer accessibility determination where public sewer may be within reach.
- Well, through the district’s private water systems program.
- House number from Regional Planning for any new construction.
- Sewer tap from Environmental Services where the lot is in one of its service areas.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
A new commercial building with plumbing fixtures needs a health district plumbing permit, with plans submitted to the district first (call 330-627-4866, ext. 1522, to discuss the process). The building itself needs plan approval from the certified department with jurisdiction, or from the state’s Superintendent of Industrial Compliance where no certified department has it. Under the Brown Township–Malvern Sewer District rules that Environmental Services posts, commercial sewer connections are charged tap fees by use: restaurants by seats, offices by employees, and warehouses and shopping centers by floor area.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Lot creation: Regional Planning reviews and approves minor and major subdivisions, plats and re-plats under the 2024 subdivision regulations.
- Soil and septic: the soil evaluation and the health district’s site review come before a septic design.
- Sewer: under the rules Environmental Services posts, no connection may be made without its permit, and the permit is not issued until the tap fee is paid.
- Roads: the County Engineer builds and maintains county roads and bridges and provides engineering services to the townships.
- Flood areas: unincorporated Carroll County takes part in the federal flood insurance program; ask the county about mapped flood hazard areas before building in one.
Rather talk it over?
Call 1-855-478-4290 →Carroll County permit costs and fees
There is no county building permit fee because the county lists no building department. The published county fees belong to Regional Planning, the health district and Environmental Services.
| Item | Fee |
|---|---|
| Minor subdivision lot split (under 5 acres) | $50 |
| Major subdivision preliminary plat / final plat | $100 + $10 per lot, each |
| Subdivision variance (nonrefundable) / re-plat | $50 / $50 |
| Commercial plumbing permit application (includes 2 inspections) | $200 |
| Plumbing: trap charge / water heater / interceptor | $15 / $20 / $20 |
| Plumbing: backflow / sewage ejector / water service | $25 / $25 / $30 |
| Plumbing plan review: remodel / new construction | $100 / $200 |
| Plumbing re-inspection / contractor registration | $150 / $70 |
| Late plumbing permit penalty | 200% of the permit fee |
| Household sewage system permits | Health district fees adopted December 18, 2024 |
| Sewer tap (Brown Township–Malvern Sewer District rules) | Tap fee per residential equivalent unit (a house is 1.0), plus the permit charge |
| County sewer service from January 1, 2027 (single residence) | $33.88 a month + $3.12 debt retirement |
The plumbing fees date from the district’s 2015 resolution; ask the district how the trap and fixture charges apply to your plans. Sewer rates for Environmental Services customers rise by $2 a month on January 1, 2027 under Resolution 2026-20, adopted April 23, 2026.
Trade permits and who may pull them
Plumbing is the one trade the county permits, and only for commercial buildings. The health district lists the licensed plumbers registered with it and posts a 2026 plumbing bond form and registration packet; registration costs $70.
Rather not deal with the Carroll County building department?
Get a free quote →- Sewage system contractors: the health district posts its 2025 lists of licensed septic installers, registered septic haulers and service providers, together with the certified soil scientists and septic designers.
- Sewer builders: work on a connection to a county sewer is done under an Environmental Services permit, which must be kept on the job while the work is in progress.
- State licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors hold Ohio Construction Industry Licensing Board licenses; Ohio has no state license for general or residential contractors.
How to apply for permits in Carroll County
Use the County Auditor’s records to find the township or village, and the BBS look-up map to see whether a certified department covers it.
File a lot split or subdivision with Regional Planning where a new lot is created.
Have a soil scientist evaluate the site, then apply to the health district for the septic permit, or to Environmental Services for a sewer tap.
Apply to the health district for a well where there is no public water.
Apply to Regional Planning for the address of the new building.
Commercial plans go to the certified department or the state, with commercial plumbing plans to the health district.
Review, corrections and what causes delay
A soil scientist’s analysis, with 60-inch test pits, is required before any new septic system is designed. A commercial plumbing permit taken out late costs 200% of the permit fee, and a sewer permit is not issued until the tap fee is paid. Subdivision variances go through Regional Planning, whose executive committee includes county, township and village representatives. Where a certified department approves plans, the state codes void the approval if work has not started within 12 months.
Inspections and certificates in Carroll County
The health district’s environmental health specialists inspect every new and replacement sewage system as it is installed: the septic tank and leach lines for level installation on the proper contour, installation to the approved design, the soil depths and the cover. At start-up they check mechanical parts such as pumps, aerators, failsafe devices and spray irrigation. The commercial plumbing application includes two inspections, and each re-inspection costs $150.
Environmental Services inspects and approves each sewer connection it permits and keeps a record of it. Where a certified building department has jurisdiction, it inspects the building and issues the certificate of occupancy; the health district also runs point-of-sale inspections for property sales.
Want this handled start to finish?
Get a free quote →Ohio building code in Carroll County
The state codes apply through whichever certified department has jurisdiction; the county itself lists none. FEMA’s Community Status Book lists unincorporated Carroll County (community 390763) as participating in the National Flood Insurance Program, with a current flood map dated September 14, 2018.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Carroll County permit search and official resources
Ask each office for its own records: the health district for septic, well and commercial plumbing permits, Regional Planning for subdivision approvals and house numbers, Environmental Services for sewer permits, and the County Auditor for parcel records.
- Carroll County departments list
- Carroll County Regional Planning Commission
- Health District wastewater treatment (septic)
- Health District commercial plumbing
- Carroll County Environmental Services
- Environmental Services rates and policies
- Resolution 2026-20, 2027 sewer rates
- Environmental Services rules and regulations
- Carroll County, Ohio
- BBS building-department look-up map
- Ohio Construction Industry Licensing Board
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Carroll County building permit FAQs
Does Carroll County have a building department?
The county’s own department list shows none; check the Board of Building Standards look-up map for the address.
Do I need a permit for a septic system?
Yes. The Carroll County General Health District permits and inspects every new and replacement system, after a soil scientist’s evaluation.
Do I need a plumbing permit for my house?
The county has only a commercial plumbing program, run by the health district; it covers new commercial buildings with plumbing fixtures.
How much does a lot split cost?
$50 for a minor subdivision lot split under 5 acres, through the Regional Planning Commission.
How do I get a house number?
Apply to the Regional Planning Commission, which assigns official house numbers for new construction.
What does a commercial plumbing permit cost?
A $200 application covering two inspections, plus fixture charges such as the $15 trap charge, and plan review of $100 (remodel) or $200 (new construction).
Are sewer rates changing?
Yes. Environmental Services rates rise $2 a month on January 1, 2027; a single residence pays $33.88 a month plus $3.12 for debt retirement.
Simplify Carroll County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Carroll County sooner?
Let Alliance prepare, file, and track your Carroll County permits while your crew stays on the job.
More Ohio permitting guides
Columbiana County
Read guide →Tuscarawas County
Read guide →Harrison County
Read guide →Centerville Building Permit Guide
Read guide →Champaign County Building Permit Guide
Read guide →Chillicothe Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Carroll County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.