Columbiana County, with its seat at Lisbon and 99,377 people in the Census Bureau’s 2025 estimate, lists no county building department among its offices, so who reviews a building depends on where it stands. Elevate Building Solutions, a department the cities of Columbiana and Salem set up in 2023 at 440 Pennsylvania Avenue, Salem (330-537-1536), handles commercial work in Columbiana, Salem, East Palestine and Leetonia and house permits in Columbiana and Leetonia. East Liverpool issues building permits through its Planning Department. Countywide, the Columbiana County General Health District sells plumbing permits and permits septic systems and private wells.
What requires a building permit in Columbiana County?
No county-level permit list exists, because the county does not issue building permits. What needs one is set by the department that has authority over the address. Elevate, for example, says any major repair, alteration or new construction of a commercial or residential building in the towns it serves needs a permit, and that commercial alterations and new buildings need plans stamped by a state-licensed architect.
Countywide health permits
- Plumbing work, by a state-licensed plumber registered with the health district
- New, replacement or altered household sewage treatment systems
- Site reviews and soil evaluations for septic systems
- Constructing, altering or sealing a private water well
- Lot splits and subdivisions reviewed for sewage
Local building permits
- Commercial building, electrical, mechanical and fire systems in the Elevate towns
- House building and mechanical permits in Columbiana and Leetonia
- Building and zoning certificates in East Liverpool
- Zoning permits from each city or village zoning office
- Elsewhere, whatever the department on the BBS look-up map requires
Where no certified building department has jurisdiction, the state rule applies: plans for a nonresidential building go to the Superintendent of Industrial Compliance, and an owner is not required to submit plans for a house (ORC 3791.04). Elevate says the state no longer takes commercial plan review or permit requests for Columbiana, Salem, East Palestine and Leetonia.
What Columbiana County decides and what the state holds
The building codes and the certification of departments are state matters, and the county has not set up a department of its own. The county’s role in permitting runs mainly through the General Health District, whose board sets environmental fees and keeps its own plumbing code and local sewage rule, and through the County Planning Commission, which the health district names for lot splits. Cities and villages set their own zoning, fees and contractor registration.
Columbiana County building department: who handles permitting
Elevate Building Solutions LLC was formed in 2023 by the cities of Columbiana and Salem to handle their commercial building needs, with plan review and inspections by certified building inspectors; its site now also lists residential service and two villages.
Short on time to read all of this?
Get a free quote →| Place | Building department |
|---|---|
| City of Columbiana (5,945 people in the county part); Village of Leetonia | Elevate Building Solutions, commercial and residential |
| City of Salem (11,650 in the county part); Village of East Palestine | Elevate Building Solutions, commercial only |
| City of East Liverpool (9,569) | City Planning and Zoning Department, 330-385-5394, option 1, by appointment |
| Lisbon, Wellsville, Salineville, New Waterford, Hanoverton, Rogers, Summitville, Washingtonville and the county parts of Minerva; the townships | Not covered by Elevate, East Liverpool or the county; ask the village or township and check the BBS look-up map |
| Detail | Information |
|---|---|
| Elevate Building Solutions | SOD Center, 440 Pennsylvania Avenue, Salem, OH 44460; 330-537-1536; Monday to Thursday 8:30 a.m. to 3:30 p.m., Friday 8:30 a.m. to 1:30 p.m. |
| East Liverpool Planning and Zoning | 330-385-5394, option 1, to book an appointment for zoning or building permits |
| Columbiana County General Health District | 7360 State Route 45, P.O. Box 309, Lisbon, OH 44432; 330-424-0272; Monday to Friday 8:00 a.m. to 4:00 p.m. |
| Plumbing inspector | 330-424-0272, ext. 117, between 8:00 and 10:00 a.m. |
| Electrical permits in the City of Columbiana | Central Electric Inspection Bureau, 201 East Commerce Street, Youngstown; 330-744-5238 |
To find the office for a parcel, confirm whether it is inside a city or village, then check the Board of Building Standards look-up map, which shows the certified department for commercial and residential work at an address. Salem and Columbiana each reach a little way into Mahoning County, and Minerva, Washingtonville and Columbiana extend into neighboring counties as well.
Columbiana County permit types
Residential permits
Elevate’s process for a house in the City of Columbiana shows how the pieces fit. The zoning permit comes first from the city’s Zoning Department (330-482-2173), which may also collect water tap, sewer tap, meter and electric connection fees. Elevate then issues building and mechanical permits only: electrical permits come from the Central Electric Inspection Bureau and plumbing permits from the county health district. Two sets of drawings to scale go in for review, which usually takes one to two working days, showing building and utility locations, footing sizes and depths, foundation, floor, wall and roof construction, insulation, anchor bolts and energy compliance. The building official may ask for drawings sealed by an Ohio registered design professional. After approval you are emailed an invoice; once it is paid you receive the certificate of plan approval, permits, stamped drawings and window placards.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
For commercial work in the City of Columbiana, Elevate’s steps are zoning first (use, site design, parking, landscaping, lighting, signs, and site plan and stormwater drainage approval), then plan review. It suggests a pre-application meeting with the building official, a digital copy and three paper sets of documents by an Ohio-licensed design professional (its FAQ says four copies), and a $309 plan review deposit; the master plans examiner and the city’s fire official review them, and Elevate allows up to 30 days. After plan approval you apply for building, electrical, mechanical and fire system permits, and large projects get a pre-construction meeting.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Every Elevate town has its own zoning department, separate from the building department. East Liverpool issues zoning certificates under its own fee schedule, and its Planning Department also staffs the Design Review Board, Planning Commission and Board of Zoning Appeals and takes certificate of occupancy and change of occupancy applications.
- Septic site review. On unsewered land, the health district’s preliminary septic approval and site review come before a house is designed; it also calculates new home sites and evaluates repairs.
- Wells. A permit from the health district is needed to build, alter or abandon a private water system.
- Lot splits. Splits and subdivisions are reviewed by the health district and the County Planning Commission.
- Contractor registration. Contractors register with the zoning department of each Elevate city; East Liverpool issues contractor’s licenses.
Columbiana County permit costs and fees
There is no county building fee schedule. Building fees are set by each department: Elevate’s schedules for the towns it serves (the Columbiana commercial deposit is $309) and East Liverpool’s posted building permit and zoning certificate fee schedules. Ask the department for the schedule in force. The fees below are the health district’s 2026 environmental fees, effective June 1, 2026, which apply across the county.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Septic site review application | $285 |
| Soil evaluation application | $595 |
| Household sewage system installation, new or replacement | $745 (includes $74 state fee) |
| Household system incremental alteration | $685 (includes $35 state fee) |
| Small flow onsite system installation; alteration | $1,362; $1,269 |
| Sewage system inspection or re-inspection | $65 |
| Abandonment of a sewage system | $80 |
| Subdivision or lot review (OAC 3701-29-08) | $880 |
| Private water system construction (single family) | $672 (includes $74 state fee) |
| Well alteration; sealing | $578; $50 |
| Real estate inspection | $240 septic; $60 well; $275 both |
| Plumbing permit base fee | $70 |
| Plumbing plan review | $60 |
| Master plumber registration | $125 new; $100 renewal before February 15 |
| Journeyman plumber registration | $25 new; $20 renewal |
| Sewage variance | $75 |
The plumbing permit is bought by mail: print the district’s form, fill it in, add the fixture fees to the $70 base fee and send it with payment. A payment that is late draws a 25% penalty under the board of health’s rules. The state assessment on local building fees (3% nonresidential, 1% residential) is added by whichever certified department issues the building permit.
Trade permits and who may pull them
Plumbing is the one trade handled countywide. The health district requires plumbing to be done by a contractor licensed by the state and registered with the district; first registration is $125, renewal is $100 if paid before February 15 and $125 after. The district publishes its list of registered master plumbers each year, its own plumbing code (2018) and registration forms for master and journeyman plumbers. Septic installers, septage pumpers and service providers register with the district too, at $100 a year each.
- Electrical: in the City of Columbiana, house electrical permits come from the Central Electric Inspection Bureau in Youngstown; in other towns the building department says who inspects.
- Commercial trades: electrical, HVAC, hydronics, plumbing and refrigeration contractors need the Ohio Construction Industry Licensing Board license, and Elevate requires state licensure and insurance before a contractor can register with a city.
- Local registration: Columbiana, Salem, East Palestine and Leetonia register contractors through their zoning departments, and East Liverpool licenses contractors. None of these pages describes permits for homeowners doing their own work.
Rather not deal with the Columbiana County building department?
Get a free quote →How to apply for a building permit in Columbiana County
Confirm the city, village or township, and check the BBS look-up map for the certified department.
Septic site review and soil evaluation, and a well permit if needed, from the health district.
From the city or village zoning office; in East Liverpool, book an appointment.
For Elevate towns, paper sets or the iWorQ portal; sealed plans for commercial work.
Elevate emails an invoice after approval and issues permits, stamped plans and placards on payment.
Plumbing from the health district; electrical where the department directs.
Review, corrections and what causes delay
Elevate quotes one to two working days for a house plan review in Columbiana and up to 30 days for commercial review; comments must be answered before approval. A contractor who has not registered with the city’s zoning department, a missing $309 deposit on a Columbiana commercial job, or plans without a design professional’s seal will hold the file.
Inspections and certificates in Columbiana County
Elevate’s inspectors work Monday to Friday from 9:00 a.m. to 2:30 p.m. On a Columbiana house, the contractor calls the building department to book inspections, certified residential inspectors carry them out, and the residential building official approves the finals and issues the certificate of occupancy. On commercial jobs, the permit package includes the list of required inspections and a project sign-off sheet, and approved plans must be on site.
Plumbing inspections are made by the health district’s plumbing inspector, who takes calls from 8:00 to 10:00 a.m. The district inspects new septic systems and can re-inspect for $65, and it carries out real estate inspections of septic systems and wells on request.
Ohio building code in Columbiana County
The towns served by Elevate and East Liverpool enforce the same statewide codes through their own departments, and the state covers commercial work where no certified department has jurisdiction. FEMA’s Community Status Book lists unincorporated Columbiana County (community 390076) as participating in the National Flood Insurance Program, with flood maps effective May 2, 2012; Salem has its own entry on the same map date, and each other city and village is listed separately.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Columbiana County permit search and official resources
Building permit records sit with the department that issued them: Elevate for the four towns it serves, East Liverpool’s Planning Department for that city, and the state for commercial work it reviewed. Septic, well and plumbing records are held by the health district in Lisbon. Commissioners’ agendas and minutes are posted on the commissioners’ site.
- Elevate Building Solutions
- Elevate frequently asked questions
- Elevate: City of Columbiana residential process
- Elevate: City of Columbiana commercial process
- Elevate contact and hours
- East Liverpool Planning Department (building and zoning permits)
- Health district plumbing permits
- Health district sewage treatment systems
- Health district private water systems
- Health district environmental fees, effective June 1, 2026
- Columbiana County government
- Columbiana County Commissioners
- BBS building department look-up map
- Ohio Board of Building Standards
- Ohio Construction Industry Licensing Board
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Columbiana County building permit FAQs
Does Columbiana County issue building permits?
No. The county lists no building department. Elevate Building Solutions, East Liverpool and the state cover different parts of the county.
Who issues permits in Salem?
Elevate Building Solutions issues Salem’s commercial permits; it offers no residential service there. Zoning stays with the city.
Who issues house permits in Columbiana or Leetonia?
Elevate, for building and mechanical work. In the City of Columbiana, electrical permits come from the Central Electric Inspection Bureau and plumbing from the health district.
Where do I get a plumbing permit?
From the Columbiana County General Health District in Lisbon, by mail, with a $70 base fee plus fixtures; the plumber must be state-licensed and registered with the district.
How much is a septic permit?
Installing a new or replacement household system costs $745, including the $74 state fee, after a $285 site review and a $595 soil evaluation application.
How do I get a building permit in East Liverpool?
Call the Planning and Zoning Department at 330-385-5394, option 1, for an appointment; it accepts exact change, checks or cards.
What if no department covers my township?
Check the BBS look-up map. Where none is certified, commercial plans go to the state and a house needs no plan submission, though health district and zoning rules still apply.
Simplify Columbiana County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Columbiana County sooner?
Let Alliance prepare, file, and track your Columbiana County permits while your crew stays on the job.
More Ohio permitting guides
Salem
Read guide →Mahoning County
Read guide →Stark County
Read guide →Columbus Building Permit Guide
Read guide →Coshocton Building Permit Guide
Read guide →Coshocton County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Columbiana County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.