Harrison County, centred on the village of Cadiz, runs a small Department of Building Inspection under the Board of County Commissioners. Its published instructions require a permit for residential new construction and additions, charged at $360 plus $4 per 100 square feet, with footer, rough-in and final inspections before a certificate of occupancy. The County Engineer is the floodplain manager and issues driveway, right-of-way and floodplain permits under Resolution 5-23, the Health Department permits septic systems and wells, and zoning applies only in Cadiz and in Archer, Freeport, Moorefield and North townships.
What requires a building permit in Harrison County?
The county’s building department publishes a short list: residential new construction and residential additions need a permit, and work in a mapped flood area needs a floodplain permit as well. Around those, the Engineer and the Health Department each require their own approvals.
County Building Department
- New homes (residential new construction)
- Residential additions
- Re-inspections when work fails or is not ready ($150 each)
- A certificate of occupancy once the footer, rough-in and final inspections pass
Other county permits
- Floodplain development permit for any construction in a special flood hazard area
- Driveway permit on a county road (free for residential, $150 commercial)
- Use of county right-of-way, boring and road-cut permits for utility work
- Logging and special hauling permits and road use maintenance agreements
- Septic system and private water system permits from the Health Department
The instructions do not mention commercial buildings, alterations without an addition, or accessory buildings, so call the Commissioners’ office before assuming such work needs no county permit. For a commercial or other nonresidential project, use the Board of Building Standards look-up to see which certified department, or the state, reviews the plans at that address.
What the county decides and what the state holds
The building codes and department certification are set by the state. The Board of County Commissioners sets the building department’s fees and adopted the Engineer’s permit fee schedule (Resolution 5-23, effective January 25, 2023); the Engineer and Auditor set the conveyance standards for deeds; the Board of Health sets septic and well fees; and Cadiz and the four zoned townships write their own zoning rules.
Short on time to read all of this?
Get a free quote →Harrison County building department: who handles permitting
The Department of Building Inspection, part of the Harrison County Commissioners’ offices, issues the county’s residential building permits and schedules its inspections; the Commissioners link its instructions from their own page and meet at the courthouse, 100 W. Market Street, Cadiz (work sessions Mondays and general meetings Wednesdays at 10:00 a.m.). The instructions give no counter address, so start with the Commissioners’ office at the courthouse; for inspections they give a scheduling line, 740-391-5966.
| Office | Role and contact |
|---|---|
| Department of Building Inspection | Residential new construction and addition permits, inspections, certificates of occupancy; Harrison County Commissioners, 100 W. Market St., Cadiz, OH 43907; inspection scheduling 740-391-5966 |
| Harrison County Engineer | Floodplain manager; driveway, right-of-way, bore, logging and hauling permits; Del George, P.E., P.S., County Engineer; 1 Service Garage Rd, Cadiz; 740-942-3086; Monday to Friday, 7:00 a.m. to 3:00 p.m. |
| Map Office | Deed and survey review, pre-approval of transfers, GIS; 100 West Market Street; 740-942-8867; 8:00 a.m. to 4:00 p.m. |
| Harrison County Health Department | Septic and private water system permits; 538 North Main St., Cadiz; 740-942-2616; 8:00 a.m. to 4:00 p.m. |
| County Water-Sewer | County water and sewer systems; 100 West Market Street; 740-942-0411; Monday to Thursday, 8:00 a.m. to 4:00 p.m. |
Villages and townships
The county lists zoning in Cadiz village (740-942-8844) and in Archer, Freeport, Moorefield and North townships, each with its own zoning contact; the other townships have no zoning regulations on the county’s list. The villages are Bowerston, Cadiz (about 2,960 people), Deersville, Freeport, Harrisville, Hopedale, Jewett, New Athens, Scio and part of Adena. The county’s instructions do not say whether its building department works inside the villages, so a village project should start with a call to the village and to the Commissioners’ office.
Harrison County permit types
The building department’s process is short, and the heavier paperwork sits with the Engineer, the Map Office and the Health Department.
Residential permits
- New homes and additions: a county building permit priced by floor area, kept at the building site at all times.
- Septic systems: a site and soil evaluation by a certified professional soil scientist, a design by a septic system designer, a Health Department site review and application, then installation by a registered installer, with inspections before the system is covered.
- Private water: Health Department permits for a well, cistern or drinking water pond, with water testing on request.
- Driveways: the Engineer’s driveway permit and standard drawing (December 2023) for a new entrance onto a county road.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
The county’s building instructions cover only residential work. For commercial driveways the Engineer charges $150, and utility, pipeline and other work in county roads needs a use-of-right-of-way permit, with boring under the road ($250) strongly preferred: an open cut within 5 feet of the pavement costs $10,000 plus an engineering report showing why boring is not feasible. Heavy hauling and logging need a road use maintenance agreement with the Engineer. Restaurants, food stores, pools and campgrounds are licensed and plan-reviewed by the Health Department.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. In Cadiz and the four zoned townships, get the local zoning approval first.
- Deed and survey. New parcels go through the Map Office’s pre-approval and transfer review against the conveyance standards effective October 1, 2022.
- Septic and well. Where there is no public sewer or water, the Health Department permits must be in place before building; the county asks you to contact it if the lot has a well or septic system.
- Floodplain. A Flood Hazard Area Development Permit from the Engineer for any development in a special flood hazard area, including fill, grading, accessory buildings and manufactured homes; it expires if work has not started within one year and must be posted on the site. The building instructions list 740-942-8867 for the floodplain administrator; that is the Map Office line, and the Engineer’s office is 740-942-3086.
Harrison County permit costs and fees
The building fee comes from the county’s Building Permit Instructions, and the Engineer’s fees from Resolution 5-23 of the Board of Commissioners, effective January 25, 2023. The Board of Building Standards adds its 1% assessment to residential building fees. Septic and well fees are set by the Board of Health in its 2026 environmental program fee schedule; ask the Health Department for the current amounts.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Residential new construction or addition | $360 + $4 per 100 sq ft |
| Building re-inspection | $150 |
| Driveway permit, residential / commercial | No charge / $150 |
| Use of county right-of-way | $250 under 2,000 feet + $50 per additional 1,000 feet |
| Boring under a road / open cut within 5 feet of pavement | $250 / $10,000 + engineering report |
| Oversized or overweight load | $150 |
| Floodplain permit application | $150; first backcheck free; $75 for each later review |
| Hydrologic and hydraulic study review | $2,000; later reviews $1,000 |
| Engineer permit not obtained before use or construction | $300 per day |
Worked example from the instructions: a new house of 2,400 square feet is $360 + (24 × $4 = $96) = $456 for the county building permit, plus the 1% state assessment and any re-inspection fees. A new residential driveway onto a county road adds no Engineer fee, but a floodplain lot adds at least the $150 floodplain application.
Trade permits and who may pull them
The county’s building instructions do not list separate electrical, plumbing or mechanical permits or a local contractor registration, so ask the building department whether trade work is inspected under the residential permit. Septic installers must register each year with the Health Department, pass the state code exam, keep up continuing education and carry insurance and a bond, and the department lists registered installers, designers and soil scientists. Contractors doing commercial electrical, HVAC, hydronics, plumbing or refrigeration work need the matching OCILB license.
Rather not deal with the Harrison County building department?
Get a free quote →How to apply for a permit in Harrison County
Use the county GIS to see the township or village and any flood zone.
In Cadiz or Archer, Freeport, Moorefield or North township, call the zoning contact on the county’s list.
Hire a soil scientist and designer, then apply to the Health Department for the septic and well permits.
File the Engineer’s driveway permit and, in a flood hazard area, the Flood Hazard Area Development Permit.
Contact the Department of Building Inspection through the Commissioners’ office and pay $360 plus $4 per 100 square feet.
Post it at the building site and book each inspection 24 to 48 hours ahead.
Review, corrections and what causes delay
A floodplain application that needs changes gets one free backcheck, then $75 for each further review, and a hydrologic study adds $2,000. Deeds and surveys that miss the conveyance standards are returned by the Map Office, so use its pre-approval process before closing on a new lot. Starting road or floodplain work without the Engineer’s permit costs $300 a day.
Inspections and certificates
A county building permit carries three inspections: the footer, the rough-in before any interior wall covering goes on, and the final. The permit holder is responsible for arranging every inspection on the scheduling line, 740-391-5966, and should allow 24 to 48 hours. All three must be approved before the department issues the certificate of occupancy, and each re-inspection costs $150. The Health Department inspects a septic system during installation, before it is covered with soil, and a floodplain permit holder gives the Floodplain Administrator consent to enter and inspect the work.
Ohio building code in Harrison County
FEMA’s Community Status Book lists unincorporated Harrison County (community 390255) as participating in the National Flood Insurance Program, with its first and current flood rate map both dated May 4, 2009; the County Engineer administers the county’s flood damage reduction regulations.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Harrison County permit search and official resources
Ask the Commissioners’ office for building permit and certificate records, under the Commissioners’ public records policy linked from their page. Floodplain and road permit files sit with the Engineer, deed and survey records with the Map Office, and septic and well records with the Health Department.
- Harrison County Building Permit Instructions (PDF)
- Harrison County Commissioners
- County Engineer permits and forms
- Engineer permit fees, Resolution 5-23 (PDF)
- Flood hazard area development permit application (PDF)
- Harrison County Engineer
- Map Office: deed pre-approval and conveyance standards
- Village and township zoning contacts
- Health Department: sewage and septic systems
- Health Department environmental programs (private water, food, pools)
- County Water-Sewer
- Harrison Soil and Water Conservation District
- Harrison County GIS
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Harrison County building permit FAQs
How much is a building permit for a new house in Harrison County?
$360 plus $4 per 100 square feet; a 2,400 square foot house is $456, plus the 1% state assessment.
What inspections does the county do?
Three: footer, rough-in before interior wall coverings, and final, all approved before the certificate of occupancy.
Who handles floodplain permits?
The County Engineer, as floodplain manager; the application costs $150 and the permit expires if work has not started within a year.
Is a driveway permit free?
For a home, yes; a commercial driveway onto a county road costs $150 under Resolution 5-23.
Which places in Harrison County have zoning?
Cadiz village and Archer, Freeport, Moorefield and North townships, according to the county’s zoning page.
Who issues septic permits?
The Harrison County Health Department at 538 North Main Street in Cadiz, after a soil evaluation, a system design and a site review.
Is this the same as the City of Harrison?
No. The City of Harrison is in Hamilton County near Cincinnati and has its own offices; Harrison County, in eastern Ohio, is a separate government with Cadiz as its seat.
Simplify Harrison County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Harrison County sooner?
Let Alliance prepare, file, and track your Harrison County permits while your crew stays on the job.
More Ohio permitting guides
Jefferson County
Read guide →Belmont County
Read guide →Tuscarawas County
Read guide →Henry County Building Permit Guide
Read guide →Highland County Building Permit Guide
Read guide →Hilliard Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Harrison County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.