Skip to main content
Municipal GuideIndianaWarsaw · Kosciusko County

Warsaw, Indiana Building Permit Guide

To get a building permit in Warsaw, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Warsaw’s Building Department at City Hall, 102 South Buffalo Street, reviews plans and issues building permits for the city through its online permit portal, with planning, zoning and flood permits handled in the same building.

Authority: Warsaw Building DepartmentFiling: connect.warsaw.in.govPhone: 574-372-9548
Authority
Building Department102 South Buffalo Street, Warsaw
New house fee
$75 to $150By floor area, per unit
Remodel fee
$1 per $1,000$15 minimum on a home
Flood rule
2 ft above BFELowest floor in the floodplain

In the City of Warsaw in Kosciusko County, building permits come from the Building Department at City Hall, 102 South Buffalo Street (574-372-9548), where Ray Behling is the Building Commissioner. Applications go through the city’s online portal at connect.warsaw.in.gov. A new house costs $75 to $150 depending on its floor area, remodels cost $1 per $1,000 of construction, and homes built in the floodplain must have their lowest floor 2 feet above the base flood elevation.

What requires a building permit in Warsaw?

Warsaw requires a permit for any improvement that involves structural, electrical, some mechanical or plumbing changes. Owners who do the work themselves must count their own labor when they estimate the cost on the application, since remodel fees are based on that figure.

Permit required

  • New one- and two-family homes, apartments, condominiums and commercial buildings, and additions to them
  • Remodeling, alterations and repairs, including electrical upgrades, decks, porches and ramps
  • Accessory buildings over 120 square feet
  • Fences, which must have 36-inch-deep footings at every post
  • Swimming pools, which also need a fence permit
  • Demolition, moving a house, and converting a building to add dwelling units
  • Signs, including most temporary signs

No permit needed

  • Re-roofing
  • Siding or re-siding, unless windows are being replaced
  • Painting
  • Other minor repair work

The Building Department asks owners who are unsure to call it at 574-372-9548. For fences, the city’s quick guide says a fence may not stand in front of the house or exceed 6 feet, must use one uniform material with the good side facing out, needs no side or rear setback except 3 feet from an alley (plus the visibility triangle at an alley intersection), and on a corner lot must stay 10 feet from the road and 6 inches from the sidewalk. Submit a bird’s-eye plan with the setbacks marked, drawn on a survey or a printout from the city GIS. In a mapped floodplain, the list grows: a flood development permit is needed for sheds and other detached accessory buildings of any size, fences, fill, dredging, seawalls, culverts and utilities, and even for interior finishes and equipment replacement in an existing building.

What Warsaw decides and what the state holds

The Building Department enforces the state building rules together with the City of Warsaw Municipal Code, and the Building Commissioner reviews construction documents and inspects new residential, commercial and improvement projects. The city sets its own fees, zoning (Appendix B of the municipal code), sign rules and construction and stormwater standards, and it enforces the Kosciusko County Flood Control Ordinance inside the city. The permit form sorts work into Class 2 residential and Class 1 commercial; Class 1 work also needs the state Construction Design Release.

Short on time to read all of this?

Get a free quote →

Warsaw building department: who handles permitting

The Building Department issues building permits and inspects the work; Ray Behling is the Building Commissioner. Planning and Zoning handles zoning, variances, the Plan Commission and flood development permits, and the Stormwater Utility regulates erosion and sediment control.

Warsaw permit contacts
OfficeContact
Building DepartmentCity Hall, 102 South Buffalo Street, Warsaw, IN 46580; 574-372-9548; Monday to Friday, 8:00 a.m. to 4:00 p.m.
Planning and Zoning (zoning, variances, floodplain)102 South Buffalo Street; 574-372-9550
Online permitsconnect.warsaw.in.gov (account required)
Stormwater Utility574-372-9562
City Hall main line574-385-2222

Warsaw has 16,130 residents in the Census Bureau’s 2025 estimate. Outside the city, land-use permits in unincorporated Kosciusko County come from the county Area Plan Commission, covered in the Kosciusko County guide. The Town of Winona Lake issues its own building permits.

Warsaw permit types

Permits are applied for through the city’s public portal: log in or create an account, choose the permit type, pick the address on the map, complete the application and upload site plans, construction drawings or sign designs. The city has posted a notice that it is updating its permitting system and that the portal may be down at times; during an outage, the Planning Department helps with permits.

Residential permits

The building permit application asks for the address and the front, side and rear setbacks, the owner, the type of work (new structure, addition, remodel, relocation, shell or demolition), gross floor area, intended use, value of construction and estimated completion date, and the contractor, subcontractors and licensed plumbing contractor. Include a detailed scope of work and a set of plans. Fences and pools have their own permits. Warsaw’s pool page sets residential pool standards: water-tight, smooth, non-toxic materials (sand or earth is not an acceptable finish), a shallow-end floor slope of no more than 1 foot in 7 and a deep-end slope of no more than 1 in 3, walls within 11 degrees of vertical to set depths, decks sloped to drain, a means of egress in the shallow end and another where the water is deeper than 5 feet, and circulation piping pressure-tested at 25 psi for 30 minutes before the deck goes in.

Commercial permits

Commercial, industrial, multifamily and other Class 1 buildings are priced by building size and need the state design release. The application asks whether a crane will be used. Signs follow the city sign ordinance: temporary signs need a $15 permit each calendar year, may be used no more than 180 days a year per business, may not go in the right-of-way, and together may not exceed half the display area of the permitted permanent sign. Flashing signs, most inflatable and moving signs, and off-premise signs (apart from real estate and development signs) are prohibited.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. The Plan Commission meets at 7:00 p.m. on the second Monday of each month, and the Board of Zoning Appeals at 7:00 p.m. on the fourth Monday, both in the City Hall Council Chambers. The BZA grants variances, special exceptions and conditional uses and hears appeals of administrative decisions; four of its five members are appointed by the mayor and one by the Plan Commission. Both bodies’ meetings can be watched live or on demand from their city pages, which also post agendas and minutes.
  • Floodplain. Check the IDNR flood map or ask Planning and Zoning whether the site is in a special flood hazard area. If it is, get the flood development permit; new construction and substantial improvements (50% or more of the building’s value) must put the lowest floor, including a basement, 2 feet above the base flood elevation, with an elevation certificate. The city lists base flood elevations for its three lakes: Center Lake 807.4, Pike Lake 811.5 and Winona Lake 813.1, so the flood protection grade is 2 feet higher. Accessory buildings in the flood zone must be under 400 square feet, uninhabited and firmly anchored, and utilities may not sit under a floor built at the flood protection grade. For state floodway questions, the city refers residents to the IDNR Division of Water (1-800-451-6027).
  • Site work. The city publishes construction standards and stormwater technical requirements, and the Stormwater Utility regulates erosion and sediment control on construction sites.
  • City property. Digging on city property and new parking lots have their own forms.

Warsaw permit costs and fees

Building permit fees come from the Building Department’s posted fee sheet, which carries no ordinance number or adoption date, so confirm each amount with the office when you apply. The permit fee must be paid within two weeks after the office says the permit is ready for pickup.

Rather talk it over?

Call 1-855-478-4290 →
Warsaw building permit fees (Building Department fee sheet)
WorkFee
New one- or two-family dwelling or addition, per unit: up to 1,200 sq ft / 1,201–1,600 / 1,601–2,000 / over 2,000$75 / $100 / $125 / $150
Condominium, apartment, motel, hotel or rooming house, per dwelling unit$50
Office, retail, commercial or industrial building: up to 2,500 sq ft / 2,501–5,000 / 5,001–10,000$150 / $350 / $500
Commercial building over 10,000 sq ft$750 + $0.01 per sq ft over 10,000
Accessory building over 120 sq ft: residential / commercial$15 / $0.01 per sq ft, $50 minimum
Remodel, alteration or repair (incl. electrical upgrade, deck, porch, ramp)$1 per $1,000 of construction; $15 minimum residential, $50 commercial; $2,000 maximum
Demolition: residential / commercial$10 / $20
House moving (bond required)$10
Swimming pool (fence permit also required)$15
Converting a building to add units, per unit$50
Temporary sign, per calendar year$15

Worked examples from the fee sheet: a new 1,800-square-foot house falls in the 1,601 to 2,000 band and pays $125. A $40,000 kitchen and bath remodel is $40 (40 × $1), and a $10,000 deck pays the $15 residential minimum. A new 8,000-square-foot commercial building pays $500. Temporary signs used for three days or less, signs for not-for-profit groups and window signs need no fee.

Trade permits and who may pull them

Warsaw’s fee sheet has no separate trade-permit fees: electrical upgrades fall under the remodel fee of $1 per $1,000 of construction, and the building permit application lists the contractors doing each trade. The inspection schedule then checks each trade separately at rough-in.

  • Contractors: the application lists the contractor and up to three subcontractors, and names the licensed plumbing contractor.
  • Plumbers: plumbing contractors hold the state license from the Indiana Plumbing Commission.
  • Owners doing their own work: the city expects owners who do the labor themselves to include its value in the cost estimate.
  • Electric service: the electrical service entrance is inspected before the utility connects power.

Rather not deal with the building department?

Get a free quote →

How to apply for a Warsaw building permit

1. Check zoning and flood status

Look up the zoning map and the IDNR flood map, or ask Planning and Zoning about the lot.

2. Get zoning relief if needed

Apply for a variance or Plan Commission review through the same portal before the building permit.

3. Create a portal account

Sign in at connect.warsaw.in.gov and choose the permit type.

4. Enter the project

Pick the address on the map and fill in setbacks, floor area, value and contractors.

5. Upload plans

Attach a detailed scope of work, the site plan and construction drawings.

6. Pay within two weeks

When the office says the permit is ready, pay the fee within two weeks.

Review, corrections and what causes delay

The Building Commissioner reviews the construction documents before the permit issues. An application needs its setbacks, value and plans filled in before review, and a project in the floodplain also needs its flood development permit and elevation certificate. While the city updates its permitting system the portal may be down at times; contact the Planning Department for help with permits during an outage.

Inspections and certificates in Warsaw

The Building Department lists the inspections it requires at each stage; call 574-372-9548 to schedule. The Building Commissioner may also require an inspection at any stage before further work continues.

  • Footer: after excavation, before concrete is poured.
  • Foundation: for a crawl space, after the block is laid; for a basement, after forms are placed and before the walls are poured.
  • Underfloor plumbing: before the basement floor or slab is poured.
  • Framing, rough-in electrical, rough-in plumbing and rough-in heating and air conditioning: before the walls are covered.
  • Electrical service entrance: before the utility hook-up.
  • Final: before anyone occupies the building.

In the floodplain, the elevation certificate shows the lowest floor sits at the flood protection grade, 2 feet above the base flood elevation. Planning and Zoning (574-372-9550) answers questions on flood development permits and on whether a lot lies in a special flood hazard area.

Indiana building code in Warsaw

Warsaw enforces the state building rules through its Building Department along with the city’s municipal code. FEMA’s Community Status Book lists the City of Warsaw (community 180123) as participating in the National Flood Insurance Program, with a current flood map dated September 30, 2015.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Want this handled start to finish?

Get a free quote →

Warsaw permit search and official resources

Permits you apply for are tracked in your portal account. For older permits, inspection results or flood determinations, ask the Building Department (574-372-9548) or Planning and Zoning (574-372-9550); have the property key number or address ready.

Inspections are where schedules slip.

Get a free quote →

Warsaw building permit FAQs

How much is a building permit for a new house in Warsaw?

$75 to $150 per unit depending on floor area; a 1,800-square-foot house pays $125.

Do I need a permit to replace my roof?

No. Re-roofing, siding (unless windows are replaced), painting and minor repairs need no permit.

Do I need a permit for a fence?

Yes. Apply before installing it with a plan showing setbacks; fences may not exceed 6 feet or sit in front of the house, and posts need 36-inch-deep footings.

Does a shed need a permit?

Accessory buildings over 120 square feet need a $15 residential permit; in a floodplain, any detached shed needs a flood development permit.

How do I schedule an inspection?

Call the Building Department at 574-372-9548 at each required stage of the work, from footer to final.

How high must a new house sit in the floodplain?

The lowest floor, including a basement, must be 2 feet above the base flood elevation, shown on an elevation certificate.

Who handles permits just outside the city?

The Kosciusko County Area Plan Commission issues improvement location permits in unincorporated areas, and Winona Lake issues its own building permits.

Simplify Warsaw permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Warsaw sooner?

Let Alliance prepare, file, and track your Warsaw permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Warsaw permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.