In unincorporated Washington County, the Washington County Building Department at 601 Anson Street, Salem (812-883-0139), issues the site improvement application that serves as the county building permit, under Building Commissioner and Zoning Director Travis Elliott. The county wants a driveway permit from the Highway Department and a septic permit from the Health Department first. Fees run from $50 to $500 by gross square footage, garages and basements included, and projects inside Salem or its annex area go to the City of Salem Building Department instead.
What requires a building permit in Washington County?
The county code (§ 150.06) requires a local building permit for every new one- or two-family house, new commercial and industrial building, apartment or condominium complex, and manufactured or modular home being set up as a residence. The Building Department’s own list for its site improvement application adds residential additions and remodels, attached garages, and temporary structures, RVs and campers. Tiny homes or cabins built off site must carry a HUD identification plate or Indiana industrialized building or modular stickers.
Site improvement application needed
- New houses, single-family or multifamily
- Residential additions and remodels that add living space
- Attached garages
- Mobile, modular and manufactured home placement
- Temporary structures, RVs and campers
- New commercial, industrial and apartment buildings
No application needed
- Decks
- Roofing
- Pools
- Remodels that do not increase the home’s living square footage
- Replacing windows, walkways, roofs and similar parts of an existing building (§ 150.06(C))
The department says its list is not exhaustive, so call before starting anything unusual. Fences on a property line are a township matter: the county sends those questions to the township trustee. The department’s FAQ gives setbacks of 5 feet from the property line and 10 feet from the house, and the county code requires a new house to sit 60 feet from the center of the county highway or private road serving it.
What Washington County decides and what the state holds
The county adopted its own building code in Ordinance 2007-01 and enforces the residential code with Indiana amendments, the state’s 675 IAC rules and county ordinances, including lot sizes for homes without sewer and a floodplain chapter. Commercial work is different: the county tells owners to notify both the Building and Health Departments and to go to the Indiana Department of Homeland Security, Division of Fire and Building Safety, for permitting and plan review. A Class 1 building needs the state Construction Design Release before construction unless 675 IAC 12-6-4 exempts it.
Short on time to read all of this?
Get a free quote →Washington County building department: who handles permitting
The county code applies to the unincorporated area (§ 150.01). The Building Commissioner runs the permit procedure, issues certificates of occupancy, serves as Zoning Director and is the county’s floodplain administrator under Ordinance 2017-02. Appeals of his decisions go to the Board of Commissioners. Before calling, the department asks you to know the project location, so it can tell whether the site is inside Salem, in the city annex area or under county jurisdiction.
| Community | Permit office |
|---|---|
| Unincorporated county | Washington County Building Department, 601 Anson St., Salem; 812-883-0139 |
| Salem (city) and its annex area | City of Salem Building Department, 812-883-5060; the county page describes the annex area as roughly a 2-mile radius around the city, and some Washington Township subdivisions go to the Salem Plan Commission |
| Campbellsburg, Little York, Livonia, New Pekin, Saltillo (towns) | The county pages do not say which office permits inside these towns; ask the town office (New Pekin’s is at 75 Mill Street) |
| Office | Contact |
|---|---|
| Building Department / Zoning | 601 Anson St., Salem, IN 47167; 812-883-0139; BuildingDepartment@washingtoncounty.in.gov; Monday to Friday, 7:00 a.m. to 3:00 p.m. |
| Highway Department (driveways, culverts) | 600 Anson St., Salem; 812-883-3538 |
| Health Department (septic) | 806 Martinsburg Road, Suite 100, Salem; 812-883-5603, ext. 8 for septic |
| Soil and Water Conservation District | 801 Anson St., Salem; 812-883-3006, ext. 3 |
| Surveyor | 99 Public Square, Suite 1, Salem; 812-883-4604; Monday to Friday, 8:00 a.m. to 4:00 p.m. |
Washington County permit types
The Building Department issues one kind of residential permit, the site improvement application, in five versions: frame, modular, blocked manufactured, underpinned manufactured and temporary. Each issued permit comes with a required evaluation sheet listing the inspections for that type of home.
Residential permits
- Plans. The code asks for scaled plans and specifications and a scaled plot plan showing property lines, streets and the building; no plot plan is needed when all the work is inside an existing structure. The county accepts hand-drawn plans if they carry everything needed for review.
- Owner-run jobs. Without a general contractor, expect to supply more detail: contractor information, foundation type and framing materials.
- Manufactured homes. The application needs the manufacturer’s foundation plan, or an individual foundation with load points no more than 8 feet apart.
- Lots without sewer. A home on a septic system needs at least three-quarters of an acre with community water, or one acre with a private well (Ordinance 2023-02).
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
For any commercial project, notify the county Building and Health Departments and work with the state Division of Fire and Building Safety for permitting and plan review. Where state law requires it, a copy of the design release goes with the county application (§ 150.32).
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Driveway permit. Required from the Highway Department for a new driveway, a driveway extension or a culvert replacement; it checks sight distance and spacing and whether a culvert is needed. No building permit or 911 address is issued without it.
- Septic permit. The Health Department charges $100, needs the recorded deed, a soil test by a certified soil scientist and an installer’s plan review; you then take the septic permit and proof of ownership to the Building Department.
- Existing septic. For an addition, or a new home replacing an old one on a lot that already has a system, the Health Department’s existing septic verification application may avoid a new system: once the tank lids are exposed, an environmentalist inspects them and issues an approval or denial letter. Repairs need a free repair permit and a design meeting the state septic rule, 410 IAC 6-8.3.
- Storm water. Disturbing more than one acre requires coverage under the Construction Stormwater General Permit, handled through the Soil and Water Conservation District.
- Floodplain. Development in a flood hazard area needs a floodplain development permit from the Building Commissioner before work starts.
- Zoning and subdivisions. The Plan Commission and Board of Zoning Appeals meet on set Tuesdays when needed; the 2026 dates end with December 1. An amended subdivision ordinance drafted in May 2026 was posted for public review.
Washington County permit costs and fees
The Building Department’s posted fee table charges by project size, using gross square footage that includes basements and garages. The county building code says the fee is the one established by the Building Commissioner (§ 150.32); an older section of the code still says local permits are free, but the posted table is what the office charges. Pay by cash, check or money order made out to the Treasurer of Washington County.
Rather talk it over?
Call 1-855-478-4290 →| Gross square footage | Fee |
|---|---|
| 0–500 | $50 |
| 501–1,000 | $100 |
| 1,001–1,500 | $150 |
| 1,501–2,000 | $200 |
| 2,001–2,500 | $250 |
| 2,501–3,000 | $300 |
| 3,001–4,000 | $350 |
| 4,001–5,000 | $400 |
| 5,001–6,000 | $450 |
| 6,001 and above | $500 |
| Item | Amount |
|---|---|
| Septic permit (Health Department) | $100 |
| Septic repair permit | No charge |
| Failure to call a required inspection (houses and duplexes, § 150.14) | $250 fine per violation |
Worked example from the table: a house with 1,800 square feet of living space and a 500-square-foot attached garage has 2,300 gross square feet, which falls in the 2,001–2,500 band, so the site improvement permit is $250. If it needs a new septic system, add the $100 septic permit, for $350 in county permit fees before soil testing and installation. A full basement under the same house would count too and could push it into a higher band.
Trade permits and who may pull them
The county pages list no separate electrical, plumbing or HVAC permit for a house; the trades are checked during the site improvement inspections. The rough-in inspection covers the electrical service to the house, and plumbing and sewer hook-ups must meet Health Department rules, with the septic system itself inspected by the Health Department’s environmentalists.
Rather not deal with the Washington County building department?
Get a free quote →- Licensing: the county says it does not require contractor licenses, except that plumbers and mobile home installers must be bonded and licensed by the State of Indiana.
- Who may apply: the project manager, property owner, contractor, architect, engineer or a permitting company. The project manager or owner remains responsible for requesting every evaluation and meeting the permit conditions.
- Owner-built homes: the county code notes that a single-family house built by a person for his or her own occupancy may be exempt from certain specific standards under state law, but the building can still be declared unsafe.
- Power hook-up: the Building Commissioner authorizes the utility to connect electricity to a new home only after the Health and Building Departments have approved all permits and inspections.
How to apply for a Washington County building permit
Tell the Building Department the project location; inside Salem or its annex area, call the City of Salem Building Department instead.
Pick up an application and marking flags at the Highway Department, 600 Anson Street.
Apply to the Health Department with the recorded deed, soil test and installer plan review, and pay $100; stake out the septic area.
Use the version for a framed, modular, manufactured or temporary home, with plans and a plot plan.
Bring cash, a check or a money order for the square-footage fee to 601 Anson Street.
After the Highway, Health and Building approvals, request a permanent address from county Addressing.
Review, corrections and what causes delay
No permit or 911 address is issued without the driveway permit, a home on septic needs the septic permit first, the foundation evaluation checks the 60-foot road setback, and an owner-run job needs more detail on foundation and framing. The Building Commissioner may withhold new permits from anyone who owes earlier fees, and for a property that is out of line with zoning or land-use rules until it is corrected (§ 150.37). Temporary structures, RVs and campers never receive a 911 address. Since January 1, 2026, state law has given a unit that permits houses 3 business days to answer whether an application is complete.
Inspections and certificates in Washington County
The county calls its inspections evaluations, and they must be requested at least 24 hours ahead; skipping one can bring a fine or a stop-work order, and the code sets the fine at $250 per missed inspection on a house or duplex. The code lists four stages for a new home:
- Foundation: the 60-foot setback from the road center, then trench and foundation.
- Framing: framing secured to the foundation; manufactured and modular homes on approved tie-downs.
- Rough-in: electrical service, plumbing and sewer hook-ups.
- Final: culvert (through the Highway Department), backfill, decks or stairs, and gutters and swales that carry water away from the foundation.
Want this handled start to finish?
Get a free quote →After a passing final inspection, the Building Commissioner issues a certificate of occupancy, which you need before moving in; missed inspections block it.
Indiana building code in Washington County
The county floodplain chapter (Ordinance 2017-02) requires the lowest floor of a new or substantially improved home, basement included, to be at or above the flood protection grade, 2 feet above the base flood elevation. FEMA’s Community Status Book lists unincorporated Washington County (community 180446A) as participating in the National Flood Insurance Program, with its current flood map dated June 21, 2017; the Surveyor’s Office also keeps flood map information.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Washington County permit search and official resources
For a permit, evaluation or certificate of occupancy record, contact the Building Department at 812-883-0139 or BuildingDepartment@washingtoncounty.in.gov. The full code of ordinances, including the building, floodplain and zoning chapters, is posted as PDFs on the county’s published codes page, and the Surveyor’s Office holds legal surveys, corner records and aerial maps.
- Washington County Building Commissioner: permits, fees and FAQ
- County Code Title XV: building, floodplain, planning and zoning
- Washington County published codes
- Washington County Plan Commission and BZA
- Washington County Highway Department: driveway permits
- Washington County Health Department: septic permits
- Washington County Surveyor
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Washington County building permit FAQs
How much is a building permit for a new house?
It depends on gross square footage, garages and basements included: $250 for 2,001 to 2,500 square feet, $300 up to 3,000, and $500 at most.
Do I need a permit for a deck, roof or pool?
No site improvement application is needed for decks, roofing or pools, or for remodels that add no living space.
What do I need before the county will issue a permit?
A driveway permit from the Highway Department and, for a home on septic, the $100 septic permit from the Health Department.
I live near Salem. Who issues my permit?
Inside the city limits or the city annex area, the City of Salem Building Department (812-883-5060); elsewhere, the county Building Department.
Do contractors need a license?
Not from the county; the county notes that plumbers and mobile home installers must be bonded and licensed by the State of Indiana.
Can a homeowner pull the permit?
Yes. The owner, project manager, contractor, architect, engineer or a permitting company may apply, and hand-drawn plans are accepted.
How much notice do inspections need?
At least 24 hours; missing a required inspection on a house can cost a $250 fine.
Simplify Washington County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Washington County sooner?
Let Alliance prepare, file, and track your Washington County permits while your crew stays on the job.
More Indiana permitting guides
Jackson County
Read guide →Jeffersonville
Read guide →Harrison County
Read guide →Wayne County Building Permit Guide
Read guide →Wells County Building Permit Guide
Read guide →Westfield Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Washington County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.