Sullivan County government publishes no building permit program for unincorporated land: its list of departments, boards and permits has no building department, plan commission or zoning office. The permit every new rural home on a septic system does need comes from the Sullivan County Health Department, 27 South Main Street, Sullivan (812-268-0224), which requires its permit before any septic construction, installation or repair begins. County ordinances generally stop at city and town limits; inside the City of Sullivan, ask City Hall.
What requires a permit in Sullivan County?
The county’s applications, licenses and permits page covers gun permits, marriage licenses, business-location verification and property tax forms, and lists no building or zoning permit. The Commissioners adopt ordinances for the parts of the county under county authority, generally the unincorporated area, and their listed duties include setting minimum housing standards. County ordinances are posted through an outside document portal linked from the county website.
County permits that apply
- Septic: a Health Department permit before any new construction, installation or repair of an on-site sewage system, residential or commercial
- Mobile homes: a Treasurer’s permit before moving a mobile home to another property, and a title transfer permit on every sale
- Class 1 buildings: the state design release before construction
Other offices to check
- County roads, roadside ditches and culverts: the Highway Department
- Regulated drains: the County Surveyor and Drainage Board
- Inside the City of Sullivan: City Hall
- Inside the towns: each town’s own office
What Sullivan County decides and what the state holds
In Indiana, a county building ordinance for unincorporated areas takes effect only once the state Fire Prevention and Building Safety Commission approves it (IC 36-7-8-3), and Class 2 permits exist only where a local ordinance requires them. Sullivan County’s published sources show no such county program. What the county does set is its on-site sewage rules: On-site Sewage Systems Ordinance 2024-04 lets the Health Department issue residential and commercial septic permits, collect fees and penalties and inspect, and it adopts the state’s residential and commercial on-site sewage rules and its sanitary vault privy bulletin by reference.
Sullivan County building department: who handles permitting
For a rural project, the offices that matter are the Health Department for septic, the Highway Department for work along county roads, the Surveyor and Drainage Board for regulated drains, and the Treasurer for mobile homes. Questions about whether a county ordinance applies to a project go to the Board of Commissioners, whose recording secretary is the County Auditor.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Health Department (septic) | 27 South Main Street, Sullivan, IN 47882; 812-268-0224 (backup 812-554-0092); Monday to Friday 9:00 a.m. to 4:00 p.m.; call before visiting, as staff are often in the field |
| Highway Department | 1469 E. County Road 75 N, Sullivan; 812-268-5457; Monday to Friday 7:00 a.m. to 3:30 p.m. |
| Surveyor and Drainage Board | Survey records, county corners and regulated drains |
| Treasurer (mobile home permits) | 812-268-6410 |
| Board of Commissioners / Auditor | Sullivan County Courthouse, 100 Courthouse Square, Sullivan; Auditor 812-268-4491; Commissioners meet the first and third Monday at 7:00 p.m. |
Cities and towns
County ordinances generally stop at city and town limits, the Commissioners’ page explains, although some countywide rules may apply. For work inside the City of Sullivan, the place to ask is Sullivan City Hall, 110 North Main Street, Sullivan (812-268-6077). The city has its own zoning boards: its 2026 meeting schedule lists a Plan Commission at 7:00 p.m. and a Board of Zoning Appeals at 6:30 p.m., both on the fourth Thursday every other month, the board meeting only when a variance request is filed, with notices in the Sullivan Daily Times. The city’s sewer maintenance department, open 8 a.m. to 4 p.m. (after hours 812-564-1161), locates and marks sewer lines for construction and explains proper connections and cleanouts. For the towns of Carlisle, Dugger, Farmersburg, Hymera, Merom and Shelburn, no official page naming a permit office was found; the town hall is the place to ask.
Sullivan County permit types
With no county building permit published, the permits below are the county-level ones a builder in unincorporated Sullivan County can expect.
Residential permits
- Residential septic permit. Hire a registered (IRSS) soil scientist for a soils analysis, then file the county onsite system application with a full set of labeled floor plans, marking any jetted tub of 125 gallons or more. The department mails or emails the minimum system requirements, the designer or installer drafts detailed plans to its plan review checklist, and the permit is issued once plans are approved.
- Mobile home moving permit. From the Treasurer before a mobile home is moved; all property taxes on it, including any owed by earlier owners, must be paid first.
- Mobile home title transfer permit. From the Treasurer on every sale, before the Bureau of Motor Vehicles transfers the title.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Ordinance 2024-04 covers commercial on-site sewage systems as well as residential ones, under the state’s commercial on-site rule, so a rural business on septic needs the Health Department’s commercial permit. A new restaurant or other food business also goes through the Health Department’s retail food plan review before it opens. Inside the City of Sullivan, Sewer Use Ordinance 2024-9, adopted November 12, 2024, lets the city accept or deny any new or increased industrial discharge, require pretreatment and charge for wastewater discharge permits. A building used by the public, by three or more tenants or by employees is a Class 1 structure that needs the state design release before construction, whether or not a local permit exists.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before construction
- Soils and septic design, which set the size and location of the system and therefore where the house can go.
- County road access, for culverts and roadside ditches handled by the Highway Department.
- Regulated drains, where the Surveyor and Drainage Board oversee county drainage systems.
- Flood areas, mapped for unincorporated Sullivan County on a 1979 flood hazard boundary map.
Sullivan County permit costs and fees
No county building permit fee schedule is published. The fees that are published are the Health Department’s: its septic permitting process sheet, dated January 28, 2019, sets the septic permit fee at $100, due when the installation plans are approved. Ordinance 2024-04 now refers all septic fees to the Health Department’s separate fee ordinance, whose current version is not posted, so that sheet is the latest published figure in force.
A new Health Department fee ordinance is pending. The Board of Health approved an updated fee ordinance on June 18, 2026 with changes effective January 1, 2027, the draft was posted for public review on July 16, 2026, and by the board’s August 20, 2026 meeting it had gone to the Commissioners and was awaiting legal advertisement before their vote. Ask the Health Department whether it has been adopted. The draft’s construction-related lines are:
Rather talk it over?
Call 1-855-478-4290 →| Item | Proposed fee |
|---|---|
| Septic system permit | $100 (unchanged) |
| Septic installer certification | $25 a year |
| Holding tank operating permit | $100, “biannually” as the draft words it |
| Plan review, food establishment or bed and breakfast | $50 |
| Retail food permit; bed and breakfast of 14 rooms or fewer | $100 each |
Other costs are set by other offices: the soil scientist’s analysis is a private fee, mobile home permits need all mobile home taxes paid first, and recorded documents found through the county’s online search service can carry image fees starting at $1 a page. City permit fees, if any, are the city’s own; county pages do not list them.
Trade permits and who may pull them
The county publishes no electrical, plumbing or mechanical permits and no county contractor license or registration. Plumbing contractors hold the state license. Septic work is the exception: the Health Department keeps a list of septic contractors, and its process sheet says that while contractors often handle the steps, the property owner is responsible for making sure a permit is obtained before a system is installed, repaired, replaced or altered, and that it passes final approval before use.
How to get a septic permit in Sullivan County
Inside the City of Sullivan, call City Hall at 812-268-6077; inside a town, ask the town.
The Health Department keeps a list of registered soil scientists who work in the county.
Submit the onsite system application with labeled floor plans and the soils report.
The designer or installer submits detailed plans, materials and elevations; staff review them and may visit the site.
Pay the permit fee when plans are approved and keep the permit on site through installation.
Schedule the inspection 2 to 5 days in advance.
Rather not deal with the Sullivan County building department?
Get a free quote →Review, corrections and what causes delay
The designer must make any additions or corrections the department asks for before the permit is issued. Sullivan County has one septic inspector, so inspections must be booked 2 to 5 days ahead, and staff are often in the field, so call before visiting the office.
Inspections and certificates in Sullivan County
The county publishes no building inspection program for unincorporated land. Septic systems are inspected by the Health Department’s single inspector: call before breaking ground and schedule 2 to 5 days ahead, keep the permit at the site during every phase, and do not use the system until the department gives final approval. The owner is responsible for protecting the system site before, during and after construction.
The Board of Health, whose members the Commissioners appoint, meets on the third Thursday of each month at 7 p.m. at the Health Department; its remaining 2026 meetings are November 19 and December 17. Since 2025 the department has also run a well water testing program for private wells, worth using before tying a new house to an old well.
Indiana building code in Sullivan County
FEMA’s Community Status Book lists unincorporated Sullivan County (community 180410) as participating in the National Flood Insurance Program under the emergency program since June 10, 2005, with no flood insurance rate map issued; its map is the flood hazard boundary map of March 23, 1979.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Want this handled start to finish?
Get a free quote →Sullivan County permit search and official resources
Septic permit records are held by the Health Department. Recorded documents such as deeds and plats can be searched online through the county’s Doxpop link, and Commissioners’ minutes and county ordinances are posted through outside portals linked from the county website.
- Health Department environmental services (septic)
- Residential septic permitting process
- On-site Sewage Systems Ordinance 2024-04
- Health Department contacts
- Draft Health Department fee ordinance (effective 2027 if adopted)
- Board of Health minutes
- Retail food plan review
- Board of Commissioners
- County departments and elected officials
- Highway Department
- Surveyor’s Office
- Drainage Board
- Mobile home permits and transfers
- Recorded document search
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Sullivan County permit FAQs
Does Sullivan County issue building permits?
The county’s website lists no building, planning or zoning office or building permit; the Commissioners’ office can say whether any county ordinance applies to a project.
Do I need a septic permit?
Yes. The Health Department’s permit is required before any septic system is built, installed or repaired.
How much is a septic permit?
$100 on the department’s 2019 process sheet, due when the system plans are approved.
How do I schedule a septic inspection?
Call the Health Department at 812-268-0224 before breaking ground, 2 to 5 days ahead.
Who issues permits in the City of Sullivan?
Ask Sullivan City Hall, 110 North Main Street (812-268-6077); county ordinances generally stop at the city limits.
Are Health Department fees changing in 2027?
A fee ordinance approved by the Board of Health would take effect January 1, 2027 if the Commissioners adopt it; it keeps the septic permit at $100 and adds a $25 yearly installer certification.
Do I need a permit to move a mobile home?
Yes, from the Treasurer’s Office (812-268-6410), after all taxes on the home are paid.
Simplify Sullivan County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Sullivan County sooner?
Let Alliance prepare, file, and track your Sullivan County permits while your crew stays on the job.
More Indiana permitting guides
Vigo County
Read guide →Greene County
Read guide →Knox County
Read guide →Terre Haute Building Permit Guide
Read guide →Tippecanoe County Building Permit Guide
Read guide →Tipton County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Sullivan County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.