Tipton County, Indiana Building Permit Guide

To get a building permit in Tipton County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In unincorporated Tipton County, the Tipton County Plan Commission’s planning department issues Improvement Location Permits that cover both zoning and construction, and its building commissioner inspects the work under the county’s minimum construction and electrical codes.

Authority: Tipton County Plan CommissionPermit: Improvement Location PermitPhone: 765-675-6063
Authority
County Planning Department101 E. Jefferson Street, Tipton
New home ILP
$450 flat$500 only if 2026 draft adopted
Inspections
Included in the feeBook 24 hours ahead
Small sheds
Under 160 sq ftNo permit required

In unincorporated Tipton County, construction is permitted through an Improvement Location Permit (ILP) from the Tipton County Plan Commission’s planning department in the courthouse at 101 E. Jefferson Street, Tipton (765-675-6063), whose fee schedule is collected by the Building Commissioner/Planning Department. The permit price includes the usual inspections and the certificate of occupancy. A new home is $450 under the current schedule; a 2026 amendment the Plan Commission recommended on June 4, 2026 would make it $500, but its adoption by the Commissioners is not in the county’s posted records.

What requires a permit in Tipton County?

The Plan Commission describes its regulations as governing both land use and building construction in the unincorporated county, and its inspection guidelines trace the county’s minimum construction code and minimum electrical code ordinances back to January 1, 1977. The ILP serves as the construction permit: its fee covers the inspections the Building Commissioner decides a job needs, and a certificate of occupancy follows once they pass.

ILP needed

  • New homes, multi-family dwellings, moved houses, mobile and modular homes
  • Room additions and major remodels (load-bearing walls, major re-plumbing or rewiring)
  • Decks and unenclosed porches over 120 square feet, covered decks and enclosed porches
  • Garages, outbuildings, pole barns, lean-tos, grain bins and other farm buildings
  • Pools, ponds and lagoons of 100 square feet or more, signs and towers
  • Solar and wind systems, battery storage, electrical upgrades and commercial or industrial buildings

No permit

  • Portable sheds under 160 square feet, as the fee schedule states

Building before the ILP is issued costs an extra $200 or twice the ILP amount, and occupying a building before its final inspection and occupancy permit can bring fines under Section 904 of the zoning ordinance for each day the violation continues.

What Tipton County decides and what the state holds

The Board of Commissioners adopts the zoning ordinance (Ordinance 2008-12, adopted November 10, 2008) and the fee schedule on the Plan Commission’s recommendation. Two 2026 changes are in motion. The fee amendment (CO-ZO-10-26) received a 9-0 favorable recommendation on June 4, 2026; the county’s posted records do not include the Commissioners’ vote. A data center amendment adding Section 525 to the zoning ordinance was recommended 6-1 after a November 5, 2026 hearing and certified on November 6, and the Commissioners scheduled action on it for their November 16, 2026 meeting. Earlier, on July 2, 2026, the Plan Commission sent the Commissioners a 9-0 favorable recommendation for a temporary data center moratorium; the posted records do not show the Commissioners’ action on it. A larger rewrite is also coming: with the 2026 Tipton County Comprehensive Plan approved, the Plan Commission is choosing a consultant to draft a Unified Development Ordinance to replace the 2008 zoning ordinance, and in September 2026 it decided on a second round of consultant interviews. Class 1 projects also need the state design release.

Short on time to read all of this?

Get a free quote →

Tipton County building department: who handles permitting

The Tipton County Plan Commission is an advisory plan commission of nine members: five citizens appointed by the Commissioners plus a county councilor, a commissioner, the County Surveyor and the county Extension agent. Its staff, the Planning Department, take ILP applications, collect fees and schedule inspections. The Plan Commission meets at 6:00 p.m. on the first Thursday after the first Wednesday of each month at the courthouse, and the five-member County Board of Zoning Appeals meets on the fourth Tuesday of the month when needed to hear variances, special uses and appeals of the Director’s decisions, including a denied building permit.

Tipton County permit offices
OfficeDetails
Plan Commission / Planning DepartmentTipton County Courthouse, 101 E. Jefferson Street, Tipton, IN 46072 (third floor on the department page; second floor in a November 2026 notice); 765-675-6063; fax 765-675-6592; Monday to Friday 8:00 a.m. to 4:00 p.m.
Health Department, Environmental Health (septic)765-675-8741, option 4; envhealth@tiptoncounty.in.gov
Highway Department (county road right-of-way)Market Road, Tipton; 765-675-4508
Surveyor and Drainage BoardsCounty Surveyor’s Office, the administrative center for the Tipton County Drainage Board and the Big Cicero Creek Joint Drainage Board

Which office serves your address

County rules apply in the unincorporated area. The City of Tipton has its own City Plan Commission and City Board of Zoning Appeals, listed separately on the shared city-county website. The county’s pages do not say whether the Planning Department also permits construction in the towns of Kempton, Sharpsville and Windfall City, so owners there should start with their town hall or the Planning Department.

Tipton County permit types

Most ILPs are flat fees by project type, while commercial and industrial buildings are priced on floor area; every fee pays for the customary inspections. The Building Commissioner sets how many inspections a project needs and may add more, which are charged separately.

Residential permits

  • New homes, moved homes and multi-family buildings: one flat fee per home, with a per-unit add-on for each extra dwelling unit.
  • Mobile and modular homes: separate rates for mobile homes on non-permanent and permanent foundations and for modular homes.
  • Remodels: major interior remodeling, any change to a load-bearing wall, or major re-plumbing or rewiring.
  • Decks and porches: wooden decks and unenclosed porches over 120 square feet, with a higher fee once they are covered or enclosed.
  • Garages and outbuildings: attached and detached garages, pole barns and other farm structures; small lean-to additions have their own lower fee.
  • Solar and storage: off-grid or grid-tied solar; the 2026 draft would add accessory battery storage.
  • Ponds and signs: ponds and lagoons of 100 square feet or more are $200; signs are $150, lighted signs $250 and off-premises signs over 36 square feet $450.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and industrial buildings are priced on floor area. The current schedule charges a base fee covering the first 5,000 square feet plus $0.10 per square foot beyond that; the 2026 draft would drop the 5,000-square-foot allowance, add a commercial and industrial remodel category, and raise churches, schools and government buildings from $200 to $750. The posted 2026 draft lists community-scale solar, commercial wind and large battery storage at $2,250 per megawatt of nameplate capacity. Development plans go to the Plan Commission, and the department posts a development plan checklist and findings-of-fact forms.

What comes before the ILP

  • Septic. A permit from the Tipton County Health Department is needed before any septic system is built or repaired; a soil test sets the absorption field, and system size depends on soils and bedrooms (Septic Ordinance 2012-10).
  • County roads. Work in county road right-of-way needs the Highway Department’s right-of-way permit, issued subject to its posted conditions; the department also has a drainage agreement form.
  • Drainage. The Surveyor’s office keeps the records of county-regulated drains and tiles; it does not determine flood zones or wetlands.
  • Zoning relief. Variances, special exceptions and conditional uses go to the BZA, and rezonings and development plans to the Plan Commission.

Tipton County permit costs and fees

The last adopted fee schedule in the county’s records is Ordinance 2023-13, adopted September 25, 2023, which the 2026 draft would repeal. The Plan Commission recommended a replacement (CO-ZO-10-26) on June 4, 2026; it is posted as the “2026 Fee Schedule”, but the copy is unsigned and the Commissioners’ adoption is not in the county’s posted records. The draft shows both figures, so the table gives both.

Rather talk it over?

Call 1-855-478-4290 →
Tipton County ILP fees: current schedule and the 2026 draft (adoption not posted)
PermitCurrent schedule2026 draft, not yet adopted
New home; moving a residential structure$450$500
Multiple-family dwelling$450 first unit + $100 each added unit$500 first unit + $100 each added unit
Mobile home: non-permanent / permanent foundation$250 / $300$300 / $350
Modular home$400$450
Major remodel$300$350
Room addition; attached garage; outbuilding or detached garage; pole barn$400$450
Wooden deck or unenclosed porch over 120 sq ft / covered deck or enclosed porch$200 / $250$200 / $250
Grain bin$400$100
In-ground pool / year-round above-ground pool$200 / $200$300 / $200
Electrical upgrade; solar (off-grid or grid-tied)$75; $200$75; $200
Commercial or industrial$550 for the first 5,000 sq ft + $0.10 per sq ft beyond$750 + $0.10 per sq ft
Churches, schools and government buildings$200$750
Re-inspection after a failed inspection$50$100
Missed inspection (per project)$50$100 first, $200 second, $300 third or more
Variance, special exception or development plan$350$400

Worked example: an 8,000-square-foot commercial building is $550 + (3,000 × $0.10) = $850 under the current schedule, and $750 + (8,000 × $0.10) = $1,550 if the 2026 draft is adopted. A rezoning is $500 under both. Starting work before the ILP adds $200 or doubles the ILP amount, and $50 of every ILP goes into the county’s Unsafe/Nuisance Building Fund. Septic fees are set separately by the Health Department.

Rather not deal with the Tipton County building department?

Get a free quote →

Trade permits and who may pull them

Tipton County does not issue separate trade permits on its posted schedule: electrical, framing and plumbing are inspected under the same ILP before walls are covered, and an electrical upgrade on its own has a $75 permit. The county’s pages describe no county contractor license or registration, and the ILP fees are the same whether an owner or a contractor applies. Plumbing contractors hold the state license. The inspection guidelines place the duty to call for each inspection on “the contractor/owner” and ask both to sign the guidelines sheet. Septic systems are installed under the Health Department’s permit, which keeps a list of licensed septic installers and a septic installer registration form.

How to apply for a Tipton County ILP

1. Confirm the parcel is unincorporated

Inside the City of Tipton, the city plan commission applies; in the towns, ask the town or the Planning Department first.

2. Get the septic permit

Book a soil test and apply to the Health Department before any septic work.

3. Get road and drainage approvals

Right-of-way permits from the Highway Department, and drain information from the Surveyor where a regulated drain is near.

4. Apply to the Planning Department

File the ILP application at 101 E. Jefferson Street; commercial projects add the state design release.

5. Pay the flat fee

Pay the fee for the project type; it includes the usual inspections.

6. Call for inspections

Phone 765-675-6063 at least 24 hours before each stage.

Review, corrections and what causes delay

Petitions that need a hearing follow the Plan Commission’s monthly schedule or the BZA’s fourth-Tuesday meetings. Building or occupying ahead of the permit and final inspection adds the late-ILP charge or occupancy fines, and missed inspections carry their own fees. The Section 525 data center rules apply only once the Commissioners adopt them; their action was set for November 16, 2026, and no adoption is in the posted records.

Inspections and certificates in Tipton County

The Tipton County Inspection Guidelines, revised January 23, 2026, set the stages. Call the Plan Commission at 765-675-6063 with at least 24 hours’ notice:

  • Footing, when the footings are ready to pour.
  • Post holes for fences, decks and post-frame buildings, once at least 25% of the holes are dug.
  • Electrical, rough framing and plumbing, before insulation and drywall or other covering.
  • Final, when the structure is ready to occupy.

Contractors and owners may attend; if they are not there, the inspector calls only when the inspection fails. A certificate of occupancy is issued only after every required inspection has been made and passed, and the Plan Commission’s June 2026 review confirmed that the permit fees include inspections and the certificate. The guidelines add $50 for a missed inspection, a figure the 2026 amendment would raise.

Want this handled start to finish?

Get a free quote →

Indiana building code in Tipton County

The county enforces its minimum construction and electrical code ordinances through the Plan Commission’s inspections in the unincorporated area. FEMA’s Community Status Book lists unincorporated Tipton County (community 180475) as participating in the National Flood Insurance Program, with a current map dated June 9, 2014.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Tipton County permit search and official resources

Permit and inspection files are kept by the Planning Department; ask there for a parcel’s permit history. Plan Commission and BZA agendas and minutes, the fee schedule and pending ordinances are posted in the county’s online document center.

Inspections are where schedules slip.

Get a free quote →

Tipton County permit FAQs

Who issues building permits in Tipton County?

The Tipton County Plan Commission’s planning department, through the Improvement Location Permit, for the unincorporated county.

How much does a permit for a new house cost?

$450 under the current schedule; the 2026 amendment recommended in June would make it $500. Inspections and the certificate of occupancy are included.

Do I need a permit for a shed?

Not for a portable shed under 160 square feet. Larger outbuildings need an ILP.

Do I need a permit for a deck?

Yes for a wooden deck or unenclosed porch over 120 square feet ($200), and for any covered deck or enclosed porch ($250).

How do I schedule an inspection?

Call the Plan Commission at 765-675-6063 at least 24 hours ahead.

What if I start building before I have a permit?

The ILP costs an extra $200 or twice the original amount, and occupying before the final inspection can bring daily fines.

Is Tipton County regulating data centers?

Not yet in adopted rules on the county’s posted records. A new Section 525 for data centers was recommended 6-1 by the Plan Commission and set for the Commissioners’ action on November 16, 2026; it applies only once adopted.

Simplify Tipton County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Tipton County sooner?

Let Alliance prepare, file, and track your Tipton County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Tipton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.