In unincorporated Starke County, permits come from the Department of Planning and Building, which staffs the Plan Commission and the Building Department at 53 East Mound Street, Knox (574-772-9133). The county’s permit rules require a permit before any construction, alteration or repair in the unincorporated county, a new house is charged $0.20 per square foot under the schedule in force since September 22, 2016, and a replacement schedule adopted in July 2026, with a 10% increase across the board, takes effect on January 21, 2027. Knox issues its own permits.
What requires a building permit in Starke County?
The county’s fee schedule says permit fees apply to all new construction and to all alterations, repairs and remodeling, and that no person or company may do any such work in the unincorporated areas without first getting a permit from the Planning Commission. It then lists the work that needs no permit.
Permit required
- New houses, multi-family buildings and additions to living space
- Alterations and repairs that change structure, wiring or plumbing, such as fire or storm damage, kitchen and bath remodels and converting a garage or pole barn into living quarters
- Garages, carports and accessory buildings, decks, porches and pools
- Roof work with structural changes
- Manufactured home placement, demolition, signs, towers and wind systems
- Electrical and gas upgrades or new installations, generators and electrical reconnects
No permit needed
- Roof sheeting and roof replacement with no structural change
- New driveways and concrete or asphalt flatwork such as sidewalks and patios
- Door, storm door, window and garage door replacement with no change in opening size
- Painting, decorating, gutters and siding
- All types of fences
Commercial and industrial work is charged on the same square-foot basis, capped at $5,000. Before a local building permit is issued for a site in a floodplain or wetland, the county requires either the Indiana DNR or IDEM permit or a letter saying that permit is not needed.
What Starke County decides and what the state holds
Ordinance 2010-15, the Building Code of Starke County, covers the unincorporated areas and was approved by the state Fire Prevention and Building Safety Commission on September 8, 2010; it adopts the state’s building rules by reference. The county sets its own fees, contractor registration, zoning, kennel, solar, wind and data center rules. Class 1 buildings also need the state Construction Design Release.
Starke County building department: who handles permitting
The Department of Planning and Building, led by Director of Planning and Building John McCurrie, runs the Plan Commission, the Building Department and the Board of Zoning Appeals from the county government building. Under Ordinance 2010-15 the Building Commissioner is the Planning and Zoning Administrator appointed by the Plan Commission. The office is open Monday to Friday, 8 a.m. to 4 p.m. Central time, and the Plan Commission meets on the second Wednesday of each month at 5:30 p.m.
Short on time to read all of this?
Get a free quote →| Place | Permit office |
|---|---|
| Unincorporated Starke County | Starke County Department of Planning and Building, 53 East Mound Street, Knox; 574-772-9133 |
| City of Knox | City Building, Planning & Code Compliance, 101 West Washington Street; 574-772-5445 |
| Towns of North Judson and Hamlet | The published sources do not say; ask the town hall |
The county’s contractor registration reaches further than its building code: the bond it requires is written payable to Starke County and all towns and cities in it. The county also notes that the Auditor’s office has suspended processing of parcel splits and combinations until further notice, which affects anyone creating a new lot.
Starke County permit types
Applications go through the Building Divisions of the Planning Commission, which check the package, set the fee and tell the applicant when the permit is approved. The county also lists an online permit portal (iWorQ) on its home page for applying and tracking.
Residential permits
- New houses and additions: one site plan drawn to scale showing every existing structure (fences included), the new building with top-of-foundation elevations, the driveway, and distances to property lines; one set of detailed drawings covering foundation, floor plan, electrical, mechanical and plumbing. Reversed plans are not accepted.
- Garages, sheds and pole barns: limited plans, meaning a floor plan and a cross-section; an oversized storage building needs a BZA approval letter.
- Electrical amperage changes and reconnects: no site plan, and a tax statement may serve as the property description.
- Demolition: two inspections, disposal receipts, capped utilities, removal of concrete, grading and seeding, and asbestos and lead certification.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects need the same plans plus approval letters from the Health Department, the sewer utility, the county highway department and, for parking lots of more than four spaces, the Surveyor. Projects with four or more parking spaces must submit detailed parking plans, and in some cases the county asks for a certified check or performance bond.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Septic or sewer. The Starke County Health Department (108 N. Pearl Street, Knox; environmental line 574-772-9139) runs the residential and commercial septic program; on sewer, the utility’s letter is needed.
- Entrance and culvert. The county highway department (3835 East 250 North, Knox; 574-772-3011) approves new or changed entrances on county roads; INDOT approves entrances on state highways.
- Floodplain and wetlands. IDNR or IDEM approval, or a letter that none is needed.
- Zoning relief. Variances go to the BZA on the county’s variance application.
- Agent authorization. Anyone filing for an owner, bank or real estate office files the Property Owner Authorization form.
Starke County permit costs and fees
The fee schedule in force is the Location Improvement Permit Fees schedule effective September 22, 2016. The minutes of a July 8, 2026 public hearing record the adoption of Resolution 2026 PC 06, which repeals that schedule with a 10% increase across the board for all permit fees, effective January 21, 2027; until then the 2016 amounts below apply.
| Work | Fee |
|---|---|
| New single-family dwelling (one open deck included) | $0.20 per sq ft; attached garage built with the house $50 |
| Multi-family | $0.20 per sq ft + $50 per unit over one |
| Addition to living quarters | $0.20 per sq ft (minimum $100) |
| Alteration, repair or remodel with structural, electrical or plumbing work | $0.15 per sq ft (minimum $100) |
| Commercial or industrial | $0.20 per sq ft (maximum $5,000) |
| Detached or later garage, carport, accessory building | $25 up to 200 sq ft; above that $0.15 per sq ft ($50 minimum, $250 maximum) |
| Deck, porch or structural roof work | $50 |
| Pool (above ground over 100 sq ft, or in ground) | $50 |
| Manufactured home / temporary placement | $0.20 per sq ft / $75 |
| Demolition | $100, or $50 if utilities have been off more than two years |
| Electrical or gas upgrade, generator, reconnect | $50 each |
| Second and later re-inspections | $100 |
| Permit renewal within the 30-day grace period | $25 |
Worked example under the 2016 schedule: a 1,600-square-foot house with an attached garage built at the same time is 1,600 × $0.20 = $320 plus $50, or $370. Starting work without a permit costs the permit fee plus three times that amount, missing a required inspection is $250, and ignoring a stop-work order is $1,000 a day. The Plan Commission also sent Resolution 2026-PC-13, which would charge pole barns the standard 20 cents per square foot while keeping silos and grain storage exempt, to the Commissioners in August 2026.
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Starke County’s Contractor Registration Ordinance (2006-22) requires everyone in the business of general contracting, roofing, insulation, electrical, plumbing, sewage, masonry, well drilling, heating and air conditioning, excavating or septic installation to register before working in the county. Applicants show $1,000,000 of liability insurance, workers’ compensation and a $5,000 bond. Registration costs $50, runs 365 days and renews for $25 ($75 if late); working unregistered is a $500 fine, and the Building Commissioner will not issue a permit while any contractor or subcontractor on the job is unregistered.
- Owner-builders: an owner building or remodeling on their own property need not register, but files a Permit Compliance & Builder Declaration listing the trades they will do themselves, with relatives or unpaid volunteers; every other trade must be a registered contractor.
- Registered contractors: a primary contractor pulling the permit files a declaration binding it to the Indiana Residential Code, the National Electrical Code and the Indiana Plumbing Code and to using only registered subcontractors.
- Plumbing: Indiana licenses plumbing contractors at state level, and the county registration applies on top.
On August 12, 2026 the Plan Commission approved Resolution 2026-PC-14, which moves renewals to each registration’s anniversary date and fixes a typing error in the bonding requirement.
How to apply for a Starke County building permit
Every hired trade registers first; an owner-builder prepares the builder declaration.
Health Department or sewer utility, county or state highway entrance and culvert, and IDNR/IDEM where flooding or wetlands apply.
To scale, with existing structures, the new building, foundation elevations and the driveway.
Full drawings for a house or commercial building; a floor plan and cross-section for garages and pole barns.
At 53 East Mound Street, Knox, signed by the owner or a registered primary contractor.
Once notified of approval, collect the permit and pay within 30 days.
Rather not deal with the Starke County building department?
Get a free quote →Review, corrections and what causes delay
Missing agency letters, an unregistered subcontractor or reversed plans stop an application. The office notifies the applicant if a permit is denied or held for any reason. Work must be finished within one year, or the permit renewed at the discretion of the Director of Planning and Building; a renewal inside the 30-day grace period is $25, after that it is a new permit.
Inspections and certificates in Starke County
Inspections are booked only through the inspection ordering line, 574-772-9133, at least 24 hours ahead, between 8 a.m. and 4 p.m. on weekdays, by permit number. Voicemails left outside those hours do not count, and a request is not scheduled until the office confirms it by phone or email. The permit must be posted and survey stakes visible.
- Footing pre-pour (post holes for pole barns and decks), foundation pre-pour, and foundation before backfill
- Slab pre-pour over any buried plumbing, wiring or ducts
- Electrical service, with no utility release until it passes
- Framing and rough-in, then insulation before drywall
- Final for building, plumbing, electrical and HVAC
Before a residential final is scheduled, the office needs the septic approval from the Health Department or the sewer tap-in approval, the culvert permit sign-off and a working well. A commercial final also needs the Surveyor’s approval, an as-built survey with the architect’s certification and the engineer’s or architect’s letter of compliance. No building may be occupied until the department issues a certificate of occupancy; a red tag stays posted until the inspector removes it.
Indiana building code in Starke County
FEMA’s Community Status Book lists unincorporated Starke County (community 180240) as participating in the National Flood Insurance Program, with a current map dated June 16, 2014. The county has also adopted temporary limits on large energy and data projects: Ordinance 2025-37, adopted December 15, 2025, stops improvement location permits for hyperscale data centers for no more than one year, and the moratoriums on commercial solar energy systems and battery storage were extended through July 25, 2026 (the solar extension, Ordinance 2026-02, was adopted on February 17, 2026). On August 12, 2026 the Plan Commission sent a proposed resolution to regulate and prohibit commercial-scale data centers (2026-PC-15) to a public hearing in October 2026; ask the department which limits apply to a project today.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Want this handled start to finish?
Get a free quote →Starke County building permit FAQs
Do I need a permit for a fence or new shingles?
No. Fences of all types and roof replacement without structural changes need no permit in unincorporated Starke County.
How much is a permit for a new house?
$0.20 per square foot under the 2016 schedule, plus $50 for an attached garage built with it; fees rise 10% on January 21, 2027.
Do I need to register as a contractor to build my own house?
No, but any contractor you hire must be registered, and you file a builder declaration listing the work you will do yourself.
How do I schedule an inspection?
Call 574-772-9133 at least 24 hours ahead, on a weekday between 8 a.m. and 4 p.m., with your permit number.
Does the county issue permits in Knox?
No. The City of Knox issues its own building permits through its Building, Planning & Code Compliance office (574-772-5445).
How long is a permit good for?
One year; it can be renewed for $25 within a 30-day grace period.
Can I build a data center in Starke County?
Hyperscale data center permits are on hold under Ordinance 2025-37 for up to one year from December 15, 2025, and on August 12, 2026 the Plan Commission sent a commercial data center regulation (2026-PC-15) to an October 2026 public hearing.
Starke County permit search and official resources
To see past permits or inspection records, file the county’s Access to Public Records request form with the Department of Planning and Building, or ask the office at 574-772-9133. Plan Commission minutes and ordinances, including moratoriums and fee resolutions, are posted on the county website.
Inspections are where schedules slip.
Get a free quote →- Starke County Planning Commission and Building Department
- Location improvement permit fees (effective September 22, 2016)
- Procedures for requesting a building permit
- Inspections required by the Building Department
- Contractor Registration Ordinance and Resolution 2026-PC-14
- Contractor registration business rules and fees
- Owner-builder permit compliance declaration
- Floodplain and wetland permit note
- Ordinance 2010-15, Starke County Building Code
- Planning Commission ordinances
- Minutes, July 8, 2026 (Resolution 2026 PC 06 fee schedule)
- Access to public records request form
- Starke County Health Department
- City of Knox Building, Planning & Code Compliance
- Indiana DNR waterways permits
- FEMA Community Status Book, Indiana
Simplify Starke County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Starke County sooner?
Let Alliance prepare, file, and track your Starke County permits while your crew stays on the job.
More Indiana permitting guides
LaPorte County
Read guide →Marshall County
Read guide →Jasper County
Read guide →Steuben County Building Permit Guide
Read guide →Terre Haute Building Permit Guide
Read guide →Tippecanoe County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Starke County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.