In the Town of Schererville, the Planning and Building Department at Town Hall, 10 E. Joliet Street (219-322-2211), issues building permits for construction and remodeling inside town limits and performs the inspections. Every contractor, subcontractor and specialty contractor working in town must first register with the department, with insurance and a $5,000 bond recorded with the Lake County Recorder, and electricians must also pass a free town exam. Inspections are called in 24 hours ahead to a person, never to voicemail, and a failed one costs $50 before the re-inspection.
What requires a building permit in Schererville?
The town’s FAQ is broad: every property inside Schererville’s water and sewer boundaries needs a building permit before any construction activity begins, and home improvements involving electrical, mechanical, structural or plumbing work need one too. No work may start without a permit displayed at the job site.
Projects that usually need a permit
- Finishing a basement; kitchen and bathroom remodels
- Re-roofing, re-siding and window replacement
- Installing electrical outlets
- Pools, spas and hot tubs
- Additions, including seasonal rooms
- Furnaces, boilers, water heaters and fireplaces
- Fences, sheds and decks
Also on the town’s application
- Lawn and fire sprinkling systems
- Patios, porches and gazebos
- Storage pods
- Demolition
- Signs and solar panels
- Work in a flood area, on the Floodplain Development Permit
- Street cuts, boring, excavation or fill in the right-of-way
When a project is borderline, the department asks owners to call before starting rather than guess.
What Schererville decides and what the state holds
The town decides its permit process, zoning, contractor registration, electrician testing, erosion control and jobsite rules, and occupancy conditions such as finished landscaping. Its permits enforce the Indiana building code plus local ordinances. Indiana holds the code itself, licenses plumbers, and issues the Construction Design Release that the town’s application says commercial projects need. The town’s packet also notes that under Senate Enrolled Act 393, effective July 1, 2018, all Class 2 structures must disclose the types of advanced structural components they use.
Schererville building department: who handles permitting
The Planning and Building Department handles building permits, inspections, contractor registration and zoning requests, and its forms list also carries short-term rental, business license, sign, alarm and special event applications. Public Works handles water and sewer taps, erosion control and the storm sewer (MS4) inspection that comes before any excavation. Schererville is an incorporated town, so the Lake County Plan Commission does not issue permits here.
Short on time to read all of this?
Get a free quote →The department also handles smaller town permits. Garage sales, block parties, special events and banners usually need a permit submitted to and registered with the town; short-term rentals, home businesses, non-profit temporary signs and alarm systems each have their own application or registration on the forms list.
| Office | Details |
|---|---|
| Planning and Building Department | Town Hall, 10 E. Joliet Street, Schererville, IN 46375; 219-322-2211; fax 219-865-5504 |
| Inspection requests | 219-322-2211, extension 6; speak to office staff 24 hours ahead |
| Public Works (water, sewer, MS4, erosion) | 219-322-6688 |
| Streets | 219-322-5486 |
| Bonds | Recorded at the Lake County Recorder, Building A, 2nd floor, 2293 N. Main Street, Crown Point; 219-755-3730; weekdays 8:30 a.m. to 4:30 p.m. |
Schererville permit types
Schererville files everything on one Building and Zoning Application in two versions. The short form covers general projects such as a new roof, siding, windows or an occupancy permit; the long form is for new construction and any permit that needs a plat of survey.
Residential permits
- New homes. The long form, two plats of survey (at least one original), two sets of building plans (one comes back stamped with the permit), the full contractor and subcontractor list, and an energy conservation code report.
- Sheds and fences. The application and a plat of survey showing where the structure goes.
- Decks. The same, plus building plans.
- Pools. The application and two plats of survey showing the pool’s placement and measurements, pumps, filters, equipment, fencing and walk areas, under the town’s swimming pool regulations.
- Roofs, siding and windows. The short form.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
The application flags that a commercial project needs the state Construction Design Release, which the Indiana Department of Homeland Security (IDHS) issues before construction on a Class 1 building. The forms list includes a Fire Department occupancy and final inspection check sheet, and the town’s business license application sits on the same list.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Plat of survey. Under the Subdivision Control Ordinance (Ordinance 1095), surveys use U.S.G.S. datum and show the legal description, flood zone, lot bearings and total area, the lot number, street names and address, front, side and rear setbacks, the lot width at the building setback line, and elevations at the entry, main floor, top of foundation, each building and lot corner and the side yard, plus the direction of overland drainage, the driveway slope as a percentage, neighboring grades, corner-lot ADA sidewalk cuts, accessory structures and easements.
- Stormwater. Where the job needs a Storm Water Pollution Prevention Plan, it goes to the town and to IDEM. IDEM replaced the old Rule 5 program with its Construction Stormwater General Permit on December 18, 2021; it covers land disturbance of one acre or more, or less when part of a larger common plan of development, and its Notice of Intent carries a $175 fee.
- MS4 site inspection. Approval from the town’s MS4 inspector before excavation, grading or fill; call Public Works.
- Flood zone. FEMA lists Schererville as participating in the National Flood Insurance Program, with maps effective March 16, 2016; use the Floodplain Development Permit where it applies.
- Zoning. Zoning questions go on the town’s Zoning Request Form; the department’s pages also cover the Plan Commission and the Board of Zoning Appeals.
Schererville permit fees
An application fee is due when you submit, but the forms and requirements packet do not print the town’s permit fee amounts, so ask the Planning and Building Department at 219-322-2211 for the fee on your project. The charges that are printed are these:
| Item | Amount | Source |
|---|---|---|
| Re-inspection | $50, paid before the re-inspection | Building Permit Requirements packet |
| Electrician’s town exam | No fee | Contractor Registration Application |
| Contractor bond | $5,000, recorded with the Lake County Recorder | Contractor Registration Application |
| Contractor general liability insurance | $1,000,000 general, $500,000 per occurrence | Contractor Registration Application |
| IDEM stormwater Notice of Intent (1 acre or more) | $175 | IDEM |
| State design release (Class 1) | $75 filing fee plus a processing fee, generally $0.050 per gross sq ft | 675 IAC 12-3-2 |
Erosion control and jobsite housekeeping violations add re-inspection and clean-up fees, and occupancy is not granted until those fees are paid and any court citations are cleared.
Trade permits and who may pull them
Every contractor, subcontractor and specialty contractor working in Schererville registers with the department first, and the general contractor files a subcontractor list and keeps each sub’s registration current through the job. Inspections are requested by the subcontractor doing each trade.
Rather talk it over?
Call 1-855-478-4290 →- Registration package. The application in the firm’s legal name, general liability of $1,000,000 with $500,000 per occurrence naming the town as certificate holder (and as additional insured on town-owned property), and workers’ compensation of $100,000 per accident, $100,000 disease per employee and $500,000 disease policy limit, or a clearance certificate from the Worker’s Compensation Board if the firm has no employees.
- When to file. Only a new contractor, or one whose registration details have changed, fills out the application, and every document must carry the firm’s full legal name, including LLC, Co. or Inc.
- Bond. $5,000, naming as obligee the Board of Commissioners of Lake County and all cities, towns and municipalities in Lake County, recorded at the Lake County Recorder in Crown Point.
- Plumbers. A copy of the current Indiana plumbing license.
- Electricians. Must pass the town’s electrical exam: open book, two hours, no fee.
- Homeowners. May do their own work with an approved building permit from the town.
The town’s FAQ also answers that a licensed contractor is required, so that the person working on a property is registered, bonded and insured; ask the department how that applies before doing your own work. For a list of registered contractors, call 219-322-2211.
How to apply for a Schererville building permit
Each firm files the Contractor Registration Application with insurance certificates and its recorded $5,000 bond.
The short Building and Zoning Application for roofs, siding, windows and occupancy; the long form for new construction or any job that needs a plat of survey.
Two plats of survey, two sets of plans, the subcontractor list and the energy code report for a new home.
On any job that involves excavating, the general contractor reads and signs the town’s inspection instructions by the time the permit is issued; get the MS4 inspector’s approval before digging, and take the water tapping permit to Public Works for the spacer bar and backflow preventer.
File at Town Hall, 10 E. Joliet Street; for commercial work attach the state design release.
Display the permit on site and request each inspection 24 hours ahead at extension 6.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The plat of survey must show every item the Subdivision Control Ordinance lists, so a plat missing elevations, drainage direction or easements holds up a long-form application. Bring both sets of building plans: one is stamped and handed back with the permit, and that copy must stay on the job site for every inspection. On site, a red tag for erosion control or poor housekeeping brings re-inspection fees and, if it continues, stop work orders and a citation for each day the violation lasts. Rough inspections cannot be booked until the water meter spacer bar is in, and the rough and final building inspections wait until every subcontractor has called in its own. Indiana law since January 1, 2026 gives a unit that permits one- and two-family homes 7 business days to review plans after it confirms an application is complete.
Schererville inspections
Call 219-322-2211, extension 6, at least 24 hours ahead and speak to office staff to confirm; requests left on voicemail are not accepted. Keep a copy of the plans on site, leave keys or the building open, and provide ladders where needed. A failed inspection carries a $50 re-inspection fee due before the inspector returns.
| Trade | Inspections |
|---|---|
| Building | Footing (pre-pour), wall (pre-pour), foundation before backfill, concrete floor (pre-pour), rough, final |
| Plumbing | Underground, rough before drywall, final with water on |
| Electrical | Temporary pole, rough before drywall, service, final with power on; rough and service can be done together |
| Mechanical | Rough before drywall, final |
| Water and sewer taps | Called in to Public Works, 219-322-6688 or 219-322-5486; other utility locates through 811 |
Before final occupancy, landscaping must be complete under Ordinance 2004, passed April 10, 2024, and water meters may not be placed in crawl spaces. Construction debris may not go to the town dump, and a demolition needs the owner’s written permission, a call to Public Works to remove the water meter and, where it applies, an IDEM report.
Indiana building code in Schererville
Schererville’s permits exist to enforce the Indiana building code and local ordinances as a minimum standard for life, health, property and public welfare. Its own ordinances add stormwater and erosion control (Ordinances 694 and 2009), jobsite housekeeping (Ordinance 1097), plat of survey content (Ordinance 1095) and landscaping before occupancy (Ordinance 2004). The town code itself is linked as Schererville Town Codes from the Planning and Building menu, next to the Plan Commission, BZA and zoning pages, so check setbacks and district rules there before drawing a plat.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Schererville permit search and official resources
To get copies of permits, plans or inspection records, file the town’s Freedom of Information Act Request form, posted on the Planning and Building forms list, with Town Hall.
- Schererville Planning & Building: building permits
- Schererville forms and applications
- Building permit requirements and inspection sheet (PDF)
- Contractor registration application (PDF)
- Planning & Building FAQs
- Lake County Recorder (contractor bonds)
- IDEM construction stormwater permitting
- IDHS building plan review process
- IDHS: Fire Prevention and Building Safety Commission rules
- Indiana Plumbing Commission
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Schererville building permit FAQs
Do I need a permit to replace my roof or windows in Schererville?
Usually, yes. Re-roofing, re-siding and windows are on the town’s list of projects that usually require a permit, and they use the short Building and Zoning Application.
What do I need for a fence or shed permit?
A completed Building and Zoning Application and a plat of survey showing where it will go; a deck also needs building plans.
Can I do the work myself?
The town’s FAQ says a homeowner may, with an approved building permit; the same FAQ says a registered, bonded and insured contractor is required, so confirm with the department first.
How do I schedule an inspection?
Call 219-322-2211, extension 6, 24 hours ahead and speak to staff; voicemail requests are not taken.
How do electricians register in Schererville?
They file the contractor registration with insurance and the recorded $5,000 bond, and pass the town’s free, open-book, two-hour electrical exam.
What does a re-inspection cost?
$50, paid before the re-inspection takes place.
Do garage sales or block parties need a permit?
Usually yes. The Planning and Building Department takes calls about garage sales, block parties, special events and banners, which typically need a permit registered with the town.
Can I drain my pool into the storm sewer?
No. Drain it onto the ground, directed away from neighboring properties, so chlorinated or treated water can dissipate before it soaks in.
Simplify Schererville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Schererville sooner?
Let Alliance prepare, file, and track your Schererville permits while your crew stays on the job.
More Indiana permitting guides
Lake County
Read guide →St. John
Read guide →Cedar Lake
Read guide →Scott County Building Permit Guide
Read guide →Seymour Building Permit Guide
Read guide →Shelby County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Schererville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.