Perry County, Indiana Building Permit Guide

To get a building permit in Perry County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Perry County’s Planning and Zoning Department in Tell City issues improvement location and building permits for rural land more than two miles from Cannelton, Tell City and Troy, by appointment, after the county health department approves the sewage system.

Authority: Perry County Planning and ZoningReview: 2 business days for a home permitPhone: (812) 547-7121
Authority
Planning and Zoning2219 Payne Street, Tell City
Jurisdiction
Rural countyBeyond 2 miles of the 3 towns
Septic permit
$100Health Department, 812-547-2746
Permit term
Start in 1 yearFinish within 2 years

On unincorporated land in Perry County, the Perry County Planning and Zoning Department at 2219 Payne Street, Tell City, issues improvement location permits and residential building permits; call (812) 547-7121 for an appointment. Its jurisdiction ends two miles from the limits of Cannelton, Tell City and Troy. A home cannot be permitted until the Perry County Health Department approves the septic system or a sewer tap-in receipt is in hand, and the department allows 2 business days to review a complete residential application.

What requires a permit in Perry County?

Perry County’s zoning rules require an improvement location permit (ILP) whenever a structure is erected, constructed, reconstructed, moved, converted or enlarged. The permit also comes before certain uses of land and buildings, so a change in how a property is used can need one even with no construction.

County ILP required before

  • Building, rebuilding, moving, converting or enlarging any structure
  • Occupying or using vacant land
  • Occupying or using a structure that has been built, rebuilt, moved or enlarged
  • Changing the use of a structure or of land
  • Changing a nonconforming use

Other approvals that may apply

  • A septic permit from the Perry County Health Department for a new system; the department also oversees every septic improvement or repair
  • Health department site approval for an addition, rehab or accessory building on a lot with septic
  • Floodplain questions go to the Indiana DNR Division of Water
  • A Class 1 building needs the state Construction Design Release first
  • Inside two miles of a town, that town’s planning rules instead of the county’s

What Perry County decides and what the state holds

The county decides zoning, setbacks from property lines and county right-of-way, and whether an ILP or residential building permit issues, and its Plan Commission and Board of Zoning Appeals hear rezonings and variances. Its permit fees are set locally; the department’s page notes that they vary by project. Indiana holds the building codes, the design release for Class 1 structures, plan review for commercial septic systems and the licensing of plumbers, and the county health department applies the state septic rules locally.

Perry County building department: who handles permitting

The Planning and Zoning Department issues the permits and keeps a file of every improvement permit and application. Its jurisdiction, shared with the county Plan Commission and Zoning Appeals board, is all unincorporated land in Perry County lying more than two miles from the corporate limits of Cannelton, Tell City and Troy. The office works by appointment, and email goes to the department’s planningandzoning@perrycounty.in.gov address. Use the county’s GIS property map, linked from the department page, to see where a parcel falls.

Short on time to read all of this?

Get a free quote →
Perry County places and their permit offices
PlaceWho handles permits
Unincorporated land more than 2 miles from a townPerry County Planning and Zoning, 2219 Payne Street, Tell City; (812) 547-7121 for an appointment
Tell City and its two-mile areaInside the city, the Building Inspector’s office, 812-547-7490; the Tell City Planning Commission handles rezoning and subdivision in the city and its two-mile jurisdiction; City Hall, 700 Main Street, 812-547-5511
Cannelton and its zoning areaThe Cannelton Building Inspector issues building permits under the city zoning title, which also reaches the city’s extraterritorial zoning and platting area
TroyPermits are issued at the Town of Troy and Troy Utilities office after the Planning and Zoning Board and Town Council approve the plans

The towns run their own boards. Tell City’s five-member Board of Zoning Appeals hears nonconforming situation rulings, administrative appeals, special exceptions, development standard variances and use variances, and its 11-member Planning Commission also keeps the city’s comprehensive plan up to date. Troy’s Planning and Zoning Commission reviews zoning amendments, site plans and plats and advises the Town Council, while Cannelton’s code sets up an advisory Plan Commission with nine voting members.

Septic permits for the whole county come from the Perry County Health Department at 3214 Tell Street, Tell City (812-547-2746, weekdays 8 a.m. to 4 p.m.), where the sanitarian reviews system designs and inspects installations.

Perry County permit types

The department’s page offers two filings: the improvement location permit under the zoning regulations, and a building permit application, revised in October 2025, for residential projects. Both go to the same office, and the October 2025 form starts with a checklist of what must be attached.

Residential permits

  • New dwellings. A septic permit from the health department, or a sewer tap-in receipt where sewer is available, comes before the permit.
  • Additions, rehabs and accessory structures. Where a septic system is on the lot, a health department site approval permit is needed first.
  • Site plan. All property lines and streets, the size and location of every existing and proposed structure, setback distances to property lines and the county right-of-way, and every road easement on the property.
  • Building plans. A foundation plan and a floor plan for each level.
  • Subdivisions. If the lot is in an existing subdivision, check its conditions with the controlling entity.

Commercial permits

Businesses, churches, workplaces and buildings with three or more tenants are Class 1 structures; the Indiana Department of Homeland Security (IDHS) issues their Construction Design Release before construction, and the county ILP still covers the location, use and setbacks. Plans for septic systems serving commercial facilities are reviewed by the Indiana Department of Health’s onsite sewage program, and the county’s environmental health staff review plans for new and remodeled facilities where septic sewage disposal is involved.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Sewage approval. The county will not permit a residential structure until the health inspector has approved its sewage disposal system.
  • Recorded easements. Any easement or right-of-way the septic design needs must be recorded with the county Recorder before the septic permit issues.
  • Floodplain. FEMA lists unincorporated Perry County as participating in the National Flood Insurance Program, with maps effective October 18, 2019; the county page sends floodplain questions to the DNR Division of Water at 877-928-3755.
  • Zoning relief. Variances and rezonings go to the county Board of Zoning Appeals or Plan Commission, which meet only when there is business.
  • Class 1 design release. From IDHS, before any construction.

Perry County permit fees

The Planning and Zoning page links its current fee schedule under “View Permit Fees”, a 2025 county schedule, and says fees vary by project, so ask the office for the figure that fits your job when you book the appointment. The other fees on a Perry County project are published in full:

Published fees for Perry County projects
ItemFeeSet by
Septic system permit$100 (cash, check, money order, or card with a 3% processing fee)Perry County Health Department
Troy: principal building construction, reconstruction, addition or placement$25Troy Ordinance 2008-01
Troy: accessory structures and signs that need a permitNo feeTroy Ordinance 2008-01
Troy: demolition or relocation of a principal building$25Troy Ordinance 2008-01
Troy: driveway or parking lot construction or expansion$10Troy Ordinance 2008-01
Troy: construction dumpster, 60 days$10, one 60-day renewal for $10Troy Ordinance 2008-01
Troy: variance / conditional or special use$250 / $100Troy Ordinance 2008-01
Cannelton: house, principal building (includes the ILP)$25 for the first unit, $10 for each added unitCannelton code 7.10.060 (Ord. 96-02)
Cannelton: non-residential principal building$75Cannelton code 7.10.060 (Ord. 96-02)
Cannelton: building addition$25Cannelton code 7.10.060 (Ord. 96-02)
Cannelton: detached garage, carport, shed, pool, patio, fence or sign$5Cannelton code 7.10.060 (Ord. 96-02)
Cannelton: demolition, relocation or change in use$10Cannelton code 7.10.060 (Ord. 96-02)
Cannelton: drivewayNo fee, but a permit is requiredCannelton code 7.10.060 (Ord. 96-02)
Cannelton: variance / special use / appeal$150 ($50 for a variance on a single-family lot) / $150 / $50Cannelton code 7.10.060 (Ord. 96-02)
State design release (Class 1)$75 filing fee plus a processing fee, generally $0.050 per gross sq ft675 IAC 12-3-2

Rather talk it over?

Call 1-855-478-4290 →

Troy’s fees have applied since September 12, 2007 under the zoning ordinance it adopted that day. Cannelton’s amounts are the fee section of its zoning title as codified in the regional planning commission’s codebook (Ordinance 96-02, March 25, 1996); they are paid when the application is filed, and accessory buildings for agricultural use need no permit there. Ask Cannelton’s city office whether a newer schedule has replaced them. Tell City posts no fee sheet on its planning page; ask the Building Inspector’s office for the current amount.

Trade permits and who may pull them

The county’s pages describe no county license or registration for building contractors, electricians or HVAC firms on unincorporated land; the checklist asks only for the application, sewage approval, site plan and plans. The licensing that does apply comes from the state and from Tell City.

  • Plumbing. Indiana licenses plumbing contractors and journeyman plumbers through its Plumbing Commission, and a local unit may only ask a state-licensed plumbing contractor to register.
  • Septic installers. The installer completes the design and installation packet, must be on site for the sanitarian’s first visit and the cover inspection, and gives at least 48 hours’ notice before installing.
  • Soil scientists. Choose one from the department’s local list or the Indiana Registry of Soil Scientists.
  • Tell City contractors. The city keeps a contractor license list with separate columns for general, electrical, plumbing and HVAC contractors and the bond and insurance dates for each; ask the city office whether your firm must be listed before working in Tell City.

Rather not deal with the Perry County building department?

Get a free quote →

How to apply for a Perry County permit

1. Confirm the jurisdiction

Check the parcel on the county GIS map; within two miles of Cannelton, Tell City or Troy, go to that city or town instead.

2. Start the septic approval

Apply to the health department, have a registered soil scientist run the soil analysis, and have your installer submit the design and installation packet.

3. Prepare the site plan and drawings

Show property lines, streets, all structures, setbacks to lines and county right-of-way, road easements, a foundation plan and floor plans.

4. Book an appointment

Call (812) 547-7121 and bring the October 2025 application with the septic permit, site approval or sewer tap-in receipt.

5. Allow 2 business days

The department reviews a complete residential application in about 2 business days; missing items hold the permit.

6. Build on time

Start within one year of the permit and finish within two.

Review, corrections and what causes delay

The septic stage takes longest. The sanitarian may take up to 45 days to review the installer’s design packet, and once every paper is in, up to 30 days to issue or deny the septic permit under IC 16-41-25-1(a). A rezoning or variance waits for a Plan Commission or BZA meeting, which the county calls only when there is business to hear.

Inspections in Perry County

For septic work, the sanitarian makes a first site visit before the permit, with the system laid out and flagged as designed and the installer present, and then a cover inspection: the system may not be covered until the sanitarian has inspected it, and the installer must bring the right equipment and answer questions on site. The septic permit itself is handed out at the sanitarian’s office, 3214 Tell Street.

Protect the soil test area until the system is built. The department asks owners to mark every soil pit or boring with stakes or fence posts, or with flags labeled as a soil evaluation site, and to keep fill, cutting, scraping, compaction and tree or soil removal off the proposed septic site; an altered site needs a new soil evaluation before the permit can move ahead.

For buildings on county land, ask the Planning and Zoning Department at the appointment which site checks your permit needs; in Tell City, call the Building Inspector’s office on 812-547-7490. Under Cannelton’s code a building permit expires one year after it is issued, and the holder then applies again as if no permit had been granted.

Indiana building code in Perry County

The county applies its zoning regulations through the ILP, and Indiana’s building rules reach county projects through the state design release for Class 1 work. Troy has adopted the state unsafe building law, IC 36-7-9, for building standards in the town and its jurisdictional limits.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Perry County permit records and official resources

The Planning and Zoning Department keeps the file of improvement permits and applications for its jurisdiction, so ask it about an earlier ILP on a parcel; the health department issues septic permits and tests private water supplies, and Tell City, Cannelton and Troy keep the permits they issue.

Inspections are where schedules slip.

Get a free quote →

Perry County building permit FAQs

Who issues building permits in rural Perry County?

The Perry County Planning and Zoning Department, 2219 Payne Street, Tell City, for unincorporated land more than two miles from Cannelton, Tell City and Troy. Call (812) 547-7121 for an appointment.

How long does a residential permit take?

Allow 2 business days once the application and every checklist item are in; the septic permit that comes first can take much longer.

How much is a septic permit?

$100, paid to the Perry County Health Department by cash, check, money order or card, with a 3% charge on card payments.

How long is a county permit good for?

Construction must start within one year of the permit and be completed within two years.

I live near Tell City. Which office do I use?

Inside Tell City, the city Building Inspector’s office (812-547-7490). In the two-mile area around the city the county’s jurisdiction does not apply and the Tell City Planning Commission handles rezoning and subdivision, so ask the city which permit your project needs.

Does Troy charge for a building permit?

Under Ordinance 2008-01, $25 for a principal building, nothing for accessory structures and signs that need a permit, and $10 for a driveway, after the Planning and Zoning Board and Town Council approve the plans.

Who answers floodplain questions?

The county page refers them to the Indiana DNR Division of Water at 877-928-3755. FEMA’s maps for unincorporated Perry County took effect on October 18, 2019.

Simplify Perry County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Perry County sooner?

Let Alliance prepare, file, and track your Perry County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Perry County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.