Adams County, Indiana Building Permit Guide

To get a building permit in Adams County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Adams County Building and Planning Department in Decatur issues location, building and electrical permits for rural Adams County and the Towns of Geneva and Monroe; Decatur and Berne issue their own.

Authority: Adams County Building & PlanningFees: Ordinances 2015-1 and 2015-2Phone: 260-724-5305
Authority
Building & PlanningRural county, Geneva, Monroe
New house
$75 + $0.07/sq ftPlus $40 location permit
Septic
$100 permitAdams County Health Department
Office
Mon–Fri 8–4313 W. Jefferson St., Suite 338

For land outside Decatur and Berne, Adams County building work is permitted by the Adams County Building and Planning Department, Suite 338 of the county building at 313 W. Jefferson St., Decatur (260-724-5305), which covers the rural county and the Towns of Geneva and Monroe. It issues the improvement location permit, the building permit and electrical permits and inspects the work; under the county’s 2015 fee ordinances a new house is $75 plus $0.07 a square foot, plus a $40 location permit.

What requires a permit in rural Adams County?

The department issues two kinds of permit. A location permit (improvement location permit) checks every piece of new construction against the zoning ordinance and the flood maps; a building permit covers all new construction and remodeling on homes and commercial buildings. Its fee ordinance shows which jobs it prices and how the two permits combine.

Building permit and location permit

  • New houses, modular homes, manufactured homes and additions
  • Accessory buildings of 200 square feet or more, detached garages and carports
  • Decks (open or covered) and in-ground or above-ground pools
  • New gas line systems and appliance installations, grain bins, communication towers and wind energy systems
  • Commercial and industrial (Class 1) buildings, and flammable or combustible liquid storage that needs a state design release

One permit only

  • Remodels, electrical upgrades and temporary electrical service: building or electrical permit, no location permit
  • Outbuildings under 200 square feet: location permit only, no building permit
  • Ponds: a $40 location permit, with the surveyor’s pond review

A single-inspection permit ($30) covers small jobs such as gas line pressure tests, furnace, gas log and wood-burner installations, portable buildings that are not taken apart to move, and signs.

What the county decides and what the state holds

The county sets its own zoning and subdivision rules, the Area Plan Commission and BZA fees in Ordinance 2015-1, and the building fees in Ordinance 2015-2, both effective April 1, 2015. It keeps the flood zone maps and issues addresses. Its inspectors check that state and local building codes are met. Commercial (Class 1) buildings also need a state Construction Design Release before work starts, and the county’s fee for fuel storage systems applies only when a state release is required.

Adams County building department: who handles permitting

One county office handles planning, zoning and building for the rural county and two towns. Mark Wynn, the Plan Commission Director, is the department’s listed contact, and the department also staffs the Plan Commission, its Design Committee and the Board of Zoning Appeals.

Short on time to read all of this?

Get a free quote →
Adams County Building and Planning Department
DetailInformation
Office313 W. Jefferson St., Suite 338, Decatur, IN 46733
Phone / fax260-724-5305 / 260-724-5306
Emailbuildplan@co.adams.in.us
HoursMonday to Friday, 8 a.m. to 4 p.m.
Plan CommissionThird Thursday of the month as needed, 7 p.m., Adams County Service Complex, Room 100
Board of Zoning AppealsThird Thursday of the month as needed, 6 p.m., same room

Cities and towns in Adams County

Check the parcel on the county’s public GIS before you file to see whether it lies inside a city.

Who permits building work in each Adams County community
CommunityPermit office
Rural (unincorporated) Adams CountyAdams County Building and Planning, 260-724-5305
Geneva (town) and Monroe (town)Adams County Building and Planning, under the county’s zoning
Decatur (city)City of Decatur Building & Zoning, which issues all city building and improvement permits; Superintendent, 260-724-3814
Berne (city)City of Berne Building & Planning Services, which issues all city improvement location and building permits; Building & Planning Director, 260-589-8526

Adams County permit types

Residential permits

One- and two-family homes (Class 2) are charged on floor area, which counts basements, decks, garages and porches but not crawl spaces or attics that cannot be finished. Modular homes are charged on the basement, decks, garage and porches only. Manufactured homes in parks or on county lots have flat fees, as do the sheds, carports and detached garages that go with them. Accessory buildings that are not Class 1 have their own square-foot rate, and decks, pools, electrical services, gas systems and grain bins are flat fees.

Commercial permits

Industrial and commercial structures, which the ordinance calls Class 1 and says “includes all intensives,” are charged at a higher square-foot rate for new work and remodels. Fuel and flammable liquid storage systems carry their own fee when the state requires a design release. Commercial wind energy conversion systems carry a BZA special use fee of $2,500 per megawatt per tower (at least $20,000 a tower), a $2,500 location permit and a $2,500 building permit; a non-commercial wind system is $50, and communication tower co-locations are priced separately.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Rezonings, development plans (including intensive livestock development plans) and major subdivisions go to the Plan Commission; variances, special uses, contingent uses and special exceptions go to the BZA; minor subdivisions go to the Design Committee.
  • Septic. The Adams County Health Department (313 W. Jefferson St., Room 314, 260-724-5326) issues the $100 onsite sewage permit after a soil test by an approved Indiana Registered Soil Scientist and a plan from a registered installer; its process tells owners to check the Plan Commission and Building Department requirements too.
  • Driveway. All highway permits are filed at the Adams County Highway Department; a driveway must be at least 30 feet long, the department sets the pipe size, and the owner buys the pipe.
  • Drainage. The County Surveyor (Suite 251, 260-724-5349) reviews pond permits, commercial site plans and stormwater, and the Drainage Board oversees the county’s regulated drains.
  • Flood maps. The location permit checks the site against the county’s flood zone maps.

Adams County permit costs and fees

Building fees come from Ordinance 2015-2 and location permit and petition fees from Ordinance 2015-1, both effective April 1, 2015 and posted on the county’s fee schedule page. Most building permits also need the $40 location permit.

Adams County building and location permit fees
PermitFee
Improvement location permit (including ponds)$40
One- and two-family homes, new or remodel$75 + $0.07 per sq ft of floor area
Modular home$80 + $0.07 per sq ft of basement, decks, garage and porches
Accessory building (not Class 1)$75 + $0.04 per sq ft to 2,000 sq ft, then $0.02
Commercial or industrial (Class 1) new building$100 + $0.08 per sq ft to 20,000 sq ft, then $0.02
Class 1 remodel$100 + $0.06 per sq ft
Electrical service / service with new wiring$30 / $40
New gas system and appliances / gas pressure test$40 / $30
In-ground pool / above-ground pool / deck$50 / $40 / $50
Manufactured home, double / single$80 / $60
Grain bin / single-inspection job$50 / $30
Fuel storage system needing a state release, complete / partial$150 / $100
Re-inspection / inspection not ordered$50 / $50 per incident
Work without a permitDouble the permit fee

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the two ordinances: a new house with 2,400 square feet of floor area (counting the basement, garage, decks and porches) costs $75 + (2,400 × $0.07) = $243 for the building permit, plus the $40 location permit, or $283. Board fees are $200 for a variance or special exception, $250 for a rezoning or development plan, $400 for a major subdivision and $150 for the division of a minor subdivision; a special BZA meeting costs $550 and a special Plan Commission meeting $750.

Trade permits and who may pull them

The county itself issues electrical permits for any new electrical service or upgrade in its area, and gas work is permitted and inspected by the same office.

  • Electrical: $30 for a service and $40 when the inspection covers a new service plus interior rewiring.
  • Gas and heating: $40 for a new gas line system and appliance installation; furnaces, gas logs and wood-burners use the $30 single-inspection fee.
  • Plumbing: plumbing contractors hold the state license; septic installers must be registered with the Health Department.
  • Contractors: the county’s fee ordinances list no county contractor license or registration fee for builders, electricians or HVAC firms; call 260-724-5305 to confirm what the office needs on file.

How to apply for an Adams County building permit

1. Confirm the jurisdiction

Use the county GIS to check that the parcel is outside Decatur and Berne.

2. Settle zoning and flood questions

Ask Building and Planning whether the use is allowed and whether the site is in a flood zone; file any rezoning, development plan or BZA petition first.

3. Get the septic permit

For a new home on septic, arrange the soil test and installer plan and buy the $100 Health Department permit.

4. Get the driveway permit

File at the Highway Department for any new drive or field entrance on a county road.

5. Apply at Suite 338

Apply for the location permit and the building or electrical permit with the plans and floor area figures.

6. Order every inspection

Call the office for each required inspection; the fee ordinance charges $50 per incident for inspections not ordered and performed.

Rather not deal with the Adams County building department?

Get a free quote →

The septic permit comes first

On a lot without sewer, the Health Department’s written process makes the $100 septic permit a condition of the building permit: it must be obtained before the building permit and before any construction. The applicant attends the soil test with the soil scientist and the county sanitarian, which uses backhoe pits and a lab texture analysis; if the soil scientist finds the site unsuitable for any onsite system, the process ends unless the lot can connect to a sanitary sewer. The installer must be a registered Adams County contractor, and the plan review checklist and system drawing must be approved before the permit issues. Before work starts, the septic area is staked off and kept clear of equipment and soil piles, because a smeared or compacted site can mean a new soil test, a costlier system or a revoked permit. Absorption fields may not be installable in wet months, so the department advises scheduling around them.

Review, corrections and what causes delay

Projects that need a Plan Commission or BZA decision wait for the monthly hearing, which is held on the third Thursday only when there are cases. A missing septic permit or soil test holds up a new house. Since January 1, 2026 state law (IC 36-7-2.5) requires local units that permit one- and two-family work to confirm a complete application within 3 business days and finish plan review within 7.

Inspections in Adams County

County inspectors inspect projects through every phase of construction to see that state and local codes are met. The permit holder must order each required inspection from the Building and Planning office (260-724-5305); the fee ordinance charges $50 per incident for inspections that were not ordered and performed, and $50 for each re-inspection.

The Health Department must be told at least two working days before a septic system is installed so it can inspect, and the Highway Department sets culvert size and can build a 30-foot stone drive for $160 (stone included) or a 30-foot dirt field entrance for $50, plus $50 for each extra 10 feet. Road cuts are $520 on paved roads and $320 on stone roads.

Indiana building code in Adams County

Adams County enforces state and local building codes in the rural county, Geneva and Monroe, and checks every new building against its flood maps. FEMA’s Community Status Book lists unincorporated Adams County (community 180424) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2010; the county listing covers only unincorporated land.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Adams County permit search and official resources

The Building and Planning Department keeps the county’s records of new construction and remodels and its flood zone maps, so ask that office for a past permit or flood determination by phone, email or at Suite 338. Parcel maps are on the county GIS.

Inspections are where schedules slip.

Get a free quote →

Adams County building permit FAQs

Does the county issue permits in Decatur or Berne?

No. Decatur’s Building & Zoning office and Berne’s Building & Planning Services issue the building and improvement location permits inside those cities; the county covers the rural areas, Geneva and Monroe.

How much does a house permit cost?

$75 plus $0.07 a square foot of floor area including basement, garage, decks and porches, plus a $40 location permit; 2,400 square feet comes to $283.

Do I need a permit for a small shed?

An outbuilding under 200 square feet needs only the $40 location permit, not a building permit.

Do I need a permit to upgrade my electrical service?

Yes, a county electrical permit ($30, or $40 with new wiring); an electrical upgrade does not need a location permit.

Who issues septic permits?

The Adams County Health Department, for $100, after a soil test by an approved soil scientist and a plan from a registered installer.

What happens if I build without a permit?

The permit fee is doubled, and the fee ordinance adds $50 per incident for inspections that were not ordered and performed.

When does the Plan Commission meet?

On the third Thursday of the month at 7 p.m. when there are cases; the BZA meets the same day at 6 p.m.

Simplify Adams County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Adams County sooner?

Let Alliance prepare, file, and track your Adams County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Adams County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.