To get a building permit in Woodridge, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Woodridge’s Community Development Department on the first floor of Village Hall, 5 Plaza Drive, issues building permits inside the village; applications are filed in person or by mail, and permits are picked up and signed for at Village Hall.

Authority: Community Development DepartmentFiling: In person or by mailPhone: 630-719-4750
Authority
Community DevelopmentVillage Hall, 5 Plaza Drive
Roof or shed permit
$40Fence (residential) also $40
Contractors
No registration feeBonds, insurance or licenses by trade
Inspections
48 hours’ noticeCall 630-719-4750

Inside Woodridge, building permits come from the Community Development Department on the first floor of Village Hall, 5 Plaza Drive (630-719-4750; BLDG@woodridgeil.gov; Monday to Friday, 8 a.m. to 4:30 p.m.). Roof, sewer repair and water heater permits can be issued the same day, other residential permits take up to two weeks and commercial ones three to four. Common jobs carry small flat fees, such as $40 for a house roof, shed or residential fence, and contractors pay no registration fee.

What requires a building permit in Woodridge?

The village requires a building permit to build, alter, repair, demolish or move any building or structure. Its fee table and handouts show the permits people take out most often, and the permits FAQ answers the common borderline cases.

Permit needed

  • Roofs (house, multi-family and commercial)
  • Air conditioners, furnaces, water heaters and generators
  • Decks, porches, gazebos, patios, walkways and driveways
  • Fences, new or replacement
  • Sheds, playhouses and garages
  • Above-ground and in-ground pools and hot tubs
  • Electric service upgrades, EV chargers, solar and radon systems
  • Sewer and water line repairs and lawn-sprinkler backflow devices
  • Windows or doors where the opening changes size
  • Basement finishes, remodels, additions and new homes
  • Hen or chicken keeping, signs and pallet racking

No permit

  • Siding, gutters, fascia and soffits
  • Windows and doors replaced at the same size
  • Siding work that includes a roof needs a permit for the roof only, valued on the roof portion

A permitted job must begin within three months of issuance and be finished within a year; a project expected to take longer needs a completion schedule filed with the application.

What Woodridge decides and what the state holds

The Village Board adopts the codes, each with local amendments: the 2021 International Residential, Building, Existing Building, Mechanical, Fuel Gas, Property Maintenance, Fire and Swimming Pool and Spa codes, the 2020 National Electrical Code, the 2021 energy code, the 2014 Illinois State Plumbing Code and the 2018 Illinois Accessibility Code, plus the village’s own property maintenance and minimum security articles and the 2019 DuPage County Countywide Stormwater and Floodplain Ordinance. Zoning, condominium and subdivision rules sit in Titles 8 to 10 of the Village Code. Plumbers hold state licenses, and the village checks that a roofer’s State of Illinois license is on file before a roof permit issues.

Woodridge building department: who handles permitting

The Community Development Department runs building inspections and plan review, code enforcement, economic development, GIS and planning and zoning, and coordinates the building permit and development review process. Plumbing inspections are done for the village by a certified plumbing inspector from T.P.I. on Mondays, Wednesdays and Fridays, booked through the department. FEMA lists Woodridge in DuPage, Will and Cook counties; unincorporated land nearby goes to the county it lies in (DuPage County Building and Zoning, 630-407-6700; Will County Land Use Department; Cook County Building and Zoning, 312-603-0500), each of which permits unincorporated areas only.

Short on time to read all of this?

Get a free quote →
Woodridge permit contacts
DetailInformation
OfficeCommunity Development Department, first floor, Village Hall, 5 Plaza Drive, Woodridge, IL 60517
Phone and fax630-719-4750; fax 630-719-2900
EmailBLDG@woodridgeil.gov
HoursMonday to Friday, 8 a.m. to 4:30 p.m.
Plan CommissionFirst and third Mondays, 7 p.m., Werch Board Room, Village Hall
Village Hall main line630-852-7000

Woodridge permit types

Every permit starts with the village’s building permit application, listing all contractors, filed at the Community Development counter or by US mail; the village posts a handout for each common project type with the application attached. Plats of survey must be 11 by 17 inches, and staff can copy a single plat for you. Major residential projects (new homes, basement finishes, additions, remodels and three-season rooms) and major commercial projects (new buildings, remodels, alterations and additions) need five sets of drawings, folded rather than rolled.

Residential permits

  • Same-day permits. Roofs, sewer repairs and water heaters can be issued over the counter if everything the application and handout list is provided.
  • Air conditioners, furnaces and water heaters. Each needs a permit and a roughly 15-minute final inspection that the homeowner schedules. The village names the usual failures: breakers larger than the condenser label allows, missing bonding wire between the hot, cold and gas lines on water heaters (#8 copper on a 100-amp service, #4 on 200 amps), and missing sediment traps on gas appliances.
  • Pools. A plat showing the pool and the route of the electric or gas line, the equipment specifications and every contractor; extension cords are not allowed, and inspections cover the underground electric or gas line and a final.
  • Decks and patios. Decks are inspected at the ledger (if replaced), post holes and final, with railings checked; patios at the base and final. Uneven steps are the main reason these fail: riser and tread heights may not vary by more than 3/8 inch.
  • Fences. New and replacement fences need the application and a plat marking the fence line; no inspection is required, but the village spot-checks locations.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and industrial permits take three to four weeks and need five sets of drawings. A Certificate of Zoning Compliance must be issued before any commercial building permit or business license, and it can also be requested on its own to confirm a business is allowed at a location; ask for a planner at 630-719-4750. Commercial roofs are $100 per building, and fire alarm, fire sprinkler, low-voltage, sign and pallet racking work each have their own permit. Owners of three or more multi-family rental units need an annual residential rental license, with units in the village’s yearly inspection program and the fee due by January 1; owners of single-family rentals or of two or fewer multi-family units register for free, and every landlord or manager must attend the Police Department’s free crime-free housing seminar once.

What comes before the building permit

  • Zoning and development review. The Plan Commission advises the Village Board on zoning, special use and subdivision requests, zoning and building code variances and appeals of building and zoning decisions. Larger projects may start with a concept plan application before a formal development application, and the village posts current projects on an interactive map.
  • Stormwater and floodplain. The village enforces the 2019 DuPage County Countywide Stormwater and Floodplain Ordinance with its codes.
  • Lot drainage. The village says most of the yard flooding it sees comes from homeowner improvements such as regrading, retaining walls, raised planters, additions, pools, sheds and fences, and that diverting storm water is against state law. Check the lot’s drainage pattern first, keep drainage paths clear, and call Community Development before any work that could change drainage; the village publishes a homeowner’s guide to residential lot grading.
  • Digging. The village reminds owners to call JULIE at 800-892-0123 before setting fence posts or any other digging.

Woodridge permit costs and fees

The village’s permit applications page lists the fees below. Fees for other work, including additions, new homes and commercial construction, are in the comprehensive fee schedule in Village Code section 3-1A-3 (Ordinance 2019-53).

Rather talk it over?

Call 1-855-478-4290 →
Woodridge building permit fees (village permit applications page)
WorkFee
Roof, house / commercial or multi-family$40 / $100 per building
Fence, residential / commercial or multi-family$40 / $100
Shed$40
Air conditioner or furnace (residential); water heater$50 each
Patio, walkway or other flatwork$50
Driveway only$60 (walkway or stoop extra)
Deck, porch or gazebo; fireplace$100 each
Electric service$100
Pool, above ground / in ground$100 / $200, plus electrical fees
Sewer repair; water line repair; RPZ backflow device$75 each
Hen or chicken keeping$50
Low voltage, voice and data, commercial burglar alarm$100
Pallet racking$200
Re-inspection when work is not ready$100
Temporary occupancy, residential / commercial$75 / $150

Worked example: replacing a house roof ($40) and a water heater ($50) in the same season costs $90 in village permit fees, and both can usually be issued the same day. A failed or not-ready inspection that has to be repeated costs $100, more than either permit, so confirm the work is complete before calling. No village fee is charged to register contractors.

Trade permits and who may pull them

Woodridge charges no contractor registration fee, but every requirement for the trade must be met before the permit issues, and permits are picked up and signed for at Village Hall rather than mailed. Documents can be faxed to 630-719-2900, emailed to BLDG@woodridgeil.gov or mailed.

  • General contractors using streets or other public property: a certificate of insurance naming the village, with liability of $100,000 per person and $300,000 per accident (or $300,000 combined) and $50,000 of property damage cover.
  • Plumbers: state 055 and 058 licenses and a copy of the plumber’s photo ID license.
  • Electricians: a license from an Illinois municipality in good standing and a $10,000 surety bond payable to the village.
  • Blacktop, concrete, paver, water and sewer contractors: the general contractor insurance plus a $10,000 bond.
  • Roofers: a State of Illinois roofing license in good standing; alarm installers a state license; fire suppression contractors the general insurance.
  • Excavators and HVAC contractors are covered by the general contractor unless they pull the permit themselves (an in-ground pool or a furnace, for example), when they supply the insurance, and excavators the $10,000 bond.

Rather not deal with the building department?

Get a free quote →

The village does not recommend contractors, but its monthly issued-permit lists show the contractor, job and estimated cost for every permit, which owners can use to find firms that have worked nearby.

How to apply for a Woodridge building permit

1. Find the handout

Use the project’s handout and the permit application attached to it.

2. Check zoning

For commercial work get the Certificate of Zoning Compliance; for variances or development, talk to a planner.

3. Line up contractors

Send each contractor’s insurance, bond or license to the department.

4. Submit

Bring the application, 11 by 17 plat and drawings (five sets for major projects) to Village Hall, or mail them.

5. Wait for review

Same day for roofs, sewer repairs and water heaters; up to two weeks for other residential work; three to four weeks for commercial.

6. Pick up and sign

Pay and sign for the permit at Village Hall, then start within three months.

Review, corrections and what causes delay

Same-day service depends on bringing every item the application and handout list. Missing contractor paperwork holds a permit, because each trade’s requirements must be met before issuance, and major projects need all five folded plan sets. Call 630-719-4750 to check whether a property has open permits; staff can discuss how to close them out.

Inspections and certificates in Woodridge

Schedule inspections by calling Community Development at 630-719-4750 with the permit’s application number. Most need 48 hours’ notice; sewer repairs can be inspected the same day the permit is issued. Inspections run Monday to Friday in a morning or afternoon slot, with specific times only for water heater, HVAC and furnace inspections and for concrete pours. Roofs need no final inspection, and fences none at all, but most other permits close only with a passed final. The village warns that open permits can hold up the sale of a home, and work that failed its final must be corrected first. Temporary occupancy costs $75 for a house and $150 for a commercial space.

Construction is limited to 7 a.m. to 7 p.m. on weekdays and Saturdays from September through May, and 7 a.m. to 9 p.m. from June through August; on Sundays work is allowed only from 10 a.m. to 5 p.m.

Illinois building code in Woodridge

Woodridge enforces the 2021 International codes and 2020 National Electrical Code with local amendments. FEMA’s Community Status Book lists the Village of Woodridge (community 170737, Will, Cook and DuPage counties) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Woodridge building permit FAQs

Do I need a permit to replace siding or windows in Woodridge?

No for siding, gutters, fascia and soffits, and no for windows or doors replaced at the same size; a changed opening needs a permit.

How much is a roof permit?

$40 for a house and $100 per building for commercial or multi-family roofs; no final inspection is required.

Can I apply online?

The village takes applications in person at Village Hall or by US mail, and permits must be picked up and signed for there.

Do contractors pay to register?

No. There is no registration fee, but insurance, bonds or licenses are required by trade before a permit issues.

Does a fence need an inspection?

No, though a permit is required for new and replacement fences and the village occasionally checks the location.

How much notice do inspections need?

Usually 48 hours; sewer repairs can be inspected the same day. Call 630-719-4750 with the permit number to book.

Who hears building code variance requests?

The Plan Commission, which meets on the first and third Mondays at 7 p.m. and advises the Village Board.

Woodridge permit search and official resources

The village posts a list of every building permit it issues, month by month, showing the address, contractor, work and estimated cost; staff will also check for open permits on a property by phone. Other records are requested under the Freedom of Information Act on the Village Clerk’s FOIA request form (police records have their own form), following the village’s FOIA policy and fee information.

Inspections are where schedules slip.

Get a free quote →

Simplify Woodridge permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Woodridge sooner?

Let Alliance prepare, file, and track your Woodridge permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Woodridge permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.