For property inside the City of Wood River, permits come from the Building & Zoning Department at City Hall, 111 N. Wood River Avenue ((618) 251-3100, weekdays 8 a.m. to 5 p.m.). One permit application covers building, electrical, plumbing, mechanical, alarm and sprinkler work, pools and fences. Every fence needs a $20 permit, pools cost $25 plus $2 per $1,000 of work, and electrical permits run from $20 for a house. New houses need two sets of architect-sealed plans and about eight inspections, and each new occupancy needs a $50 occupancy permit and inspection. Madison County’s Building & Zoning Department covers only unincorporated land.
What requires a permit in Wood River?
The city’s single permit application lists the work it covers, and the department’s handouts add specific rules:
Building and site
- New construction, additions, alterations and repairs
- Roofs and siding
- Demolition
- Garages, carports, decks, covered patios and storage sheds
- Every fence
- Swimming pools and hot tubs
- Signs (separate sign application)
Systems and occupancy
- New or upgraded electrical service and service boxes
- Altering wiring that redistributes a breaker or circuit load, or changing a branch circuit
- Plumbing alterations, new work, repairs and replacements
- Mechanical, police or fire alarm, and sprinkler or suppression systems
- Any new occupancy of a house, apartment or commercial space
The application warns that work finished without the required inspections, or not built to the submitted plans, may have to be removed and redone at the applicant’s cost. Downtown, a building permit for exterior design work is also checked against the city’s Appearance Review Guidelines.
What the city decides and what the state holds
The City Council sets Wood River’s building, zoning and nuisance standards, and the Building & Zoning Department enforces them. The state supplies the plumbing and accessibility codes that appear on the city’s adopted-code list, licenses plumbers, and licenses roofing contractors; the city’s permit form makes plumbing work follow the State of Illinois Plumbing Code and asks for the plumber’s certification number.
Wood River building department: who handles permitting
The Building & Zoning Department handles building and occupancy permits, zoning and property maintenance enforcement; its administrator, Brad Wells, also serves as the city’s police chief. The department’s inspectors handle building and electrical inspections, and the Public Services Department handles water and sewer taps for new houses.
Short on time to read all of this?
Get a free quote →| Item | Details |
|---|---|
| Office | Building & Zoning Department, City Hall, 111 N. Wood River Ave., Wood River, IL 62095 |
| Phone / fax | (618) 251-3100 / (618) 251-3102 |
| Hours | City Hall Monday to Friday, 8 a.m. to 5 p.m.; closed major holidays |
| Water and sewer taps | Public Services Department, (618) 251-3122 |
| Finance and water billing | (618) 251-3131 |
| Hearings | Board of Zoning Appeals; Planning Commission |
Outside the city limits, Madison County’s Building & Zoning Department in Edwardsville issues permits for unincorporated land; see our Madison County building permit guide.
Wood River permit types
Residential permits
- New houses: two sets of plans signed and sealed by an architect, drawn to scale, with floor, site and foundation plans and elevations showing window sizes and building height. Approved plans cannot be changed without the city’s approval.
- City construction minimums: footings at least 40 inches below finished grade (8 by 16 inches for one story, 10 by 20 for two), 8-inch poured concrete or block foundation walls, no monolithic pours for the house, at most two layers of roofing, and 5/8-inch type X drywall on the garage ceiling and the wall shared with the house.
- Garages, carports, decks, patios and sheds: a site plan showing lot size, setbacks and height, which need not be to scale. Structures over 100 square feet sit on footings or piers; smaller sheds may be anchored with an 8-inch concrete post 24 inches deep at each corner. Pole barns are not allowed in residential areas, fabric carports are banned, and decks use treated lumber on 6-by-32-inch post footings.
- Pools and hot tubs: a scale site plan showing distances to lot lines, buildings, fences and overhead service wires. Pools sit at least 6 feet from side and rear lines, 10 feet from a street line and the house, never in the front yard, and inside a 4-foot fence with a self-closing latch (an above-ground pool 4 feet or taller with a removable or lockable ladder needs no fence).
- Fences: up to 6 feet in residential areas and 4 feet in front of the house, off the right-of-way, out of the 30-foot sight triangle on corner lots, and never barbed, electric or sharp-pointed in residential areas.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
The same application covers commercial building work, with separate sections for electrical, plumbing, mechanical, alarm and sprinkler contractors. Large electrical jobs need two sets of drawings, reviewed within 48 hours by the department and the Electrical Inspector, and commercial circuits may carry no more than 8 devices without prior approval. Signs need a sketch and a site plan reviewed by the Zoning Administrator, plus an electrical permit for lit signs. An owner may not lease commercial space until the city has issued an occupancy permit for it.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning: mark the lot’s district on the application (agricultural, residential, business, industrial or floodplain classes); the zoning code, revised through January 2, 2024, and the zoning map are online.
- Board of Zoning Appeals: variances, special use permits and appeals cost $250 each, with notice published in The Telegraph.
- Planning Commission: zoning amendments, special use amendments, annexations, planned unit developments and subdivision reviews, each limited to one parcel per application.
- Downtown design review: a written request gets a preliminary conference within 21 days, and a formal application a meeting within 21 days; a denial can be appealed to the City Manager within 30 days.
Wood River permit fees
The city’s handouts and forms print these fees; the general building permit fee is not printed on the department’s pages or forms, so ask Building & Zoning at (618) 251-3100 for the amount when you apply.
| Item | Fee |
|---|---|
| Fence permit | $20 flat, due when the permit is issued |
| Swimming pool or hot tub | $25 plus $2 for every $1,000 of estimated cost |
| Electrical, single-family house: general work / 100 amp / 200 amp / over 200 amp | $20 / $25 / $35 / $45 |
| Electrical, multi-family (per unit): general work / new construction | $30 / $50 |
| Electrical, multi-family: 100 amp / 200 amp / over 200 amp | $25 / $35 / $45 |
| Electrical, commercial | $50 plus $0.25 per amp over 100 amps |
| Occupancy permit | $50 per dwelling unit (first two inspections); $50 per extra inspection |
| Occupancy decision appeal | $50 |
| Variance, special use permit or appeal (BZA) | $250 each |
| General, permitted use or special use amendment, or annexation | $300 each |
| Planned unit development or subdivision review | $500 each |
| Kennel | $250 |
Worked example at the pool handout’s rate: a $12,000 in-ground pool pays $25 + (12 × $2) = $49. The electrical schedule cites Ordinance 08-06, and the occupancy fees come from Chapter 157 of the city code as amended in 2019. Planning Commission fees are charged per application, and each application may cover only one parcel.
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Electrical, plumbing and other trade work goes on the same city application, which records each contractor’s name and phone and, for electricians and plumbers, a certification number. Electrical work must meet the National Electrical Code and city codes, and the city’s minimum standards include a 100-amp minimum service, copper conductors only, service entrances on the main building only, rigid metal conduit, and no main panels in bathrooms, bedrooms, hallways, closets, living rooms or dining rooms. The standards also carry Ameren’s rule that horn-bypass meter sockets are no longer allowed on permanent services.
- Electricians: the City Clerk’s office lists an electrical license among the city licenses it issues; contact the Clerk at (618) 251-3100, option 3, for the requirements.
- Plumbers: plumbing must comply with the State of Illinois Plumbing Code; the form asks for the plumber’s certification number.
- Mechanical, alarm and sprinkler contractors: named on the application with a diagram of the work.
Electrical permits cannot be transferred to another person unless the Building and Zoning Administrator allows it, and they lapse 12 months after issue.
How to apply for a building permit in Wood River
Find the lot’s district on the zoning map and code; book a hearing first if you need a variance, special use or rezoning.
Show lot dimensions, every building on the lot including sheds, and the front, rear and side setbacks; the city publishes a typical site plan to copy.
New houses need two sets of architect-sealed plans; downtown exterior work goes through appearance review.
Complete the building, electrical, plumbing or other sections that apply and list the estimated cost of each trade, which the city uses only for office purposes, not tax assessment.
For a new house, call Public Services at (618) 251-3122 about taps.
Submit the application to Building & Zoning and pay the fee when the permit is issued.
Review, corrections and what causes delay
The city expects at least 48 hours to approve a pool permit and up to 48 hours to review a large electrical job. Applications move fastest with the pieces the handouts call for: sealed plans for a new house, a complete site plan with every building and setback, and a district that allows the use; fence permits are not issued until the Administrator has reviewed the site plan. Changes to approved plans need the city’s approval first, and downtown deviations from approved drawings can lead to revocation of the permit. A residential permit is valid for 12 months.
Rather not deal with the building department?
Get a free quote →Inspections in Wood River
The contractor is responsible for calling the city inspector or electrical inspector to book inspections, by appointment at (618) 251-3100; electrical inspections run Monday to Friday, 8 a.m. to 5 p.m. A new house or addition follows the city’s schedule:
- Footings (2): once excavated or formed with rebar in place, to check size and setbacks, and again during the pour.
- Foundation (1): before poured walls are placed, to check reinforcement.
- Framing (2): after the sill plate is set and floor sheathing delivered (termite shield and sill check), and when the structure is framed and enclosed with plumbing and wiring roughed in and uncovered.
- Drywall (2): before taping, and when finished; leave the garage drywall unfinished until the fire-rated board is seen.
- Final (1): after all work, wiring, debris removal and site work are done.
Electrical work gets at least two inspections: after a new or upgraded panel and meter base are installed but before the power company reconnects, and for larger jobs at rough-in and after fixtures are installed; a certificate of compliance follows. Pools need the Electrical Inspector before any wiring is covered and before start-up.
Occupancy permits
Since June 1, 2005, every change of occupancy needs an inspection and occupancy permit, and an owner may not rent or lease a unit until it has one. The application lists every occupant, with photo ID for adults and a signed lease; the city will not start water service until it is on file with the City Clerk. A two-week temporary permit, renewable once, lets a unit be occupied while repairs are made if the inspection finds no serious hazard; it is not available for dwellings the owner does not live in.
Building codes in Wood River
The city’s adopted-code page lists the 2021 International Building, Residential, Mechanical, Fuel Gas, Fire and Property Maintenance Codes, the 2012 International Private Sewage Disposal Code, the 2015 NFPA 101 Life Safety Code, the 2020 National Electrical Code, the current International Energy Conservation Code, the Illinois Plumbing Code, the Illinois Accessibility Code and the city’s 1996 Zoning Ordinance. Two older city handouts still cite earlier editions (the residential requirements sheet the 2012 codes adopted in 2018, and the electrical standards the 2008 NEC); the adopted-code page is the newer source. FEMA lists Wood River (community 170451) as participating in the National Flood Insurance Program, with its flood map dated May 1, 1979.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Wood River permit FAQs
Do I need a permit for a fence in Wood River?
Yes. Every fence needs a $20 permit, issued after the Administrator reviews a site plan showing the fence location, height and setbacks.
How much is a pool permit?
$25 plus $2 for every $1,000 of estimated cost, so a $12,000 pool pays $49. Allow at least 48 hours for approval.
Do I need an occupancy permit to rent out a house?
Yes. Each new occupancy needs an inspection and a $50 permit per unit, which covers the first two inspections.
Can I build a pole barn or put up a fabric carport?
No. Pole barns are prohibited in residential areas and fabric or canvas carports are banned; other carports must show they can carry snow and wind loads.
How long is a residential building permit good for?
Twelve months from issue; electrical permits also lapse after 12 months.
Does Madison County issue permits in Wood River?
No. The city’s Building & Zoning Department handles property inside Wood River; the county covers unincorporated land.
How many inspections does a new house need?
Eight under the city’s schedule: two footing, one foundation, two framing, two drywall and a final, plus electrical inspections.
Wood River permit records and official resources
For copies of permits, plans or inspection records, send a Freedom of Information Act request to the City Clerk’s office, which handles FOIA requests by email (address on the Clerk’s page) and with its request form; police records go to the police department. The Clerk’s office also sells the zoning code with maps, and council agendas, packets and minutes are posted on the city site.
Inspections are where schedules slip.
Get a free quote →- Building & Zoning Department
- Adopted building codes
- Forms and permits
- Permit application
- Single- and two-family construction requirements and inspection schedule
- Swimming pool and hot tub regulations
- Electrical permits and standards
- Fence permit brochure
- Typical site plan
- Sign permit application
- Occupancy permits
- Occupancy permit ordinance (Chapter 157)
- Zoning code
- Board of Zoning Appeals hearing request
- Planning Commission hearing request
- Downtown appearance review guidelines
- City Clerk (FOIA and licenses)
- FEMA Community Status Book, Illinois
Simplify Wood River permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Wood River sooner?
Let Alliance prepare, file, and track your Wood River permits while your crew stays on the job.
More Illinois permitting guides
Madison County
Read guide →Alton
Read guide →Collinsville
Read guide →Woodford County Building Permit Guide
Read guide →Woodridge Building Permit Guide
Read guide →Woodstock Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Wood River permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.