Collinsville, Illinois Building Permit Guide

To get a building permit in Collinsville, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Collinsville Building Department, part of Community Development, issues building permits inside city limits; applications go by e-mail to commdevfd@collinsvilleil.org or to the front desk at City Hall.

Authority: City of Collinsville Building Department (Community Development)Filing: E-mail or City Hall front deskPhone: 618-346-5200
Limited “U” permit
$50Roof, siding, windows, fences, sheds
Demolition “D” permit
$100Valid for 30 days
Residential plan review
5–7 daysDepends on the project’s scope
Inspection requests
Ext. 1143618-346-5200

Collinsville issues its own building permits for every property inside the city, whether the parcel sits in the Madison County or the St. Clair County part of town. The city sorts work into a $50 Limited “U” permit for exterior jobs such as roofing, siding, windows, fences and sheds, a Residential “R” permit priced on the total cost of the work, a Commercial “B” permit that always needs plans, and a $100 demolition permit. Send the application to commdevfd@collinsvilleil.org or drop it at the Community Development front desk, 125 South Center Street, and call 618-346-5200 ext. 1143 when the work is ready for inspection.

What requires a building permit in Collinsville?

The city’s rule is short: building permits are required within the City of Collinsville, and inspections are mandatory for certain types of work. Rather than a list of exemptions, the Building Department sorts every job into a permit class, and its advice for anyone unsure is to call the department before starting. The classes below come from the city’s building permit page.

Limited “U” permit

  • Roofing, siding and windows
  • Above-ground pools
  • Fences and sheds
  • Gutters and similar exterior work, residential or commercial
  • Electrical service repairs, new services and upgrades that involve Ameren or SW Electric
  • As a guideline, exterior work valued at more than $500 (the city notes there are exceptions)

Residential “R” permit

  • New houses and room additions
  • Garages, sunrooms and decks
  • Basement finishes
  • Total remodels and total kitchen or bathroom rehabs
  • Any residential work that involves plumbing, drywall or electrical

Commercial “B” permit

  • New commercial buildings and total renovations
  • Tenant finishes and commercial kitchen or bathroom work
  • Any mechanical, electrical or plumbing (MEP) work
  • Changes to façades, doors, windows, entrances, exits and exit pathways
  • Wireless facilities not covered by the small-cell rules or a franchise

Other city permits

  • Demolition (“D” permit), including sheds, carports and interior tenant spaces
  • Boarding up any window, door or opening
  • Land disturbance (grading) above the city’s area or volume trigger
  • Right-of-way excavation, including driveways
  • Small wireless facilities

The demolition permit covers houses and commercial buildings, mobile and modular homes, garages, carports and sheds, and also the clearing of an interior commercial tenant space before a new tenant finish. Boarding the windows, doors or openings of any building also needs city review and approval before it is done, under the standards in Chapter 15.60 of the municipal code.

Short on time to read all of this?

Get a free quote →

What Collinsville decides and what the state holds

The building regulations sit in Section 15.10 of the Collinsville code, and the city states that it adopted the 2021 ICC codes as of January 1, 2025. The city also sets its own permit classes, prices, validity periods and land disturbance thresholds. What the city does not control is the plumbing code and the licensing of plumbers and roofers, which are state functions: commercial jobs may need an approval from the State Plumbing Inspector before the “B” permit is issued. The small wireless rules in code sections 5.84 and 5.86 are written to be consistent with the state’s Small Wireless Facilities Deployment Act (Public Act 100-0585).

Collinsville building department: who handles permitting

Permits are issued by the Building Department within Community Development, led by Chief Building Official Kendrick Soer. The department’s staff list also includes a plumbing inspector and a building inspector, so plumbing and building inspections are handled in house. Two related permits come from other city offices: grading questions go to the City Engineer, and right-of-way work is reviewed and issued by the Department of Public Works, although its application is posted with the building permits because the two are often needed together.

City of Collinsville permit contacts
OfficeContact
Community Development front desk (applications)City Hall, 125 South Center Street, Collinsville, IL; commdevfd@collinsvilleil.org
Building Department main line618-346-5200
Inspection requests (administrative assistant)618-346-5200 ext. 1143
Chief Building Official618-346-5200 ext. 1123
City Engineer (land disturbance)346-5211 ext. 2211
Public Works (right-of-way and driveways)618-346-5200 ext. 1124

Collinsville straddles a county line. Of its 23,717 residents in the Census Bureau’s 2025 estimate, 21,162 live in Madison County and 2,555 in St. Clair County, but the county has no role in a building permit inside the city: the City of Collinsville issues it in both parts. Land outside the city limits is a different matter; in unincorporated Madison County the county’s Building & Zoning Department issues permits, as set out in the Madison County building permit guide.

Collinsville permit types

Every class has its own application, posted for download on the city’s building permit page. Pick the class first, because the class sets the price, the paperwork and how long the permit stays valid.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • Limited “U” permit. The most common permit in the city, used for exterior jobs on houses and businesses alike. Several jobs at one property can share a single U permit for one fee, for example a new roof, windows, gutters, a pool and a fence. Valid for six months.
  • Residential “R” permit. Everything residential beyond the U list, from a deck or basement finish to a new house. Building plans may be required depending on the work, and plan review may take 5 to 7 days. Valid for six months.
  • Electrical service permit. Service repairs, new services and upgrades that need Ameren or SW Electric to take part are filed on the U application.
  • Demolition “D” permit. For taking down a house, garage, carport, shed or mobile or modular home. Valid for 30 days; the Chief Building Official may grant an extension.

Commercial permits

  • Commercial “B” permit. Required for commercial work beyond the U list, including tenant finishes, kitchen and bathroom work, MEP work and changes to façades or exit paths. Building plans are always required, and outside approvals, such as the fire marshal’s or the State Plumbing Inspector’s, may be needed before the city issues the permit. Valid for six months.
  • Telecommunications towers. Wireless facilities other than small cells and franchise installations need a commercial B permit and must meet Chapter 15.44 of the municipal code.
  • Small wireless facilities. Small cells in the right-of-way, or outside it on land the city zoned only for commercial or industrial use, need a Small Wireless Facilities Permit, with fees set in code sections 5.84 and 5.86, plus a right-of-way permit when they sit in a city right-of-way.

Rather talk it over?

Call 1-855-478-4290 →

What comes before the building permit

  • Land disturbance (grading). Unless the code exempts the work, a permit is needed before disturbing more than 10,000 square feet of land or making cuts or fills of more than 4 cubic yards. A Minor permit, with no sediment and erosion control plans, covers disturbance under 10,000 square feet that stays within 100 cubic yards; individual homes, outbuildings, additions and small residential grading usually qualify. Anything larger, or anything that meets another trigger in Section 18.04.040, needs a Major permit backed by engineering calculations, design documents and sediment and erosion control plans.
  • Right-of-way excavation. A new or changed driveway, or any other work that reaches into a city right-of-way, needs a ROW Excavation Permit from Public Works.
  • Outside approvals for commercial work. Line up the fire marshal and state plumbing approvals early, since the B permit may wait on them.
  • Utility involvement. Any electrical service work that requires the involvement of Ameren or SW Electric needs a U permit.

Collinsville permit fees

The city’s building permit page gives flat prices for the limited permits and explains how the larger permits are priced; the valuation rates for R and B permits are not printed on that page, so ask the front desk for the figure on your job. The posted prices:

City of Collinsville building permit prices
PermitFee
Limited “U” permit (roof, siding, windows, fence, shed, above-ground pool)$50 unless noted otherwise, whatever the cost of the work
Electrical service repair, new service or upgrade$50 unless the service is over 400 amps (rates on the application)
Demolition “D” permit$100, valid 30 days
Boarding of a building$100, valid 90 days
Residential “R” permitBased on the total cost of all the work
Commercial “B” permitBased on the total cost of all the work, plus water and sewer tap fees and similar charges
Small Wireless Facilities PermitAs set in municipal code sections 5.84 and 5.86

The U permit’s flat fee covers several jobs. A homeowner replacing the roof, the windows and the gutters and adding a fence at the same time can list all four on one U permit and pay $50 in total, rather than $50 a job. The permit then runs for six months, so plan the jobs to finish inside that window. On a commercial job, budget separately for the water and sewer tap fees, which are added to the valuation-based B permit fee.

Rather not deal with the building department?

Get a free quote →

Trade permits and who may pull them in Collinsville

The city’s permit page lists no separate trade permits for most jobs; trade work is covered by the building permit for its class. In a house, any work involving plumbing or electrical wiring moves the job onto an R permit, and on commercial property any MEP work needs a B permit. The exception is electrical service work: a service repair, new service or upgrade that requires the involvement of Ameren or SW Electric is filed on the U application, at $50 unless the service is over 400 amps.

Plumbing is inspected by the city’s own plumbing inspector, and the work must meet the Illinois Plumbing Code and be done under a state-licensed plumber; roofing contractors hold a state license. The city’s building page does not set out an electrical contractor license, a contractor registration or a homeowner affidavit, so ask the front desk what it needs from the person whose name goes on the application before you file.

How to apply for a building permit in Collinsville

1. Choose the permit class

Match the job to a U, R, B or D permit using the city’s descriptions, and call the Building Department if it is unclear.

2. Download the application

Each class, plus grading, right-of-way and small wireless permits, has its own application on the city’s page.

3. Prepare plans

Commercial B permits always need building plans; R permits may need them, depending on the work.

4. Line up related permits

Get any land disturbance, right-of-way, fire marshal or state plumbing approval the project needs.

5. Submit

E-mail the application to commdevfd@collinsvilleil.org or bring it to the Community Development front desk at City Hall.

6. Pay and build within the validity period

Pay the fee and finish within six months (30 days for a demolition permit).

7. Call for inspections

Call 618-346-5200 ext. 1143 when each stage is ready.

Review, corrections and what causes delay

For residential R permits the city gives a plan review time of 5 to 7 days, depending on the scope of the project. Commercial permits can take longer for reasons outside the Building Department: the fire marshal or the State Plumbing Inspector may have to approve the work before a B permit is issued. A Major Land Disturbance Permit adds engineering design and erosion control plans to the package, so on a site that will be graded beyond the Minor limits, submit the grading application early. Watch the validity periods too: a demolition permit lasts only 30 days unless the Chief Building Official extends it, and boarding permits last 90 days.

Want this handled start to finish?

Get a free quote →

Inspections in Collinsville

Inspections are mandatory for certain types of work, and the city asks for a phone call when a job is ready: 618-346-5200 ext. 1143, the Building Department’s administrative line. Finish inside the permit’s life: a U, R or B permit is valid for six months, a demolition permit for 30 days and a boarding permit for 90 days.

The grading and right-of-way permits are issued outside the Building Department, so questions on them go to those offices: Public Works at ext. 1124 for driveway and other right-of-way work, and the City Engineer for Minor and Major land disturbance permits.

Building codes and flood maps in Collinsville

Section 15.10 of the municipal code holds the city’s building regulations, and the Building Department states that the 2021 ICC codes have applied since January 1, 2025. Telecommunications towers fall under Chapter 15.44 and boarding of buildings under Chapter 15.60, and Section 18.04.040 lists the triggers for a Major land disturbance permit.

FEMA’s Community Status Book lists the City of Collinsville (community 170439, St. Clair and Madison counties) as a participating community in the National Flood Insurance Program; its first flood insurance rate map is dated February 18, 1981, the same date as the current effective map.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Collinsville building permit FAQs

How much is a roofing permit in Collinsville?

A roof goes on the Limited “U” permit, which costs $50 unless noted otherwise, whatever the job costs, and stays valid for six months.

Can I put several exterior jobs on one permit?

Yes. The city lets a roof, windows, gutters, a pool and a fence share one U permit for the same $50 fee.

Do I need a permit for a fence or shed?

Yes. Both are listed as U permit work.

Do I need a permit to finish a basement or build a deck?

Yes, a Residential “R” permit, priced on the total cost of the work; plan review may take 5 to 7 days.

How much is a demolition permit?

$100, valid for 30 days; the Chief Building Official may extend it.

Inspections are where schedules slip.

Get a free quote →

Do I need a permit for a new driveway?

Yes, a ROW Excavation Permit from Public Works if the driveway reaches into the city right-of-way (618-346-5200 ext. 1124).

How do I schedule an inspection?

Call 618-346-5200 ext. 1143.

Does Madison County or St. Clair County issue permits in Collinsville?

No. The City of Collinsville issues building permits in both the Madison County and St. Clair County parts of the city.

Collinsville permit records and official resources

For the status or history of a permit, contact the Community Development front desk at City Hall or e-mail commdevfd@collinsvilleil.org.

Simplify Collinsville permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Collinsville sooner?

Let Alliance prepare, file, and track your Collinsville permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Collinsville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.