Inside Columbia, building permits come from the city’s Engineering & Inspections Department at City Hall, 208 S. Rapp Avenue (618-281-7144). Applications for building, sign, occupancy, zoning and demolition permits are filed only through the city’s Enterprise (EPL) Permitting & Licensing Portal, and fees come from Fee Ordinance No. 3739, which runs from May 1, 2026 to April 30, 2027: $80 per inspection, a $50 residential plan review fee and square-foot rates for new buildings. The city says a complete residential request is usually issued in three to five working days.
What requires a building permit in Columbia?
The city’s permit questions page gives a broad list. A building permit is needed for any new construction, demolition, room addition or alteration, a basement or bathroom finish, a garage, carport, deck, sunroom or shed, a playhouse over 32 square feet, and swimming pools. Several answers on the same page narrow it down for everyday jobs:
Permit needed
- Taking down an interior wall (permit and inspection)
- A bedroom added in a basement (egress window rules)
- Rebuilding a deck when beams or other structural members are removed
- Every new or replacement fence, including a small fence around an air conditioner
- Above-ground pools, plus a fence permit if the pool wall is under 4 feet
- Sheds, which must sit on a slab, concrete piers or a permanent foundation
No permit, per the city
- Replacing a roof (the roofer must hold an Illinois license)
- A screened porch with no walls attached to the existing structure
- Swapping deck boards or parts without structural work
- Reconnecting a sink after new countertops (no plumbing inspection)
- A retaining wall with a patio on top, unless the site is in a floodplain
Fences may be no taller than 6 feet, must be maintainable from both sides on the owner’s own lot, and follow Ordinance No. 2076; city approval does not stand in for any subdivision trustee approval. A pool at least 4 feet tall needs only lockable, removable stairs, while a lower pool must be fenced. Working without a required permit can bring legal action, a citation and, at a minimum, a stop work order posted on the property until a permit is issued.
What Columbia decides and what the state holds
The city sets its own permit list, zoning districts, setbacks, occupancy-permit rules and fees in its own ordinances, collected in the Municipal Code that the city publishes on Municode. For energy rules the city follows the same energy code as the State of Illinois. Plumbing work is governed by the Illinois Plumbing Code and plumbers are licensed through the Illinois Department of Public Health; roofers need an Illinois roofing license, which the city cites as the reason a re-roof needs no city permit.
Short on time to read all of this?
Get a free quote →Columbia building department: who handles permitting
The Engineering & Inspections Department oversees and issues all building and compliance work. Its Building Official, Jared Kertz, runs inspections, plan review, permit issuance and code enforcement, and also acts as the city’s Subdivision Administrator and ADA Coordinator. The Assistant Planner is the first point of contact for building, zoning and code-compliance applications; the City Engineer handles streets, stormwater and planning engineering and is the city’s Floodplain Administrator. The department has its own electrical inspector, and a code compliance officer handles violations of the building, property maintenance, sign and zoning codes.
| Office | Contact |
|---|---|
| City Hall (Engineering & Inspections, City Clerk) | 208 S. Rapp Ave., Columbia, IL 62236; 618-281-7144; fax 618-281-5477 |
| Building Official | 618-281-7144 ext. 115 |
| Building Permit Office (setbacks, inspections, occupancy) | 618-281-7144 ext. 105 |
| Applications not in the portal | Fillable PDF e-mailed to info@columbiail.gov or brought to the City Clerk |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
Columbia spans Monroe and St. Clair counties; FEMA lists it as one community in both, and the county you are in does not change who issues a building permit inside city limits.
Columbia permit types
The EPL portal handles the bulk of the city’s permits and licenses: residential and commercial building permits, sign and occupancy permits, zoning and subdivision applications, dumpster and PODS permits, temporary structure, demolition and excavation permits, and electrician registration. The city posts three short guides for it: how to register, a quick reference sheet and a step-by-step tutorial for applying.
Residential permits
- New houses. Charged by floor area (see the fee table) with a $50 plan review fee; occupancy inspections and the occupancy permit are included in the building permit fee for new construction.
- Remodels and additions. Charged on construction cost: $11 for the first $1,000 and $2.50 for each further $1,000, plus the $50 plan review fee unless the job is under $5,000 or 200 square feet.
- Accessory work. Fences ($50), pools, decks, sheds, carports and temporary structures each have their own permit or fee.
- Trade permits. An electrical work permit and a plumbing work permit cost $100 each.
- Occupancy on resale and rental. New owners need an occupancy permit under Ordinance No. 2381, and homes more than five years old must pass a city inspection when sold; rentals are inspected before a tenant moves in.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Non-residential new construction pays $145 minimum and $0.30 per square foot, with separate plan review charges for the building ($0.10 per square foot), automatic sprinklers ($200), fire alarms ($150) and kitchen suppression systems ($75). The city warns that larger commercial projects take longer than the usual three to five working days because review is extensive. Parking lots ($80), signs and temporary structures are permitted separately.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Setbacks depend on the zoning district; the Building Permit Office gives them by phone. Rezoning ($500 plus $15 per mailed notice) and special uses ($500) go to the Columbia Planning Commission at a public hearing; a variance application costs $1,500.
- Subdivision and plats. Minor subdivisions cost $250 plus $20 a lot, a land transfer plat $150, and public improvement plans are reviewed at 1.5% of the engineer’s estimate.
- Historic district. Work in the historic preservation district uses a Certificate of Appropriateness request, posted with the city’s forms.
- Floodplain. A Flood Plain Management Permit ($100, plus $80 per inspection) covers bridges, roads, structures and grading in a flood area.
- Utilities. A property within 200 feet of a sewer line must connect to it; water and sewer services have their own applications.
Columbia building permit fees
Fees are set in Title 18 of the Municipal Code and re-enacted each fiscal year. The minutes of the City Council’s April 20, 2026 meeting record the motion to pass Ordinance No. 3739 as “Motion Passed”; it took effect May 1, 2026 for the fiscal year ending April 30, 2027.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building, electrical, plumbing and other inspections and re-inspections | $80 per inspection |
| New house: up to 1,500 sq ft / 1,501–2,500 sq ft / over 2,500 sq ft | $0.30 / $0.25 / $0.20 per sq ft, $80 minimum |
| Residential renovation | $11 for the first $1,000 of cost, $2.50 for each additional $1,000 or fraction |
| Residential plan review | $50 (none if under $5,000 or 200 sq ft) |
| Non-residential new construction | $145 minimum; $0.30 per sq ft |
| Non-residential plan review | $0.10 per sq ft; sprinklers $200; fire alarm $150; kitchen suppression $75 |
| Electrical work permit / plumbing work permit | $100 / $100 |
| Plumbing or gas inspection (utility schedule) | $75 |
| Fence permit | $50 |
| Occupancy inspection (one re-inspection included) / occupancy permit | $85 / $30 |
| Demolition | $60 application plus $80 per inspection |
| Excavation permit | $100 |
| Flood Plain Management Permit | $100 plus $80 per inspection |
| Sewer connection, 5/8 to 1 inch water line | $2,769 |
| Water connection inside / outside city limits | $2,288 / $2,666 |
Renovation of a national, state or local historic landmark in the city carries no building permit fee, and the City Council may waive the fee for other historically significant buildings outside a historic preservation district. Dumpsters on private property while a new house or commercial building is under construction need no dumpster fee.
Worked example. A $20,000 kitchen and bath remodel covering 400 square feet is charged $11 for the first $1,000 plus 19 × $2.50 = $47.50 for the remaining $19,000, or $58.50, and the $50 plan review fee applies because the job is over $5,000 and 200 square feet: $108.50 before any $80 inspections the job requires.
Trade permits and who may pull them in Columbia
Electrical and plumbing work each take a separate $100 work permit, and the department’s inspections are billed at $80 each. Electricians working in the city register with Columbia: electrician registration is one of the licenses issued through the EPL portal, and the city publishes a list of registered electrical contractors. The city’s pool guidance says that a homeowner installing an above-ground pool who needs electrical work must list an electrical contractor on the application.
For plumbing, the Illinois Plumbing Code applies and plumbing contractors are licensed by the state Department of Public Health; Columbia’s own utility schedule adds a $75 plumbing or gas inspection. Re-roofing needs no city permit, but the city points out that the roofer must be licensed by the State of Illinois. Backflow devices on the water system are tested and reported on the city’s backflow test inspection form.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Columbia
Call the Building Permit Office at ext. 105 for the setbacks in your zoning district and check the official zoning map.
Create an account using the city’s registration guide; paper and e-mailed applications are no longer taken for building, occupancy or zoning work.
Upload a site plan and the drawings and other material the application guidelines ask for.
Add the electrical, plumbing or fence permits alongside the building permit.
Pay online or at the City Clerk’s office in City Hall.
Schedule each inspection with the Building Permit Office and obtain the occupancy permit before moving in.
Review, corrections and what causes delay
The city says a typical permit is processed and issued in three to five working days once all requirements are met; large commercial projects take longer. Missing site plans or drawings stall the clock, and zoning relief adds a Planning Commission or variance hearing on the city’s submittal calendar before a permit can be issued. Work in a floodplain or historic district needs its extra approval first.
Inspections and occupancy in Columbia
Building, electrical and plumbing inspections are scheduled with the Building Permit Office (618-281-7144 ext. 105), and each inspection or re-inspection is charged at $80 under the fee ordinance. Columbia also runs an occupancy inspection program. Under Ordinance No. 2381 every new home owner needs an occupancy permit, and a home more than five years old must be inspected by a city building inspector when it is sold; the city’s checklist for buyers asks for an inspection done within the past year. The buyer applies for the occupancy permit, but the city notes the $85 inspection is usually paid by the seller unless the house is sold as is. For a new house, the occupancy inspections and permit are covered by the building permit fee.
Rental units must be inspected before a tenant moves in. If a new tenant arrives within a year of the last inspection, only a new occupancy permit is needed; after a year, the unit is inspected again, and the landlord pays the inspection fee at the City Clerk’s office before it can be scheduled.
Building codes and flood rules in Columbia
The city’s permit pages do not list which building code editions Columbia enforces, and its Municipal Code is published on Municode; ask the Building Official which edition governs your plans. For energy efficiency the city follows the state energy code. The Engineering & Inspections Department is also guiding a new unified development code that will bring the city’s building, zoning and subdivision rules together.
Want this handled start to finish?
Get a free quote →FEMA’s Community Status Book lists the City of Columbia (community 170510, St. Clair and Monroe counties) as a participating community in the National Flood Insurance Program, with its first flood insurance rate map dated September 5, 1990 and a current map dated August 19, 2025. The City Engineer serves as Floodplain Administrator.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Columbia building permit FAQs
How do I apply for a building permit in Columbia?
Through the Enterprise (EPL) Permitting & Licensing Portal. The city no longer accepts paper or e-mailed applications for building, occupancy or zoning permits.
How much is a building permit for a new house?
$0.30 per square foot up to 1,500 square feet, $0.25 from 1,501 to 2,500 and $0.20 above 2,500, with an $80 minimum and a $50 plan review fee.
Do I need a permit to replace my roof?
No city permit is needed, but the roofer must be licensed by the State of Illinois.
Do I need a fence permit?
Yes, for every new or replacement fence; the permit costs $50 and fences are limited to 6 feet.
How long does a permit take?
Usually three to five working days for a complete request; large commercial projects take longer.
Do I need an inspection when I sell my house?
Yes if the home is more than five years old: the city inspects it ($85) and the new owner obtains an occupancy permit ($30).
Can a homeowner do the electrical work for a pool?
The city’s pool guidance asks for an electrical contractor to be listed when pool electrical work is needed, and points to its list of registered electrical contractors.
Columbia permit records and official resources
The department posts monthly building reports, and Council and Planning Commission agendas and minutes are in the city’s Agenda Center. Other permit records can be requested under the Freedom of Information Act by mail, e-mail, fax or in person; the city answers non-commercial requests within five business days (extendable by five) and keeps released records in a public FOIA portal.
Inspections are where schedules slip.
Get a free quote →- Columbia permits, licenses and inspections
- Enterprise (EPL) Permitting & Licensing Portal
- Fee Ordinance No. 3739 (May 1, 2026 to April 30, 2027)
- City of Columbia permit FAQs
- Engineering & Inspections Department
- Engineering & Inspections staff directory
- Columbia Municipal Code
- Monthly building reports
- Agendas and minutes
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Simplify Columbia permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Columbia sooner?
Let Alliance prepare, file, and track your Columbia permits while your crew stays on the job.
More Illinois permitting guides
Monroe County
Read guide →Waterloo
Read guide →St. Clair County
Read guide →Cook County Building Permit Guide
Read guide →Country Club Hills Building Permit Guide
Read guide →Crawford County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Columbia permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.