In unincorporated Monroe County, building and electrical permits come from the county Zoning Office (Zoning & Building), on the second floor of the Monroe County Courthouse, 100 S. Main St., Waterloo (618-939-8681 ext. 260). Apply through the county’s Cloudpermit system or e-mail or drop off a paper application. The building permit costs $5 per $1,000 of value plus $70 per inspection, and electrical contractors must be licensed with Monroe County. Columbia, Waterloo and the county’s villages are outside the county’s zoning jurisdiction.
What requires a building permit in Monroe County?
The Zoning Office’s answers to common questions set the practical rule for unincorporated land: any alteration or addition involving structural, electrical or plumbing work needs a permit, as do new homes, commercial buildings and larger sheds. The specific cases it spells out:
County permit needed
- New houses (the county posts a building permit packet for a new home)
- Additions and remodeling with structural, electrical or plumbing changes
- Sheds and carports of 100 square feet or more, including portable ones
- In-ground pools, which must also be fenced
- Commercial buildings, and a commercial change of use where the remodeling changes structure, wiring or plumbing
- Electrical work (separate electrical permit)
- Signs, home occupations and communication towers (their own permits)
Not regulated by the county
- Fences 6 feet tall or under (the restrictions in Section 40-4-4 of the zoning code still apply)
- Sheds and carports under 100 square feet
- Drainage disputes between neighbors (a private matter)
- Finding property corners (hire a surveyor)
Two of the FAQ answers carry construction rules rather than permit triggers. In-ground pools must be fenced as Section AG105 of the 2006 International Residential Code requires. And the county does not allow OSB as roofing material; 1/2-inch plywood or zip board is accepted instead.
What Monroe County decides and what the state holds
Monroe County sets its own zoning ordinances, Comprehensive Land Use Plan, fee schedule and electrical contractor licensing rules, and the Zoning Office enforces them. Its FAQ lists the codes it enforces as the 2006 International Building Code, the 2005 National Electrical Code and the most current Illinois State Plumbing Code, and the electrical licensing page dates the county’s electrical code adoption to June 1, 2006. Plumbing follows the state code, plumbers are licensed by the state, and roofing contractors hold a state license; the county adds its own electrician license on top.
Short on time to read all of this?
Get a free quote →Monroe County building department: who handles permitting
The Zoning Office issues building permits and electrical permits, administers zoning, flood zoning and zoning appeals, enforces the codes and the Monroe County Zoning Ordinances, and keeps the Comprehensive Land Use Plan up to date, all for the unincorporated areas of the county. The office is led by Zoning Administrator Chris Voelker. The county also has a Planning Commission, a Board of Appeals and a Comprehensive Plan Committee, each with its own page under Zoning & Building.
| Item | Detail |
|---|---|
| Office | Zoning Office, second floor, Monroe County Courthouse, 100 S. Main St., Waterloo, IL 62298 |
| Phone | 618-939-8681 ext. 260 |
| zoning@monroecountyil.gov | |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Online filing | Cloudpermit (apply, track status, request inspections) |
Cities and villages in Monroe County
About a third of the county’s 34,840 residents (11,235 in the Census Bureau’s 2025 estimate) live on unincorporated land, which is where the Zoning Office works. The rest live in two cities and five villages that are outside the county’s zoning jurisdiction.
| Place | Building permits |
|---|---|
| Unincorporated Monroe County (11,235) | County Zoning Office, 618-939-8681 ext. 260 |
| Columbia (city; 10,674 on the Monroe side) | City of Columbia Engineering & Inspections, through the city’s online EPL portal; City Hall, 208 S. Rapp, 618-281-7144. See the Columbia guide |
| Waterloo (city; 11,132) | City of Waterloo Zoning Office and Building Inspector, City Hall, 100 West Fourth Street, 618-939-8600. See the Waterloo guide |
| Valmeyer (1,204), Hecker (417 on the Monroe side), Maeystown (151), Fults (27) | Incorporated villages outside the county zoning jurisdiction; ask the village hall which permits it requires |
| Dupo (village; no residents on the Monroe side) | Village of Dupo, whose residents are all counted in St. Clair County |
To tell whether a parcel is unincorporated, check it on the county zoning map linked from the Zoning & Building page or call the Zoning Office before you file.
Monroe County permit types
Each permit has its own application on the Permits & Forms page, and building permits can also be filed and tracked in Cloudpermit.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- New home. The county posts a Building Permit Packet for a new home alongside the general building permit application.
- Additions and remodeling. A building permit whenever the work alters or adds structural, electrical or plumbing elements.
- Accessory buildings. Sheds and carports of 100 square feet or more, placed to meet the county setbacks in Schedule 2A, Area & Bulk Regulations.
- In-ground pools. Permit and a fence around the pool.
- Passive radon system. The county has a separate form for passive radon systems.
- Electrical permit. Its own application, filed by a Monroe County-licensed electrician or a homeowner who has passed the county test.
- Home occupation permit. $50, for a business run from a home.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
- Commercial buildings. All drawings must be signed and sealed by a design professional registered in Illinois.
- Change of use. A permit is required when the remodeling for the new use changes structure, electrical or plumbing; Section 40-2-37(e) of the zoning code governs.
- Signs. A $50 sign permit under the county’s Street Graphics Code, with its own application.
- Communication support structures. Cell towers and co-locations use their own application and fees.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning and setbacks. Schedule 2A sets the county’s area and bulk regulations, and permitted sheds and carports must be placed to meet the county setbacks; where a project cannot meet the rules, the county’s route is a Petition for Area/Bulk Variance.
- Special use, rezoning or text amendment. Petitions for a use the zoning district does not allow outright, for a new district on the zoning map, or for a change to the ordinance text; each is a separate zoning case with its own fee.
- Flood zoning. The Zoning Office administers flood zoning and has a Flood Plain Variance application for work that cannot meet the flood rules.
- Karst ground. The county posts a Karst Evaluation Packet among its building forms; ask the Zoning Office whether your parcel needs one.
- Wind and solar. Wind and solar projects have their own county ordinances, posted on the Zoning & Building pages.
Monroe County permit fees
The county’s fee schedule page lists the current charges for zoning and building work (the page shows no adoption date). The building permit has two parts: a fee on the value of the work and a charge for every inspection.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building permit | $5 per $1,000 of value, plus inspection fees |
| Building inspection | $70 per inspection |
| Electrical permit | $70 per inspection |
| Sign permit | $50 |
| Home occupation | $50 |
| Special use | $400 plus publication and certified-mail costs |
| Area/bulk variance | $400 plus publication and certified-mail costs |
| Zoning text amendment | $400 plus publication and certified-mail costs |
| Appeal | $400 |
| Rezoning, up to 5 acres | $400 plus publication and certified-mail costs |
| Rezoning, over 5 to 15 acres | $500 plus those costs |
| Rezoning, over 15 to 25 acres | $600 plus those costs |
| Rezoning, over 25 to 80 acres | $700 plus those costs |
| Rezoning, over 80 to 100 acres | $800 plus those costs |
| Rezoning, over 100 acres | $800 plus $6 per acre over 100, plus those costs |
| Cell tower | $25 per linear foot, plus permit fee; $500 filing fee, plus permit fee |
| Cell tower co-location | $1,000, plus permit fee |
| Electrical contractor registration | $500 the first year, then $125 a year |
Worked example. A detached garage valued at $40,000 carries a building permit fee of 40 × $5 = $200. The inspection fees come on top at $70 for each inspection the job needs, and any electrical permit for the garage’s wiring is charged at $70 per electrical inspection.
Trade permits and who may pull them in Monroe County
Electrical work in unincorporated Monroe County needs a county electrical permit, and only a county-licensed electrician or a qualifying homeowner may do it. Any contractor who installs or alters electrical equipment must be licensed with Monroe County, which requires:
Rather not deal with the Monroe County building department?
Get a free quote →- Proof of passing the ICC Master Electrical Test (G16)
- A certificate of liability insurance with at least $500,000 per occurrence and $1,000,000 general aggregate, naming the Monroe County Zoning Office at the courthouse as certificate holder
- A $10,000 bond on Monroe County bond forms, filed with the county
- The Electrical Registration Application and a $500 fee for the first year, then $125 a year
A homeowner may wire his or her own house only after passing the county’s Homeowner’s Electrical Test and must occupy the house for at least two years; the county posts study guidelines for the test. Plumbing follows the Illinois State Plumbing Code and is done by a state-licensed plumber, and roofers carry a state license. Whoever builds the roof, the county’s no-OSB rule for roofing material applies.
How to apply for a building permit in Monroe County
Check the county zoning map or call the Zoning Office; city and village parcels go to their own offices.
Read Schedule 2A and the district rules; file any variance, special use or rezoning petition first.
Use the new home packet for a house; commercial drawings must be sealed by an Illinois design professional.
Create an account, start the application (it can be saved and finished later) and upload the documents.
Download the fillable form, complete and save it, then e-mail it to zoning@monroecountyil.gov or drop it off at the courthouse.
The licensed electrician, or a homeowner who passed the county test, files the electrical permit application.
Pay the value-based fee and the $70 inspection fees, then request inspections in Cloudpermit or through the Zoning Office.
Review, corrections and what causes delay
Cloudpermit sends e-mail updates as an application moves through review, so applicants can follow it without calling the office. Zoning cases add time before the building permit: special use, variance, text amendment and rezoning petitions all carry publication and certified-mail costs on top of the fee, so expect a public notice period before a decision. For commercial work, have every drawing signed and sealed by the Illinois design professional before filing, as the county requires. Fillable forms work best in Google Chrome, and the county asks applicants to download each form to their computer, fill it out and save it before sending.
Want this handled start to finish?
Get a free quote →Inspections in Monroe County
Building inspections are part of every county building permit and are charged at $70 each; electrical permits are also priced per inspection. Permits filed through Cloudpermit can request their inspections in the same system, and the inspection results are sent to the applicant by e-mail. Questions about inspections on a paper permit go to the Zoning Office at 618-939-8681 ext. 260. Budget for the inspection count as well as the value-based fee: a job with five building inspections adds $350 in inspection fees to the permit.
Building codes and flood maps in Monroe County
For unincorporated land the Zoning Office’s FAQ names the 2006 International Building Code, the 2005 National Electrical Code and the most current Illinois State Plumbing Code as the codes it enforces, and its pool answer cites the 2006 International Residential Code. Ask the Zoning Office which editions it applies to your plans.
FEMA’s Community Status Book lists unincorporated Monroe County (community 170509) as a participating community in the National Flood Insurance Program, with its first flood insurance rate map dated May 15, 1986 and a current map dated August 19, 2025. Flood zoning in the unincorporated county is handled by the Zoning Office.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Monroe County building permit FAQs
How much is a building permit in Monroe County?
$5 per $1,000 of the value of the work, plus $70 for each inspection.
Do I need a permit for a shed or carport?
Yes if it is 100 square feet or larger, even if it is portable, and it must meet the county setbacks.
Do I need a permit for a fence?
No for fences 6 feet tall or under, which the county does not regulate; Section 40-4-4 of the zoning code still applies.
Does an in-ground pool need a permit?
Yes, and it must be fenced.
Can a homeowner do the electrical work?
Only after passing the county’s Homeowner’s Electrical Test, and the owner must occupy the house for at least two years.
Can I use OSB for roof sheathing?
No. Monroe County does not allow OSB as roofing material; use 1/2-inch plywood or zip board.
Can I apply online?
Yes, through Cloudpermit, which also tracks the permit and books inspections. Paper forms can be e-mailed or dropped off.
Does the county issue permits in Columbia or Waterloo?
No. Both cities issue their own; the county works on unincorporated land only.
Inspections are where schedules slip.
Get a free quote →Monroe County permit records and official resources
Applicants who file in Cloudpermit can follow the status of their own permits and inspections there at any time. For older county permit files or someone else’s permit, contact the Zoning Office at 618-939-8681 ext. 260 or zoning@monroecountyil.gov.
- Monroe County Zoning & Building
- Permits and forms, including Cloudpermit
- Zoning and building fee schedule
- Zoning Office FAQ
- Electrical contractor licensing
- Columbia building permit guide
- Waterloo building permit guide
- FEMA Community Status Book, Illinois
- Illinois CDB building codes and regulations
Simplify Monroe County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Monroe County sooner?
Let Alliance prepare, file, and track your Monroe County permits while your crew stays on the job.
More Illinois permitting guides
Waterloo
Read guide →Columbia
Read guide →St. Clair County
Read guide →Montgomery Building Permit Guide
Read guide →Montgomery County Building Permit Guide
Read guide →Morgan County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Monroe County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.