Montgomery, Illinois Building Permit Guide

To get a building permit in Montgomery, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Montgomery’s Building Division at Village Hall, 200 N. River Street, issues permits for the whole village in both Kane and Kendall counties, taking applications by email, mail, drop-off or, for a few jobs, online.

Authority: Building Division, Community DevelopmentFiling: permits@montgomeryil.orgPhone: 331-212-9023
Office
Building Division200 N. River St.; 8 a.m.–3:30 p.m.
Processing
3–5 business daysNo over-the-counter permits
Fee ordinance
No. 2002Passed April 10, 2023
No permit
A/C or furnace swapAlso gutters and dog runs

In the Village of Montgomery, the Building Division of the Community Development Department at 200 N. River Street (331-212-9023) issues building permits, licenses contractors and inspects work on both the Kane County and Kendall County sides of the village; its Chief Building Official is Mike Klupar. One application covers every project. It goes to permits@montgomeryil.org, by mail or to the counter, and decks, sheds, roofs and siding can also be filed online. Permits are processed in 3 to 5 business days, and fees come from Ordinance No. 2002 of April 10, 2023.

What requires a building permit in Montgomery?

The village lists permit-required home projects with a requirement sheet for each: basement finishing, decks, driveways and approaches, fences, lawn irrigation, patios, pergolas, gazebos and patio covers, sheds, solar panels, permanent swimming pools, roofing, windows and doors, siding when 50% or more is replaced, and electric vehicle chargers, plus business signs. New homes, additions and every commercial and industrial project also need a building permit.

Permit needed

  • Basement finishing and additions
  • Roofing, windows and doors
  • Siding when 50% or more is replaced
  • Decks, patios, pergolas and sheds
  • Fences and driveways
  • Permanent pools and irrigation
  • Solar panels and EV chargers

No permit

  • Replacing an air-conditioning unit
  • Replacing a furnace
  • Dog runs
  • Gutters
  • Flagpoles
  • Library kiosks

Any project that digs into the ground, such as a fence, patio or addition, needs a JULIE dig number before the permit is issued; the village will not process a deck application without one.

What Montgomery decides and what the state holds

Montgomery has adopted the 2021 International Building, Existing Building, Mechanical, Property Maintenance, Residential, Swimming Pool and Spa, Fire and Fuel Gas codes and the 2020 National Electrical Code, all with local amendments, along with the 2024 International Energy Conservation Code with the state’s amendments and the state plumbing code with village amendments. Plans for new homes, townhomes, non-residential buildings, additions and remodels must follow these editions.

Montgomery building department: who handles permitting

The Building Division handles building permits and inspections, contractor licenses, temporary use permits, the building sections of the Village Code and property maintenance enforcement. The Community Development Department, under Director of Community Development Sonya Abt, also runs planning and zoning. The village spans Kane and Kendall counties, and its Building Division permits on both sides. The unincorporated Boulder Hill area next to the village is not Montgomery’s: the village sends Boulder Hill residents to the Kendall County Building Department at 630-553-4141.

Short on time to read all of this?

Get a free quote →
Montgomery permit contacts
DetailInformation
OfficeCommunity Development, Village Hall, 200 N. River St., Montgomery, IL 60538
Building Division331-212-9023; permits@montgomeryil.org; Monday to Friday, 8:00 a.m. to 3:30 p.m.
Chief Building OfficialMike Klupar, 331-212-9024
Planning and zoning331-212-9022; Monday to Friday, 8:00 a.m. to 4:30 p.m.
Village Hall main line630-896-8080
Boulder Hill (unincorporated)Kendall County Building Department, 630-553-4141

Montgomery permit types

The single Building Permit Application asks for the site address and parcel number, the owner, the registered general, electrical, HVAC, plumbing, roofing and excavation contractors, the estimated construction value and the JULIE dig number, with the yellow sections filled in. Every file must be sent as a PDF.

Residential permits

  • Decks. Construction drawings (no freehand), the plat of survey with the deck marked, 42-inch post holes with piers at least 8 inches across, no posts buried in concrete, no building in easements, 36-inch railings once the deck is 24 inches or more above grade and stairs once it is 8 inches up; inspections are the post holes and the final.
  • Roofs. State whether it is a full or partial tear-off or an added layer (two layers at most) and attach the signed quote with pricing, or the insurance adjuster’s estimate including recoverable depreciation; ice and water shield and drip edge are required, followed by a final inspection.
  • Fences. No chain link anywhere in the village. A fence may not pass the front of the house unless it steps down to 3 feet (solid) or 4 feet (open picket), a corner side yard fence is limited to 4 feet unless set back 10 feet, posts go at least 36 inches deep, fences stay 12 inches from public sidewalks with the finished side out, and a street gate is required. Many subdivisions set their own style and height, from 6-foot wood, vinyl or metal to 4-foot cedar shadow-box.
  • Sheds. One shed per parcel, up to 200 square feet and 15 feet high, anchored, 10 feet from the house or garage and 3 feet from lot lines, never in an easement; a plastic storage shed of the Rubbermaid type needs no permit but must also stay out of easements.
  • Finished basements. Labelled drawings showing outlets, lighting, smoke detectors, HVAC supplies and returns, escape windows and plumbing; every bedroom needs an escape window, with smoke and carbon monoxide detection within 15 feet of each bedroom door. Inspections cover rough framing, electrical, mechanical and plumbing, insulation and the final.
  • Homeowner work. An owner doing his or her own building, electrical, plumbing or mechanical work signs the notarized Homeowner Installation Statement under section 6-105 of the Village Code; it does not apply to commercial or rental property.
  • HOA approval. The deck and roofing sheets remind owners to contact their homeowners’ association where one applies.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

All commercial and industrial projects need a building permit. New buildings and additions are charged by floor area, and remodels by valuation. Engineering and other outside reviews are passed through to the applicant, and the village’s own plan review fee is waived when an outside professional does the whole review.

What comes before the building permit

  • Zoning. The Planning & Zoning Commission recommends to the Village Board on annexations, preliminary plats, special uses, variations, text and map amendments and planned unit developments under the Unified Development Ordinance, and makes final decisions on appeals. It generally meets at 7 p.m. on the first Thursday of the month in the Village Hall board room; to file, email Community Development staff or call 331-212-9022.
  • Floodplain. New construction, substantial improvements and repairs of substantially damaged buildings in the special flood hazard area need an elevation certificate and any other floodplain certificate that fits, such as floodproofing or engineered flood opening certification.
  • Water and sewer. Connecting to the village water system carries a tapping fee under section 20-32, and new construction pays a $50 sewer and water inspection fee listed for Fox Metro.

Montgomery permit costs and fees

Ordinance No. 2002, passed by the President and Board of Trustees on April 10, 2023, created Section 1-12 of the Village Code, the comprehensive fee and deposit schedule for building and development. Fees are non-refundable except in exigent circumstances approved by the Director of Community Development, and any outside architectural, plan review or engineering costs are billed to the applicant.

Rather talk it over?

Call 1-855-478-4290 →
Montgomery fees, Ordinance No. 2002 (April 10, 2023)
WorkFee
New home or new commercial building$30 per 100 sq ft (or portion) of each floor, including basement, crawl space and garage
Addition or accessory building$25 per 100 sq ft (or portion)
Remodeling or basement finishing$90 up to $1,000 of valuation, plus $10 per additional $1,000
Re-roof (residential)$125
Deck, fence, patio, pergola, shed, siding, windows and doors$90 each
Detached garage$200
Pool$125 above ground; $200 in ground
Electrical upgrade / irrigation$125 each
Plan review$125 or 10% of the building fee, over 200 sq ft; none under 200 sq ft
Engineering site plan review (new home survey) / as-built review$150 / $200
Certificate of occupancy$100, plus $100 per unit in multi-unit buildings
Re-inspection$90
Contractor license$125 a year
Water tap, single-family home$6,283 (3.5 population equivalents at $1,795)
Work started without a permitPermit fee doubled, at least $90 extra

Worked example from the remodeling row: a basement finish valued at $25,000 pays $90 for the first $1,000 plus 24 × $10, or $330, before plan review and inspections. The water tapping fee is adjusted each year by the Engineering News-Record Construction Cost Index. Work for a governmental or charitable organization pays no village permit fee, though third-party costs are still reimbursed. Online filing through BS&A adds a $3 service charge whether the permit is approved or denied.

Trade permits and who may pull them

Montgomery requires all contracted work to be done by a contractor registered with the village, and asks residents to check a contractor’s registration before signing a contract. Each contractor files the registration application and a certificate of insurance naming the village, by email, mail or at the permit counter:

  • General, HVAC and solar contractors: $125 a year for the calendar year; solar installers also show an electrical license from another Illinois municipality.
  • Electrical contractors: a license from another Illinois municipality.
  • Plumbing contractors: the state 055 license and a letter of intent for the specific job address.
  • Roofing contractors: the state license and photo identification.
  • Fire sprinkler contractors: go to the fire protection district serving the site; the Building Division can identify it.

Plumbing permits are charged at $90 per inspection and may carry added plumbing review fees. Owners who do their own building, electrical, plumbing or mechanical work in their home file the notarized homeowner statement, and anyone else on the job must be a licensed contractor listed on the permit.

Rather not deal with the building department?

Get a free quote →

How to apply for a Montgomery building permit

1. Check the address

Make sure the property is in the village, not unincorporated Boulder Hill.

2. Get the JULIE number

Call 811 for any job that digs, and contact your HOA if you have one.

3. Register contractors

Every contractor on the job must be registered with the village.

4. Complete the application

Fill in the yellow sections and attach the plat of survey and drawings as PDFs.

5. File it

Email permits@montgomeryil.org, mail it or drop it off; decks, sheds, roofs and siding may use BS&A online.

6. Pay and schedule

Pay the fees and book the inspections the permit lists.

Review, corrections and what causes delay

Because of rising volume the village no longer issues permits over the counter; the Building page says permits are processed in 3 to 5 business days, while the Permits page asks applicants to allow up to a week for basic accessory permits. The requirement sheets say an application cannot be processed without the listed items and the JULIE dig number, freehand drawings are not accepted, and a re-roof needs the signed quote or the adjuster’s estimate. Re-issuing a permit for a change of contractor costs $100.

Inspections and certificates in Montgomery

Each requirement sheet lists the inspections the job needs, and the Building Division (331-212-9023, permits@montgomeryil.org, 8:00 a.m. to 3:30 p.m.) carries them out: post holes and final for a deck, final only for a roof, and rough framing, rough trades, insulation and final for a finished basement. A failed inspection or re-inspection costs $90.

The certificate of occupancy fee is $100, plus $100 for each unit in a multi-unit building, and new homes pay the $150 engineering review of the site plan survey and $200 for the as-built review. Temporary certificates of occupancy are issued under section 6-35 of the Village Code with a cash bond. In the special flood hazard area, the village’s certificate procedures call for three elevation certificates: one marked construction drawings with the permit application, one marked building under construction once the foundation and lowest floor are set, and a complete as-built certificate, reviewed and corrected if needed, before the certificate of occupancy or final approval; floodproofing and flood-opening certifications are due at the same point.

Illinois building code in Montgomery

Montgomery enforces the 2021 International codes and the 2020 National Electrical Code with village amendments. FEMA’s Community Status Book lists the Village of Montgomery (community 170328, in Kendall and Kane counties) as participating in the National Flood Insurance Program, with flood maps dated January 8, 2014, and in the Community Rating System at class 5, a 25% flood insurance discount, since May 1, 2015.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Montgomery building permit FAQs

Do I need a permit to replace my furnace or air conditioner?

No. Montgomery lists A/C unit and furnace replacement among the projects that need no permit.

How much is a re-roof permit?

$125 for a residential re-roof under Ordinance No. 2002.

Can I apply online?

Only for decks, sheds, roofs and siding, through BS&A with a $3 service fee; other permits go by email, mail or drop-off.

Does Montgomery permit work in Boulder Hill?

No. Boulder Hill is unincorporated, and the village sends residents to the Kendall County Building Department at 630-553-4141.

Do contractors need a village license?

Yes. All contracted work must be done by a contractor registered with the village; general, HVAC and solar contractors pay $125 a year.

How long do permits take?

Three to five business days, according to the Building page; basic accessory permits may take up to a week.

What happens if I build without a permit?

The permit fee is doubled, with at least $90 added.

Montgomery permit search and official resources

The Building page posts monthly building permit logs from 2021 onward. Other records can be requested in writing under the Freedom of Information Act through the Village Clerk’s online request form; the village answers within five business days, may take five more, and charges 15 cents a page after the first 50 printed pages.

Inspections are where schedules slip.

Get a free quote →

Simplify Montgomery permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Montgomery sooner?

Let Alliance prepare, file, and track your Montgomery permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Montgomery permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.