Wayne County, Illinois Building Permit Guide

To get a building permit in Wayne County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Wayne County has no building or zoning department; on rural land the county permits that matter come from the Wayne County Health Department in Fairfield, which approves septic systems and new wells.

Authority: No county building departmentSeptic and wells: Wayne County Health DepartmentPhone: 618-842-5166
County building permit
NoneNo building or zoning office
Septic permit
$50Health Department plan review
New well permit
$100State form, filed locally
Flood insurance program
Not participatingUnincorporated county

Wayne County’s government in Fairfield runs no building, zoning or planning office, so there is no county building permit for a house, barn or shop on rural land. What a rural builder does need comes from the Wayne County Health Department at 405 N Basin Road, Fairfield (618-842-5166): approved plans and a $50 permit for a private sewage system, and a permit for a new well. Fairfield, Wayne City, Cisne and the county’s other villages set their own building rules inside their limits.

What requires a permit in unincorporated Wayne County?

The county’s website lists its offices as the circuit clerk, coroner, county clerk, state’s attorney, supervisor of assessments, treasurer, county board and sheriff, with departments for animal control, probation, health, highways and emergency management. None of them is a building, zoning or planning office, and the county board’s minutes from July 2025 through October 2026 record no zoning, building-code, solar or wind ordinance. A rural builder therefore deals with these approvals rather than a building permit:

Approvals that apply

  • Private sewage system: plan review and permit from the Health Department
  • New water well, geothermal loop well or well sealing: permit through the Health Department
  • Work affecting a county highway: the Highway Department

Not found on the county’s pages

  • A county building permit or adopted building code
  • County zoning, setbacks or a zoning board
  • County electrical, plumbing or mechanical permits
  • A county floodplain permit (the county is not in the flood insurance program)

What the county decides and what the state holds

No county building code appears on the county’s pages; the state note below explains the statewide structural minimums. The Health Department enforces the state Private Sewage Disposal Code under the state licensing act, and the state water well and pump installation codes for wells. Plumbing follows the Illinois Plumbing Code with state-licensed plumbers, and roofers carry a state license.

Wayne County building department: who handles permitting

For unincorporated land, the Health Department is the permit office. The county’s parcel questions go to the Chief County Assessment Officer, whose office runs the county’s online mapping site, where you can see whether a parcel lies inside a village.

Short on time to read all of this?

Get a free quote →
Wayne County offices for rural projects
OfficeContact
Wayne County Health Department (septic, wells)405 N Basin Road, PO Box 645, Fairfield, IL 62837; 618-842-5166 (environmental health ext. 114); fax 618-842-3305
Highway Department (county roads)1309 East Main Street, Fairfield; 618-847-7343
Chief County Assessment Officer (parcels, mapping)Courthouse, 301 E Main St., Suite 101, Fairfield; 618-842-2582
County Clerk and Recorder (deeds, board records)Courthouse, 301 E. Main St., Suite 203; 618-842-5182, fax 618-842-6427
911 Coordinator618-847-8169
Emergency Management Agency505 SW 10th, Fairfield; 618-842-3884

Cities and villages in Wayne County

The county seat, Fairfield (population 4,794), is the only city. The villages are Wayne City (986), Cisne (612), Jeffersonville (349), Sims (164), Mount Erie (96), Johnsonville (80), Golden Gate (61) and Keenes (48); part of Mill Shoals, a village whose residents all live on the White County side, also lies in Wayne County. Each is a separate government with its own ordinances. The county’s pages do not say which of them run a building permit program, so a builder with a lot in a village should ask its village hall before starting.

Wayne County permit types

With no county building permit, the permit types on rural land are the Health Department’s three applications.

Residential permits

  • Private sewage disposal system: the plan review application, a joint Wayne and Hamilton County Health Department form revised in 2016, carries a $50 Wayne County permit fee. It asks for the owner and contractor with license number, the site’s legal location and directions, whether it is a new system or a renovation, the number of residents and bedrooms, garbage grinder, basement, water softener and hot tub details, the water supply, and the proposed system: septic tank size, seepage field or trench, chamber system, seepage bed, sand filter, aerobic unit, lagoon, chlorination and lift station.
  • Water well: the state’s application to construct, modify or abandon a water well, with a $100 permit fee (no cash), covering private, semi-private and non-community wells.
  • Geothermal loop well: a separate closed-loop well application from the Health Department.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and other non-residential buildings outside the towns also have no county building permit. A business on a private septic system files the same sewage application, giving its number of employees, design flow and any other wastewater sources. The Health Department’s sewage program covers systems with no surface discharge and those with a surface discharge treating 1,500 gallons a day or less.

What comes before construction

  • Confirm the land is rural: check the county mapping site or ask the assessment office whether the parcel is inside Fairfield or a village.
  • Septic design: soil data is needed only if the effluent discharges to waters of the United States and so needs a federal NPDES permit; otherwise the plan goes straight to review.
  • County roads: talk to the Highway Department about any entrance, culvert or work on a county highway.
  • Flood areas: FEMA lists unincorporated Wayne County as not participating in the National Flood Insurance Program, with flood hazard areas first mapped on January 9, 1981.

Wayne County permit costs and fees

There are no county building permit fees to budget for on rural land. The permit fees that do apply are printed on the Health Department’s application forms:

Wayne County Health Department permit fees (on the current application forms)
ItemFee
Private sewage disposal system permit (Wayne County)$50
Water well permit to construct, modify or abandon$100; no cash
Geothermal closed-loop wellSeparate application; fee not printed on the form
County building or zoning permitNone (no county program)

Rather talk it over?

Call 1-855-478-4290 →

A typical new rural home with its own septic system and well therefore pays $150 in county-administered permit fees: $50 for the septic permit and $100 for the well, before the installer’s and driller’s charges, which the county does not set. The septic form is dated 2016, so confirm the fee when filing. Inside Fairfield and the villages, building fees are whatever each town charges.

Trade permits and who may pull them

Wayne County issues no electrical, plumbing or mechanical permits and publishes no county contractor license or registration. The rules for who may do the work come from the state codes the Health Department enforces:

  • Septic systems: the application states that work not done by the homeowner, meaning the legal owner on the tax record, must be done by a licensed contractor, whose license number goes on the form.
  • Wells: wells and pumps are built under the Illinois Water Well Construction Code and Water Well Pump Installation Code, and the state well application identifies the contractor.
  • Plumbing: follows the Illinois Plumbing Code, performed by state-licensed plumbers.
  • Roofing: roofing contractors hold a state license.

Inside Fairfield and the villages, any trade permits or contractor rules are each town’s own.

How to get permits for a rural Wayne County project

1. Confirm the jurisdiction

Use the county’s online mapping or call the assessment office at 618-842-2582 to confirm the parcel is outside Fairfield and the villages.

2. Choose an installer

Hire a licensed private sewage contractor, or plan to install the system yourself if you are the legal owner on the tax record.

3. Design the system

Size the septic tank and treatment system for the home’s bedrooms and fixtures; add soil data if the effluent will reach waters of the United States.

4. File the sewage application

Submit the plan review application and $50 fee to the Health Department and wait for approval before building.

5. Permit the well

File the state water well application with the $100 fee through the Health Department, or the loop-well form for geothermal.

6. Check the road

Talk to the Highway Department at 618-847-7343 before any entrance, culvert or other work on a county highway.

Rather not deal with the Wayne County building department?

Get a free quote →

Review, corrections and what causes delay

The Health Department must review and approve a sewage system’s plans before construction, so no part of the system may be built before approval. The application has to describe the whole proposed system, from tank size and field area to the discharge point and pump chamber. A surface-discharging design also brings in the federal NPDES permit and the soil data that goes with it.

Inspections in Wayne County

Without a county building department there are no county building inspections or certificates of occupancy for rural homes. The inspections that happen are the Health Department’s: it reviews septic plans before construction, inspects and samples new and existing wells, and keeps track of abandoned wells and the rules for sealing them. If a household has been ill from a suspected waterborne illness, or a doctor asks, the department will sample the water supply and inspect the well. Water quality problems such as iron or hardness are referred to the Illinois State Water Survey, and bacteria questions to the Illinois Department of Public Health.

Inside Fairfield and the villages, any building inspections are run by the town.

Building rules in Wayne County

Wayne County has adopted no building code or zoning ordinance for unincorporated land on its posted pages, and its board minutes from July 2025 through October 2026 show none under consideration. The private sewage and well codes are enforced locally by the Health Department. FEMA’s Community Status Book lists Wayne County (community 171003, unincorporated areas) among the communities not participating in the National Flood Insurance Program.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

Wayne County permit records and official resources

Health permits are kept by the Health Department. County records go through the Freedom of Information Officer at the Wayne County State’s Attorney’s Office, 301 East Main Street, Fairfield: requests must be in writing, delivered in person, by mail, email or fax, and are answered within 5 business days, with up to 5 more on written notice. The county board meets on the second Thursday of each month at 7 p.m. in the courthouse basement; the last meeting on its 2026 calendar is December 10.

Wayne County permit FAQs

Do I need a building permit to build a house in rural Wayne County?

No county building permit exists: Wayne County has no building or zoning department. You still need a Health Department septic permit and a well permit if you drill a well.

How much is a septic permit in Wayne County?

$50, according to the Health Department’s plan review application.

Inspections are where schedules slip.

Get a free quote →

Can I install my own septic system?

Yes, if you are the legal owner on the tax record; otherwise a licensed contractor must do the work.

How much is a well permit?

$100 on the state water well application filed through the Health Department.

Does Wayne County have zoning?

No county zoning office or ordinance appears on the county’s pages or in its board minutes from July 2025 through October 2026.

Who handles permits in Fairfield or Wayne City?

The city or village itself, under its own ordinances; contact its city or village hall.

Who handles work next to a county highway?

The Wayne County Highway Department, 1309 East Main Street, Fairfield (618-847-7343), which handles the county highway system.

Is unincorporated Wayne County in the flood insurance program?

No. FEMA lists it among communities not participating in the National Flood Insurance Program.

Simplify Wayne County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Wayne County sooner?

Let Alliance prepare, file, and track your Wayne County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Wayne County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.