In Roscoe, a building project starts with a village zoning permit: the village requires zoning permits for certain building and construction work, takes applications at Village Hall or by email to permits@roscoeil.gov, and asks for up to two weeks of review time in peak construction season. Its zoning fee table runs from $25 for a fence to $150 for a single-family home and marks Winnebago County approval as required as well for houses, decks, pools and sheds over 200 square feet. The building permit and inspections themselves come from the Winnebago County Building Division in Rockford (815-319-4350), which lists Roscoe among the villages it serves. Village questions go to Village Hall at 815-623-2829.
What requires a permit in Roscoe?
Roscoe requires zoning permits for certain building and construction projects, and its review covers zoning and the architectural and landscape design of developments, multi-family and single-family homes, businesses, accessory buildings such as sheds, decks and pools, and business signs. The village says the review keeps projects in line with its objectives for quality architecture and appearance.
Village zoning permit (homes)
- New single-family homes
- Decks and pools
- Garages, sheds and other accessory buildings
- Fences
- Chicken coops
- Ground-mounted solar and generators
- Residential driveways, new or repaired
Village zoning permit (other)
- Multi-family, commercial and industrial buildings
- Exterior alterations
- Permanent and temporary signs
- Work in the public right-of-way
- Site development and erosion and sediment control plans
- Special events
What Roscoe decides and what the state holds
The village’s part is zoning and design review under its most recently adopted Zoning Ordinance and online Zoning Map, with variances and design review applications going to the Zoning Board of Appeals. The building code review and inspections that come with a house, deck, pool or larger shed involve Winnebago County, which the village’s fee table marks as a second approval for those projects. State rules sit on top: plumbing is done by plumbers licensed through the Illinois Department of Public Health, and roofing contractors are licensed by the state through the Illinois Department of Financial and Professional Regulation.
Roscoe building department: who handles permitting
Two offices are involved. The village’s Planning & Zoning Department reviews and issues the Roscoe zoning permit. Building permits and inspections come from the Winnebago County Building Division, part of the county’s Community Development Department at 404 Elm Street in Rockford: the county’s own page lists the Village of Roscoe among the places it serves, together with Cherry Valley, Durand, New Milford, Rockton, South Beloit and the unincorporated county (see the Winnebago County guide). Its Building Official and manager is Steve Girard.
Short on time to read all of this?
Get a free quote →To tell whether a property is in the village, look at the tax bill: if it lists the Village of Roscoe, the property is inside the village limits; if it does not, call Winnebago County Planning and Zoning at 815-319-4350 about permits. The Winnebago County Treasurer’s website shows the bill if you do not have a copy.
| Detail | Information |
|---|---|
| Village permits | Planning & Zoning, Roscoe Village Hall; 815-623-2829 |
| Permit email | permits@roscoeil.gov |
| Business licenses | frontdesk@roscoeil.gov |
| County building permits and inspections | Winnebago County Building Division, Community Development Department, 404 Elm Street, Room 403, Rockford, IL 61101; 815-319-4350; fax 815-319-4351; Building Official Steve Girard |
| County building hours | Winnebago County Administration Building, 8 a.m. to 5 p.m.; main line 815-319-4444 |
| Property lines | Wingis property-line viewer, linked from the village permits page |
Roscoe permit types
The village’s applications are returned to Village Hall or emailed to permits@roscoeil.gov with all required attachments. The fee table marks a site plan for nearly every application, showing the dimensions of the work and its distance from the lot lines.
Residential permits
- Zoning permit. One application covers pools, decks, garages, sheds and other accessory buildings; a new single-family home uses the same zoning step with a $150 fee.
- Driveway construction and repair. A residential driveway permit costs $25.
- Chicken coop. Its own application and a $25 fee.
- Fences. A $25 zoning permit, with no county approval marked in the fee table.
- Solar and generators. Ground-mounted solar is a $50 zoning permit; the table shows no village fee for roof-mounted solar and no fee amount for generators.
- Siding and roofing. The fee table lists siding or roofing work with no village fee.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
- Commercial, industrial and multi-family buildings. Zoning permits with fees that vary by project, plus county approval.
- Signs. A permanent outdoor advertising sign is a $25 permit; temporary advertising signs have their own application.
- Planned unit developments and site development. Separate PUD and site development applications, with an erosion and sediment control plan.
- Developer agreements. A developer reimbursement of fees agreement is among the village’s forms.
- Special events. Block parties, neighborhood garage sales and similar events file 30 to 60 days ahead, depending on the event.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Village or county. Use the tax bill test above to find out which office you start with.
- Zoning Board of Appeals. Variances and design review go to the ZBA on the ZBA General or ZBA Design Review application.
- Right-of-way. Work in the public right-of-way needs a right-of-way construction and repair permit.
- Utility locates. Submit a JULIE request before digging; JULIE is a free one-call service, and the utilities mark their own lines.
- Floodplain. Roscoe participates in the National Flood Insurance Program, so building in a mapped flood hazard area brings floodplain review.
Roscoe permit costs and fees
The village’s Zoning Permit Fees table, linked from its permits page, sets the village’s charges and marks where Winnebago County approval is required as well. The table is undated, and county building permit fees are separate and are not part of it.
| Application | Village zoning fee | Winnebago County approval |
|---|---|---|
| Single-family home | $150 | Required |
| Multi-family home | Varies | Required |
| Exterior alteration | Varies | Required |
| Commercial or industrial building | Varies | Required |
| Deck | $50 | Required |
| Pool | $50 | Required |
| Accessory building, shed or garage | $50 | Required if over 200 sq ft |
| Fence | $25 | Not marked |
| Chicken coop | $25 | Required |
| Ground-mounted solar | $50 | Required |
| Generator | No amount shown | Required |
| Roof-mounted solar; siding or roofing | No village fee shown | – |
| Residential driveway | $25 | Not marked |
| Permanent sign (outdoor advertising) | $25 | Required |
| Temporary sign | No amount shown | Not marked |
| Variance (Zoning Board of Appeals) | Varies | Not marked |
| Right-of-way work | $200 inspection fee and $100 for each right-of-way | Not marked |
Rather talk it over?
Call 1-855-478-4290 →Winnebago County’s own charges are in its Building Fee Schedule and Structural Valuation Table, with zoning fees under county ordinance 2019-CO-049; the county posts them as scanned documents and notes that its fees can change by County Board action, so call 815-319-4350 for the county amount. The one county figure in its readable sheets is the $30 re-inspection fee for a third visit.
Worked example. A new single-family home with a 240-square-foot detached garage pays the $150 home zoning fee and the $50 accessory building fee, $200 in village zoning fees in total; both need Winnebago County approval too, because the house is marked and the garage is over 200 square feet, and the county’s fees are added separately.
Trade permits and who may pull them
Roscoe’s own permits are zoning permits, and its permit list has no electrical, plumbing or HVAC permits. The trades are handled by Winnebago County’s Building Division, whose inspection sheet lists separate structural, electrical, and plumbing and HVAC inspectors. Since April 1, 2016 the county has worked under the 2014 National Electrical Code, the 2015 International Mechanical and Fuel Gas Codes and the 2014 Illinois State Plumbing Code. Plumbers hold the state license issued through the Illinois Department of Public Health, and roofers the state roofing license. The county’s reference handouts cover electrical service hook-ups and swimming pool, spa and hot tub wiring.
The village’s permit pages describe no village contractor license or registration; its licenses are business licenses (gaming, amusement and vending, used car dealers, liquor, massage establishments and peddlers), filed with the front desk at frontdesk@roscoeil.gov. Ask the county Building Division at 815-319-4350 who may sign for trade work on a county permit.
Rather not deal with the building department?
Get a free quote →How to apply for a Roscoe permit
If it lists the Village of Roscoe, start with the village; if not, call Winnebago County at 815-319-4350.
Use the village’s Zoning Map and Zoning Ordinance and the Wingis property-line viewer.
Show the work’s dimensions and its distance from every lot line.
Return it to Village Hall or email it with all attachments to permits@roscoeil.gov.
Use the Zoning Permit Fees table to budget.
Where the table marks it, file Winnebago County’s Commercial & Residential Building Permit Application; commercial jobs need three hard-copy sets of prints, a digital copy, COMcheck if applicable and the zoning clearance.
Submit a locate request so the utilities mark their lines.
Review, corrections and what causes delay
The village asks for up to two weeks for permit review during peak construction season and says processing times vary with the number of applications. A complete package with the site plan and all attachments helps; projects that need a variance or design review add a Zoning Board of Appeals step, and special events must apply 30 to 60 days ahead. On the county side, a permit is valid for one year, but it becomes invalid if work does not start within 180 days of issue or stops for 180 days; the building official may grant written extensions of up to 180 days each when you ask in writing and show good cause.
Inspections and certificates in Roscoe
Right-of-way work carries a village inspection fee of $200, plus $100 for each right-of-way. Building inspections are made by Winnebago County under its permit. The county posts an Inspection Request Form, a fillable document you download, complete and submit from the button at its foot; an inspector then confirms the date and time. The permit holder must tell the building official when work is ready and give access for the inspection, and no work may go past each inspection point until it is approved.
- Foundation, once trenches or piers are dug, forms set and any reinforcing steel placed, before concrete.
- Rough plumbing, mechanical, gas and electrical, before anything is covered and before the framing inspection.
- Floodplain, with elevation documentation of the lowest floor by a registered design professional.
- Frame and masonry, and backfill once the foundation is damp-proofed and drain tile installed.
- Fire-resistance-rated construction where the job has it.
- Final, when the permitted work is complete and before occupancy.
Want this handled start to finish?
Get a free quote →The county’s explanation of the process gives inspectors three working days from a request to make the visit; requests called in before 9:00 a.m. are done that day if the workload permits. Work that is not finished when the inspector arrives, or that does not meet code, is an automatic fail, and written corrections are left on site. Inspectors make up to two visits for a given inspection; a third visit after a second failure costs $30, paid at 404 Elm Street, Room 403, before any further inspection. Flagrant violations can bring a Notice of Violation. These county sheets were last revised in 2015 and 2007, so confirm current practice when you book.
Illinois building code in Roscoe
The village administers its Zoning Ordinance, and Winnebago County’s Building Division applies the building codes. Its codes page says that since April 1, 2016 it has followed the 2015 International Building, Residential, Fire, Fuel Gas and Mechanical Codes, the 2014 National Electrical Code and the 2014 Illinois State Plumbing Code, each adopted by a 2016 county ordinance. FEMA’s Community Status Book lists the Village of Roscoe (community 170724) as participating in the National Flood Insurance Program since March 1, 1982, with flood maps dated February 17, 2016; the village is not in the Community Rating System.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Roscoe permit FAQs
Do I need a village permit, a county permit or both?
Check your tax bill. Inside the village you need a Roscoe zoning permit, and for houses, decks, pools and sheds over 200 square feet the fee table marks Winnebago County approval as well; outside the village, call Winnebago County at 815-319-4350.
How much is a zoning permit for a new house in Roscoe?
$150, with Winnebago County approval also required.
Do I need a permit for a fence in Roscoe?
Yes, a $25 village zoning permit; the fee table does not mark county approval for fences.
How long does permit review take?
Allow up to two weeks for the village zoning permit during peak construction season; the county building permit is a separate review.
How do I book a building inspection for a Roscoe project?
Use Winnebago County’s Inspection Request Form; questions go to the Building Division at 815-319-4350. Inspectors have three working days to come, and a third visit after two failures costs $30.
Does a shed need county approval?
Only if it is over 200 square feet; the village zoning permit costs $50 either way.
How long is a county building permit good for?
One year, provided work starts within 180 days and is not suspended for 180 days; written extensions are possible.
Inspections are where schedules slip.
Get a free quote →What does right-of-way work cost?
A $200 inspection fee and $100 for each right-of-way.
Roscoe permit search and official resources
For the status of a village permit, email permits@roscoeil.gov or call 815-623-2829 with the address. For a county building permit or inspection on a Roscoe property, call the Winnebago County Building Division at 815-319-4350.
- Roscoe licenses and permits (applications, zoning map and ordinance)
- Roscoe zoning permit fees
- Roscoe Zoning & Planning
- Winnebago County Building Division (places served)
- Winnebago County permits, forms and fee schedules
- Winnebago County codes and ordinances
- County permit expiration and inspection requests
- County minimum requirements for inspections
- FEMA Community Status Book, Illinois
Simplify Roscoe permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Roscoe sooner?
Let Alliance prepare, file, and track your Roscoe permits while your crew stays on the job.
More Illinois permitting guides
Winnebago County
Read guide →Loves Park
Read guide →Machesney Park
Read guide →Roselle Building Permit Guide
Read guide →Round Lake Beach Building Permit Guide
Read guide →Round Lake Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Roscoe permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.