Inside Roselle, building permits come from the Building Division of the Development & Engineering Services Department at Village Hall, 31 S. Prospect Street (630-671-2821), headed by Kristin L. Mehl, P.E., CFM, Director of Development & Engineering Services. Applications are filed, paid and tracked in Cloudpermit, and review takes up to 7 to 10 business days. Common jobs carry flat fees, such as $75 for a fence and $125 for a patio, and every contractor registers with the village each year.
What requires a building permit in Roselle?
The village says a permit is needed for many home improvements, naming bathroom and kitchen remodels, electrical and plumbing work, water heater replacement, roof replacement, HVAC work and pergolas, and it publishes a handout for each of the common projects below. Fence permits cover every new, enlarged, altered or replaced fence, and the driveway and sidewalk handouts require a permit to install, replace or repair a driveway, apron, curb and gutter, culvert, public sidewalk or private service walk.
Permit needed
- Additions, screened porches and three-season rooms
- Attached and detached garages
- Decks, concrete patios and brick paver patios
- Fences, sheds and stoops or stairs
- Above-ground and in-ground pools
- Central air conditioning and other HVAC work
- Rooftop solar panels
- Driveways, aprons, culverts and sidewalks
- Sanitary, storm and water services, including dry wells and lot grading
- Demolition and commercial tents
No permit, per village pages
- Windows and doors replaced with the same size
- Siding
- Gutters
- Wading pools less than 2 feet deep
Plats of survey are the owner’s job: the village neither draws them nor keeps copies, so an owner who cannot find one needs a surveyor.
What Roselle decides and what the state holds
The Village Board sets Roselle’s codes. At its September 22, 2025 meeting it adopted the 2024 International Code Council standards, and the village’s November 2025 handouts list the 2024 International Building, Existing Building, Residential, Mechanical, Fuel Gas, Fire, Energy Conservation, Property Maintenance and Swimming Pool and Spa codes, the 2023 National Electrical Code, NFPA 101 (2024) and the Illinois plumbing and accessibility codes. The village lists what changed with that update: sprinklers in every new house, insulated bathroom fan ducts across an attic, removal of abandoned wiring and heat detectors in new attached garages. Plumbing is held to the state plumbing code and must be done by a state-licensed plumber, and roofers need the state roofing license, which the village checks at registration.
Roselle building department: who handles permitting
The Development & Engineering Services Department covers building permits and safety, planning, code enforcement, economic development, capital projects and engineering. Its Building Division runs each permit from application through review, approval and inspection, with three part-time inspectors and a contract health inspector; the Village Engineer reviews grading, utility and as-built drawings, and the Fire Department’s Fire Prevention Bureau (630-980-2043) sets sprinkler and alarm requirements. Roselle lies in DuPage County with a part in Cook County. Unincorporated land next to it, such as the Countryside and Medinah areas of Bloomingdale Township, is permitted by DuPage County Building and Zoning (630-407-6700), and unincorporated parts of Schaumburg Township by Cook County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Development & Engineering Services, Village Hall, 31 S. Prospect Street, Roselle, IL 60172 |
| Phone and fax | 630-671-2821; fax 630-980-0824 (one village page prints 630-980-2821; the permit pages and forms use 630-671-2821) |
| buildingdepartment@roselle.il.us | |
| Hours | Monday, Tuesday, Thursday and Friday 8:30 a.m. to 5 p.m.; Wednesday 8:30 a.m. to 1 p.m. |
| Department head | Kristin L. Mehl, P.E., CFM, Director of Development & Engineering Services |
| Portal | Cloudpermit (permits, contractor registration, inspections, business licenses) |
| Village Hall main line | 630-980-2000 |
Roselle permit types
Every application starts with a Cloudpermit account; the portal asks for the documents that match the chosen permit type, and electronic copies are preferred. The village’s own table sets the baseline: exterior work such as a fence, deck or shed needs a current plat of survey with the improvement drawn on it; new construction, additions, remodels, fire sprinklers and fire alarms need two paper sets and one digital set of plans; and any construction valued over $10,000 needs an architect’s seal.
Residential permits
- Additions and porches. A building permit application listing every contractor, a current plat of survey, one set of drawings stamped by an Illinois-registered design professional and a grading plan where the size or location calls for one. The addition must meet the zoning ordinance’s height, setback and lot coverage rules for the house.
- Sprinklers. A house without sprinklers needs them in an addition of 750 square feet or larger under the 2025 code update (the Fire Department’s page words it as more than 750 square feet); a house that already has sprinklers needs them in an addition of any size.
- Sheds and garages. One shed per lot, up to 15 feet tall and 120 square feet, in the rear or interior side yard, 3 feet from the rear line and 5 feet from the side line, anchored to a slab or the ground, and never on a lot without a house. Detached garages may reach 15 feet and 800 square feet, and a lot may have only one garage.
- Decks and patios. Decks go in the rear yard only, on 42-inch frost footings, designed for a 40-pound live load, with 36-inch guards once the deck is 30 inches above grade. Detached decks sit 3 feet from the rear line and 5 feet from the side line.
- Fences. Fences sit entirely on the owner’s land, never on the line, with posts 6 inches inside it and 42 inches deep, the good side out and the bottom 3 inches above grade. Decorative fences must be half open (5 feet in side and rear yards, 4 feet in front); privacy fences reach 6 feet, or 8 feet as a deck screen.
- Pools. Pools sit 5 feet from side lines and 3 feet from the rear line, outside easements, with a 48-inch barrier or 48-inch pool walls and locked or removed steps.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial plans follow the same plan-set and seal rules. New commercial buildings and additions of any size need sprinklers, an addition of 50% or more of the existing floor area brings sprinklers into the whole building, and a new tenant in a multi-tenant building must be tied into the existing fire alarm panel. Commercial driveways and commercial tents have their own handouts, a commercial or industrial demolition needs a report showing any remediation is complete, and business licenses are also issued through Cloudpermit.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The Zoning Ordinance of 2023 (adopted February 27, 2023) sets setbacks and lot coverage. Special uses, planned unit developments, rezoning and subdivisions go to the Planning and Zoning Commission, which meets on the first Tuesday of the month and recommends to the Village Board. A zoning verification letter is requested through the village’s online FOIA portal.
- Other agencies’ right-of-way. Driveway, curb or culvert work in a DuPage County, Cook County or IDOT right-of-way needs that agency’s permit before the village will issue its own; utility work in Roselle’s right-of-way needs a village utility permit, reviewed in 5 to 7 business days.
- Stormwater and floodplain. Roselle partners with DuPage County on stormwater management, and the storm sewer and post-construction best-management-practice handouts apply to grading and drainage work. FEMA’s current flood maps for Roselle took effect August 1, 2019.
- Sewer and water. Only property inside the village may connect; owners in the unincorporated areas must petition to annex first, which the village says usually takes three or four months.
Roselle permit costs and fees
The village’s project handouts, dated November 2025, print flat fees for the jobs below. For additions, garages, in-ground pools, new homes and commercial work the fee depends on the improvement, the size of the area and the number of inspections, and the department gives the applicant the cost before the permit issues. Fees and contractor registration can be paid online in Cloudpermit, which adds 2% for online payment.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Fence (new, enlarged, altered or replaced) | $75 |
| Shed | $75, plus a possible $50 engineering fee |
| Concrete or brick paver patio | $125 |
| Above-ground pool | $100 (fences, patios or decks billed separately) |
| Rooftop solar panels | $200 |
| Driveway removed and replaced at the same size | $75 |
| Driveway widened or relocated | $125 |
| Culvert replacement or ditch grading | $175 |
| Contractor registration (yearly) | $75; plumbers and alarm installers pay no fee |
| Additions, garages, in-ground pools, new homes, commercial | Set from the improvement and inspections; quoted before issuance |
| Online payment in Cloudpermit | 2% added |
Worked example: replacing a driveway at the same size and adding a new fence costs $75 plus $75, or $150 in permit fees; paid online in Cloudpermit it comes to $153 with the 2% charge. The deck handout prints the same $125 figure under the heading of patio permits, so ask the department to confirm the deck fee when it quotes the job. Driveway permits can add inspection fees, and the handouts say additional fees may apply.
Trade permits and who may pull them
Roselle requires every contractor working in the village to register each year in Cloudpermit before any work starts, and a permit is not released until every listed contractor holds a current registration. The requirements differ by trade:
- General contractors. The village application, the $75 fee, a $25,000 surety bond and a certificate of insurance naming the Village of Roselle, with $1,000,000 of liability per occurrence and workers’ compensation from an insurer rated at least B+/VII.
- Electricians. The application, $75, a copy of the electrical license, a $10,000 bond and the same insurance.
- Roofers. The application, $75, a copy of the state roofing license, a $10,000 bond and insurance.
- Plumbers and alarm installers. The application and a State of Illinois license, with no fee.
- Every other contractor. The application, $75, a $10,000 bond and insurance.
The village’s home improvement page sums it up: plumbing, electrical and roofing contractors need a state or local license, and the general contractor and every subcontractor need a village license. An owner does not need a contractor’s license to demolish, rehabilitate, alter or repair their own home or property, but must still take out the permit. Before a demolition, the village electrical inspector must approve the electric disconnection, and a gas line to a pool heater is inspected before its trench is closed.
Rather not deal with the building department?
Get a free quote →How to apply for a Roselle building permit
Each handout on the Building Permits page lists the zoning limits, construction rules and fee for that job.
Get any Planning and Zoning Commission approval, and any county or IDOT right-of-way permit, before applying.
Every contractor registers in Cloudpermit with its bond, insurance and license before the permit can be released.
Create an account, choose the permit type and upload the plat of survey, plans, sealed drawings or specifications it asks for.
Review takes up to 7 to 10 business days; changes to an existing permit are also requested in Cloudpermit.
Pay the quoted fee, then display the permit card on site; no work may start before the permit is issued and paid.
Review, corrections and what causes delay
A permit cannot be released while a listed contractor is unregistered, and an application without a current plat of survey or the required stamp or architect’s seal is incomplete. The additions handout asks owners who are unsure whether an addition triggers sprinklers to call the Fire Prevention Bureau first. Work in someone else’s right-of-way waits for that agency’s permit, and as-built drawings must be approved before bonds or a final certificate of occupancy are released.
Inspections and certificates in Roselle
Inspections are scheduled or cancelled in Cloudpermit at least 24 hours in advance, or by calling 630-671-2821. The required inspections are listed on the issued permit. Handouts name the common stages: a pre-pour inspection for a shed slab and for every driveway and apron, a culvert inspection where one applies, and a final for fences, sheds and other structures. On engineered jobs, as-built record drawings, sized to 11 by 17 inches and sealed by an Illinois professional civil engineer where applicable, are due in Cloudpermit within 30 days of completion; the Village Engineer must approve them before project bonds, the final certificate of occupancy or public improvements are released.
Driveway permit conditions keep materials and debris out of the street, require silt fence before work starts and call for disturbed parkway to be restored with topsoil, salt-tolerant seed and an erosion blanket.
Illinois building code in Roselle
Roselle enforces the 2024 International Code Council codes adopted by the Village Board on September 22, 2025, with the local sprinkler and safety amendments described above. FEMA’s Community Status Book lists the Village of Roselle (community 170216, DuPage and Cook counties) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Roselle building permit FAQs
Do I need a permit to replace windows or siding in Roselle?
No, not for windows and doors replaced at the same size, siding or gutters. A roof replacement does need a permit.
How much is a fence permit in Roselle?
$75 for any new, enlarged, altered or replaced fence, with a final inspection.
Can a homeowner pull a permit without a contractor’s license?
Yes, to demolish, rehabilitate, alter or repair their own home or property; any contractor they hire must be registered with the village.
What does contractor registration cost?
$75 a year for most trades, with bonds of $10,000 or $25,000; plumbers and alarm installers register with a state license and no fee.
How long does permit review take?
Up to 7 to 10 business days for a building permit, and 5 to 7 business days for a utility permit in the right-of-way.
Does my addition need fire sprinklers?
Yes if the house already has sprinklers, or if the addition reaches the 750-square-foot threshold; the Fire Prevention Bureau at 630-980-2043 can confirm.
How big can a shed be?
Up to 120 square feet and 15 feet tall, one per lot, in the rear or interior side yard.
Roselle permit search and official resources
Permit and inspection status can be checked in Cloudpermit by the applicant. Copies of village records and zoning verification letters are requested through the village’s online FOIA portal, linked from the Village Code and Building & Zoning pages; the Code of Ordinances, including the Zoning Ordinance, is on Municode and in print at Village Hall and the Roselle Public Library.
Inspections are where schedules slip.
Get a free quote →- Roselle building permits and project handouts
- Development & Engineering Services
- Building & Zoning
- Contractor registration
- Contractor registration application and requirements
- Starting a home improvement project
- Village Code and the 2025 building code update
- Fire sprinkler requirements
- Additions handout
- Fences handout
- Sheds handout
- Decks handout
- Pools handout
- Residential driveways handout
- Demolition handout
- As-built requirements
- Utility permits
- Stormwater management
- Floodplain re-mapping information
- Planning and Zoning Commission
- Sewer and water connection and annexation FAQ
- DuPage County Building and Zoning (unincorporated areas)
- FEMA Community Status Book, Illinois
Simplify Roselle permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Roselle sooner?
Let Alliance prepare, file, and track your Roselle permits while your crew stays on the job.
More Illinois permitting guides
DuPage County
Read guide →Villa Park
Read guide →Warrenville
Read guide →Round Lake Beach Building Permit Guide
Read guide →Sangamon County Building Permit Guide
Read guide →Schaumburg Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Roselle permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.