In the City of Loves Park, building permits come from the Building Department in the Community Development Department at City Hall, 100 Heart Boulevard (815-654-5033, weekdays 8 a.m. to 5 p.m.). Residential and commercial applications can be filed online through Citizenserve or faxed, mailed or handed in, and fees are paid at the Clerk’s Office before work starts. Every permit carries a $40 processing fee, and the building fee itself is set from the value of the work.
What requires a building permit in Loves Park?
The city’s rule of thumb is that anything needing an inspection needs a permit: all new buildings, structural changes and remodeling projects, plus electrical, mechanical and plumbing work. The Building Department issues permits for the new construction, remodeling and demolition of every structure in the city, and its fee schedule shows the residential jobs it prices most often.
Permit needed
- New homes, additions and finished basements
- Garages, carports and decks or porches
- Storage sheds over 120 sq ft
- Re-roofing and siding
- Fences ($20 fence permit)
- Electrical, plumbing and HVAC work, including water heaters and radon systems
- Demolition and permanent signs
Smaller jobs
- Re-roof: flat $40 valuation figure
- Siding: flat $20 valuation figure
- Sheds of 120 sq ft or less are not priced in the schedule; call the department
Starting without a permit costs more: the inspection policy says work begun without a permit is charged a double fee, and the city’s FAQ warns that fees may be doubled. If you are not sure whether a job needs a permit, the department asks you to call 815-654-5033.
What Loves Park decides and what the state holds
The city adopts and amends its own codes. Since April 1, 2025 it has enforced the 2021 International Code Council series, including the building, residential, existing building, mechanical, fuel gas, property maintenance, swimming pool and spa, fire, performance and wildland-urban interface codes, along with the 2020 National Electrical Code and the 2021 NFPA 101 Life Safety Code, each with local amendments. Plumbing follows the 2014 Illinois Plumbing Code with chapter 11 of the 2021 International Plumbing Code for storm drainage, and the 2021 International Energy Conservation Code is listed as the state requires it.
Loves Park building department: who handles permitting
The Building Department issues building, electrical, plumbing and mechanical permits and has its own building, electrical and plumbing/HVAC inspectors. The Building Official is Juan Terre. Zoning is a separate office in the same department: the Zoning Officer enforces the zoning ordinance and supports the Zoning Board of Appeals and the City Council.
Short on time to read all of this?
Get a free quote →Since October 18, 2017 the Loves Park Building Department has also done the building inspections for the Village of Machesney Park, but Machesney Park issues its own permits at its Village Hall (see the Machesney Park guide). Rockford and unincorporated Winnebago County are separate authorities (see the Rockford and Winnebago County guides).
| Detail | Information |
|---|---|
| Office | Building Department, Community Development, City Hall, 100 Heart Boulevard, Loves Park, IL 61111 |
| Phone | 815-654-5033 (permits, inspections, zoning); fax 815-654-5004 |
| Hours | Office Monday to Friday, 8 a.m. to 5 p.m.; inspections 9 a.m. to 4 p.m. |
| Applications | Citizenserve online, or fax, mail or counter; pay at the Clerk’s Office |
Loves Park permit types
The Building Department posts a 1 & 2 family dwelling permit application that combines building, electrical, mechanical and plumbing sections, a commercial building permit, a plan review application, an available short-circuit current form for electrical services and a fence permit. A zoning clearance form goes with the application when the work needs one.
Residential permits
- Houses and duplexes. The combined application records living, garage, basement and deck areas, the trades and the number of plumbing fixtures. A plumbing permit is not issued until any water main tap-in fee has been paid, and the office tallies water connection and school district exaction fees with the permit.
- Roofs and siding. Re-roofing and siding are permitted at low flat valuation figures, and the application asks for the roofing contractor’s license number.
- Fences. $20. Fences may be no taller than 4 feet in a front yard and 6 feet in side and rear yards, must show the finished side outward, may not block drainage easements or the corner vision triangle, and may not use barbed wire.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
All new commercial, industrial and multi-family buildings, and any remodel or change of use of one, need an architectural plan review before a permit. Plans covering every trade must be signed and sealed by an Illinois licensed architect or engineer and submitted electronically, with a site plan showing setbacks, landscaping and parking under the zoning ordinance. The review fee is separate from the permit fees, and the city asks for at least two weeks for the first review. Food businesses must send their plans to the Winnebago County Health Department themselves.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning clearance. Zoning approval must be finished before plan review starts.
- Stormwater. Commercial drainage plans and detention calculations go to the Director of Public Works under the city’s storm water detention chapter, one paper and one electronic copy.
- Variances and special uses. Decided after a Zoning Board of Appeals hearing, with the City Council making the final decision; neighbors are notified by letter.
- Landscaping and parking. Required improvements must be finished before final inspections, or secured with a bond, cash deposit, certified check or signed contract.
Loves Park permit costs and fees
The building permit fee schedule was approved by the City Council on February 12, 2018 and took effect on February 15, 2018. The Building Official sets the project value from the applicant’s estimate, an architect’s or engineer’s certificate, an owner’s affidavit or the square-foot figures below, and the fee comes from the valuation table, which excludes the electrical, plumbing and HVAC cost.
| Item | Fee |
|---|---|
| Processing fee, each permit (or trades taken out together) | $40 |
| Valuation: living space, basements, additions, commercial | $60 per sq ft |
| Valuation: garages, sheds over 120 sq ft, decks and porches | $18 per sq ft |
| Project value $0 to $2,000 | $40 |
| $2,001 to $9,999 | $50 to $65 in $2,000 steps |
| $10,000 to $20,000 | $70 to $90 in $2,000 steps |
| Over $20,000 | “$5.00 per each $1,000” |
| Extra building inspections (three included) | $50 each |
| Demolition: house / commercial | $35 / $75 to $125 |
| Permit extension, 180 days | $30 per trade |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Electrical service up to 200 amps | $30 |
| House wiring up to 1,200 / 1,600 / 2,200 sq ft | $82 / $98 / $110, plus the service |
| Solar or wind, up to 25 panels | $50 |
| Plumbing fixture opening: residential / commercial | $15 / $20 each |
| Radon system | $50 |
| Furnace up to 200,000 BTU / air conditioner up to 240,000 BTU | $35 / $30 |
| Gas piping | $20 plus $5 per outlet |
Worked example: a 300-square-foot deck is valued at $18 a square foot, or $5,400, which falls in the $4,000 to $5,999 band of the valuation table, so the building fee is $55; with the $40 processing fee the permit costs $95. A new bathroom with three plumbing fixtures adds a plumbing permit of $45 plus its own processing fee.
Plan review and other fees
The 2018 schedule sets commercial plan review at a $500 deposit for the first five hours and $100 an hour after that, but the plan review packet the city posted in November 2025 asks for a $600 application fee covering five hours and $125 an hour beyond them; use the newer packet. Zoning fees are separate: a variation is $150, a special use $200 to $400 depending on lot size, and a map amendment $400 to $700 (up to $1,200 for large sites).
Trade permits and who may pull them
Electrical, plumbing and mechanical permits come from the same Building Department, on the combined residential application or the commercial forms, each with its own $40 processing fee. Each trade permit includes a set number of inspections: two for electrical (three when a service is installed) and four for plumbing (sewer and water, underground rough-in, above-ground rough-in and final); any more cost $50 each.
- Plumbing: the application asks for the plumbing contractor’s Illinois state license number; plumbers are licensed by the Illinois Department of Public Health. Water main tap-in fees must be paid first.
- Roofing: the application asks for the roofing contractor’s license number.
- Alarm systems: the installer’s state license number goes on the electrical section.
- Design professionals: commercial, industrial, institutional and residential buildings other than one- and two-family homes under three stories need plans stamped by a licensed architect or engineer.
Changing a contractor after the permit is issued costs $40 per trade.
Rather not deal with the building department?
Get a free quote →How to apply for a Loves Park building permit
Loves Park permits only inside its limits; Machesney Park, Rockford and county land file elsewhere.
Look up the district on the zoning map and get a zoning clearance where one is needed.
Use the residential or commercial form, or Citizenserve; commercial jobs add the plan review application and sealed plans.
File online, or fax, mail or hand in the forms at Community Development.
Fees, including tap-in and processing fees, are paid before work starts.
Post it on the front of the job and request each inspection when ready.
Review, corrections and what causes delay
Commercial plan review takes at least two weeks for the first round, and resubmittals add time; any change made after approval must be resubmitted, sealed and approved before it is built. Reviews are held up most often by missing zoning approval, missing drainage plans and detention calculations, and unpaid tap-in fees. Permits are valid for one year, and a 180-day extension can be requested before expiry for $30 per trade under the fee schedule (the FAQ gives $25); after that the full fee is charged again. The FAQ adds that a permit is void if no significant work is done within six months.
Inspections and certificates in Loves Park
Call 815-654-5033 to request an inspection, with the permit number, address, subdivision lot number and the contractor’s name. Inspectors work in the field from 9 a.m. to 4 p.m. on weekdays and make inspections within three days of the request, usually the same or the next day; a specific time has to be arranged directly with the inspector during office hours. The permit must be posted on the front of the job site.
Each building permit includes three inspections, footing, rough-in and final. Structural rough-in and final inspections are not done until all other trades are complete, which the permit holder confirms from the inspection cards left on site. Jobs not ready when the inspector arrives can be charged a re-inspection fee; the inspection policy gives $25, while the 2018 fee schedule sets additional inspections at $50. For apartment, commercial and industrial buildings, final inspections for occupancy wait until the required landscaping and parking are finished or secured.
Illinois building code in Loves Park
Loves Park enforces the 2021 International codes, the 2020 National Electrical Code and the 2014 Illinois Plumbing Code with local amendments, effective April 1, 2025; the November 2025 plan review packet still lists the 2014 electrical code, so confirm the edition with the department. FEMA’s Community Status Book lists the City of Loves Park (community 170722, under both Boone and Winnebago counties) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated October 17, 1978 and the current map dated February 17, 2016; it has no Community Rating System class. The fence application asks whether the lot is in the floodplain.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Loves Park building permit FAQs
How much does a building permit cost in Loves Park?
The fee is set from the project value (for example $60 a square foot for living space) using the 2018 table, plus a $40 processing fee on every permit. Call 815-654-5033 for a quote.
Do I need a permit to re-roof or replace siding?
Yes. Both are permitted, at flat valuation figures of $40 for a re-roof and $20 for siding, plus the processing fee.
Can I apply online?
Yes, through Citizenserve. Paper forms can also be faxed, mailed or handed in at Community Development, and fees are paid at the Clerk’s Office.
How quickly are inspections done?
Within three days of the request, usually the same or the next day, between 9 a.m. and 4 p.m. on weekdays.
Does Loves Park inspect Machesney Park projects?
Yes. Loves Park inspectors have done Machesney Park’s building inspections since October 2017, but the permits come from Machesney Park.
How much is a fence permit?
$20, with fences limited to 4 feet in front yards and 6 feet in side and rear yards.
How long is a permit valid?
One year from issue, with one 180-day extension available before it expires.
What does commercial plan review cost?
A $600 application fee covering five hours of review, then $125 an hour, separate from the permit fees, under the November 2025 packet.
Loves Park permit records and official resources
Permit and inspection records are held by the Community Development Department. Records requests must be made in writing, by mail, delivery, fax or email, to the city’s FOIA Officer at 100 Heart Boulevard (815-654-5034).
Inspections are where schedules slip.
Get a free quote →- Loves Park Building Department (codes, forms)
- Building permit fees, effective February 15, 2018
- 1 & 2 family dwelling permit application
- Plan review requirements (November 2025)
- Inspection request policy
- Building permit FAQs
- Fence permit application
- Zoning Department
- Zoning FAQs
- Zoning and planning fees
- Freedom of Information requests
- FEMA Community Status Book, Illinois
- Illinois Department of Public Health plumbing
Simplify Loves Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Loves Park sooner?
Let Alliance prepare, file, and track your Loves Park permits while your crew stays on the job.
More Illinois permitting guides
Winnebago County
Read guide →Machesney Park
Read guide →Rockford
Read guide →Lyons Building Permit Guide
Read guide →Macomb Building Permit Guide
Read guide →Macon County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Loves Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.