In the Village of Round Lake, building permits are issued by the village’s Community Development Department, 442 N. Cedar Lake Road (847-546-0963). Applications can be filed in person, by mail or by e-mail, and the village asks you to allow 5 to 10 business days for review, more if an outside agency must look at the plans. Most projects need a copy of the plat of survey with the work drawn to scale, homes in a homeowners association need the association’s approval letter first, and approved permits can be paid online by invoice number. The village’s project handouts price a residential deck at $150, a fence at $90 and a roof or siding job at $65. Round Lake is a separate village from Round Lake Beach.
What requires a building permit in Round Lake?
Round Lake publishes a long list of projects that need a permit, a list of repairs that need one once they pass a size threshold, and a short list of work that needs no permit at all.
Structures and site work
- Additions and alterations of structural systems
- Garages, sheds, gazebos and pergolas
- Decks, patios, concrete work, sidewalks and driveways
- Fences, roofing and siding
- Window modifications
- Swimming pools (including temporary pools) and spas or hot tubs
- Demolition
- Permanent and temporary signs
- Parkway tree planting and tree removal
Systems and interiors
- Basement remodels
- Electrical work and solar panels
- Plumbing and water heater replacement
- Furnaces and central air conditioning
- Fireplaces
- Radon mitigation systems
- Lawn irrigation systems and secondary water meters
- Sump pump and gutter discharge
When a repair needs a permit
| Repair | Permit needed when |
|---|---|
| Fence | Replacing more than 3 post holes or 2 sections |
| Driveway | Replacing more than 10% |
| Roof | Replacing more than 100 sq ft (4 bundles) |
| Parking lot | Replacing more than 250 sq ft |
| Siding | Replacing more than 100 sq ft |
| Deck (boards, railings and framing) | Repairs of more than 50% of the original size |
No permit needed
- Cabinets and countertops
- Flooring and painting
- Low-voltage and Wi-Fi security systems
- Retaining walls under 4 feet high
- Swimming pools 23 inches deep or less
Emergency repairs
- Make the repair, then apply for the building permit on the first business day afterward
Short on time to read all of this?
Get a free quote →What Round Lake decides and what the state holds
Round Lake writes its own permit rules, the repair thresholds above among them, and sets its own building codes and sign code; its Community Development Department described adopting the full 2018 International Code Council code set as part of the work that earned it the 2019 Illinois Code Enforcement Agency of the Year award. The state’s part is the Illinois Plumbing Code, with plumbers licensed by the Department of Public Health, the Illinois energy and accessibility codes, and the state licensing of roofing contractors by the Department of Financial and Professional Regulation.
Round Lake building department: who handles permitting
The Village of Round Lake issues building permits for property inside its limits through its Community Development Department, headed by Director of Community Development Katie Parkhurst. The department handles all building, zoning and planning matters for the village and also runs the village’s rental registration and inspection program, its foreclosure registration program and its sign code. Round Lake Beach is a separate village with its own permit office, and unincorporated land nearby is permitted by Lake County, so confirm which government the address is in before you file.
| Detail | Information |
|---|---|
| Office | Community Development Department, 442 N. Cedar Lake Road, Round Lake, IL 60073 |
| Phone | 847-546-0963; fax 847-546-1872 |
| Village hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Filing | In person, by mail, or by e-mail to the address on the village’s Building Permits page |
| Village Hall | Temporarily operating out of the Annex, per the village website banner |
| Payment | Online under Online Payments > Building Permits, by invoice number (service fee added) |
Because Village Hall has moved to temporary quarters, call 847-546-0963 to confirm where to drop off paper applications before you go.
Round Lake permit types
Round Lake treats every listed project as a building permit filed with the same department; what changes from job to job is the paperwork that goes with it. Two items are needed on almost every application:
- A plat of survey with the work drawn to scale. Most projects require a copy of your property plat of survey, with the proposed improvement drawn on it to scale.
- Contractor licenses. Copies of the electrical, plumbing and roofing licenses of any contractor working on the property.
Residential permits
Typical house permits are decks, patios, fences, sheds, garages, roofs, siding, furnaces, central air, water heaters, basement remodels, pools and hot tubs. A few rules to plan around:
- Homeowners associations. If the home is in an HOA, get a project approval letter from the association first; the village will not issue the permit without it.
- Pools. Permanent and temporary swimming pools need a permit unless the pool is 23 inches deep or less.
- Repairs. Small fence, driveway, roof, siding and deck repairs below the thresholds need no permit; above them they do.
- Retaining walls. Walls under 4 feet high are exempt.
- Radon and drainage. Radon mitigation systems and sump or gutter discharge changes are on the permit list.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial property uses the same department and list. Parking lot repairs need a permit once more than 250 square feet is replaced, and both permanent and temporary signs need permits under the village’s sign code. Projects that must go to an outside agency for review take longer than the usual 5 to 10 business days. Residential rental property falls under the village’s rental registration and inspection program.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- HOA approval letter for homes in an association.
- Plat of survey showing the project drawn to scale.
- Contractor licenses for the electrical, plumbing and roofing trades.
- Outside agency review where the project needs it, which extends the review period.
- Parkway trees. Planting a tree in the parkway or removing a tree needs a village permit.
Round Lake permit costs and fees
Round Lake prints its permit fees on the project requirement handouts linked from the Building Permits page; each handout adds that more fees may apply under Section 20.56.010 of the Municipal Code, which sets the fees for work the handouts do not price, such as basement finishes and electrical work. Several handouts carry older update dates (2019 to 2023).
Rather talk it over?
Call 1-855-478-4290 →| Project | Residential | Commercial |
|---|---|---|
| Deck (repairs of more than 50% of the original size: $90) | $150 | $165 |
| Fence, up to 300 linear feet | $90 (each added foot $0.20) | $105 |
| Pre-built shed / shed built on site | $90 / $140 | $105 / $155 |
| Garage, gazebo, pergola or other accessory structure | $90 | $105 |
| Driveway; patio; sidewalk | $90 each | $105 each |
| Window modification | $90 | $105 |
| Roofing; siding | $65 each | $80 each |
| Furnace; central air unit; water heater | $50 each | $65 each |
| Fireplace / masonry fireplace | $100 / $125 | $115 / $140 |
| Lawn irrigation system (plus a $250 refundable cash bond) | $100 | $115 |
| Spa or hot tub | $140 | $155 |
| Swimming pool: above ground / in ground (more if plumbing review is needed) | $140 / $245 | Not listed separately |
| Radon mitigation system | $65 | $80 |
| Basement finish (plus a $275 refundable cash bond); electrical work | Municipal Code 20.56.010 | Municipal Code 20.56.010 |
Worked example. A 400-foot residential fence pays $90 for the first 300 feet plus 100 × $0.20 = $20 for the rest: $110.
The village gives you an invoice number when the permit is approved and ready; pay online under Online Payments > Building Permits by that number (a non-refundable service fee is added). All legal forms of payment are accepted except American Express. Demolition contractors post a cash building permit bond; the contractor handout writes the amount out as $250 in words but prints $275 in figures, so ask the department which applies.
Trade permits and who may pull them
Round Lake does not require contractors to register, but permits are not released until every contractor on the job has supplied its paperwork to the Permit Technician. Applications may be filed by the property owner or by the owner’s authorized agent, such as the design professional or the contractor doing the work, and the person the permit is issued to is legally responsible for the construction, the inspections and finishing the work.
- Plumbing. Plumbing contractors supply copies of their state 055 and 058 licenses and a letter of intent. The water heater handout notes that Illinois plumbing law requires a state-licensed plumber for the work, and plumbers are licensed by the Illinois Department of Public Health.
- Roofing. Roofers supply a copy of their state roofing license and driver’s license; a roof repair needs a permit once it passes 100 square feet, about 4 bundles.
- Electrical. Electrical contractors supply a copy of their electrical license. Low-voltage and Wi-Fi security systems are exempt.
- Irrigation, radon and fire alarms. Lawn irrigation needs a state irrigation registration card or plumbing license, radon mitigation contractors need a state radon license, and fire alarm companies supply their state license.
Rather not deal with the building department?
Get a free quote →How to apply for a Round Lake building permit
Make sure the address is in the Village of Round Lake, not Round Lake Beach or unincorporated Lake County.
See whether the project is on the permit list, falls under a repair threshold or is exempt.
If you have a homeowners association, obtain its project approval letter.
Draw the work to scale and gather your contractors’ electrical, plumbing and roofing licenses.
File in person, by mail or by e-mail to the address on the Building Permits page.
Allow 5 to 10 business days, longer with outside agency review.
Once the approved permit is invoiced, pay online by invoice number (a service fee applies); American Express is not accepted.
Review, corrections and what causes delay
The village’s standard is 5 to 10 business days. Applications slow down when a required piece is missing, and on Round Lake’s own rules the likely gaps are an HOA approval letter for a home in an association, a plat of survey without the project drawn to scale, or missing copies of contractor licenses. Anything that must also be reviewed by an outside agency takes longer than the standard window. After an emergency repair, the permit application is due on the first business day after the work. The Building Permits page accepts e-mailed applications, while an answer on the village’s FAQ page says electronic applications cannot be accepted, so call before e-mailing a large set of plans.
Inspections and certificates in Round Lake
Each project handout lists the inspections for that job, and inspection results are e-mailed to the applicant, so the application must give a valid e-mail address. Typical sequences from the handouts:
- Fence: post hole, with the property iron markers exposed, then final.
- Deck: starts with the ledger board and pier holes; utility lines must be at least 10 feet above and 3 feet from the edge of the deck, and the deck may not cover a basement egress window.
- Roof: ice and water shield, then final. Siding: vapor barrier, then final.
- Driveway, patio and sidewalk: base, then final.
- Pool: location, pool dig, footing, bonding, electrical and final.
Want this handled start to finish?
Get a free quote →Plumbing inspections must be scheduled by 2:30 p.m. the day before and are booked between 8 a.m. and noon or 1 and 4 p.m. The application form states that a permit expires in six months. Residential rental property is also inspected under the village’s rental registration and inspection program, separate from construction permits.
Illinois building code in Round Lake
Round Lake’s Community Development Department reported adopting all of the 2018 International Code Council building codes as part of its 2019 work, and the current project handouts still cite the 2018 International Residential and Building Codes, the 2018 Swimming Pool and Spa Code and the 2017 National Electrical Code, which the electrical handout says the village adopted with amendments. Handouts also apply the Illinois energy code; the window handout asks for a U-factor of 0.32 or lower. FEMA’s Community Status Book lists the Village of Round Lake (community 170388, Lake County) as participating in the National Flood Insurance Program, with a current flood map dated February 17, 2016; the village is not in the Community Rating System. Round Lake Beach has its own FEMA listing.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Round Lake building permit FAQs
How much is a building permit in Round Lake?
The village handouts list $150 for a residential deck, $90 for a fence up to 300 feet, a shed, driveway or patio, and $65 for a roof or siding job.
Do I need a permit to repair my roof in Round Lake?
Only if you replace more than 100 square feet (about 4 bundles); a full reroof needs a permit.
How long does a Round Lake permit take?
Allow 5 to 10 business days; projects that need an outside agency’s review take longer.
How big can a shed be?
Up to 120 square feet, at least 10 feet from the rear property line and from the house, and never in the front yard.
Do contractors register with Round Lake?
No, but the village needs copies of plumbing, roofing and electrical licenses before it releases the permit.
Do I need a permit for a small pool?
Not for a pool 23 inches deep or less; deeper pools, including temporary ones, need a permit.
How long is a Round Lake permit good for?
The application form says a permit expires in six months.
Is Round Lake the same as Round Lake Beach?
No. They are separate villages with separate permit offices.
Inspections are where schedules slip.
Get a free quote →Round Lake permit search and official resources
For the status of a permit, call Community Development at 847-546-0963 with the address. The invoice number you receive on approval is also the reference for paying online, and the village may hold a copy of your plat of survey in its address files.
- Round Lake building permits and project handouts
- Round Lake Community Development
- Community Development FAQs
- Application for building permit
- Contractor requirements
- Deck requirements
- Fence requirements
- Shed requirements
- Swimming pool requirements
- Basement finish requirements
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health – Plumbing
Simplify Round Lake permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Round Lake sooner?
Let Alliance prepare, file, and track your Round Lake permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Vernon Hills
Read guide →Wauconda
Read guide →Saline County Building Permit Guide
Read guide →Sangamon County Building Permit Guide
Read guide →Schaumburg Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Round Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.