In the Village of Lincolnwood, building permits are issued by the Community Development Department at Village Hall, 6900 Lincoln Avenue (847-673-7402), and applications, payments, inspection requests and permit printing all run through the village’s LAMA portal. Plans are reviewed within ten business days, smaller jobs in 48 hours or over the counter, and no permit is issued until every contractor holds a village contractor license, which costs $100 for most trades.
What requires a building permit in Lincolnwood?
Lincolnwood publishes separate lists for homes and for commercial property, and both warn that not everything needing a permit is listed. The residential list is broad: it includes drywall, insulation and any wall change, new recessed or ceiling lights, smoke and carbon monoxide alarms, low-voltage wiring and radon systems.
Permit required (homes)
- New houses, two-flats, duplexes and townhomes; additions, porches, sunrooms, carports and attached garages
- Basement, kitchen, bathroom and general remodeling, stairs, and cabinetry with a countertop
- Generators, detached garages, sheds, pergolas, gazebos, decks, fences, pool barriers and dog runs; pools over 24 inches deep, spas and hot tubs
- Driveways, aprons, garage or crawl space slabs, patios, fire pits, outdoor kitchens, sidewalks, steps and landings
- Removing a tree over 8 inches in diameter, and regrading any part of a lot
- Furnaces, air conditioners, boilers, water heaters and radiant heat; electrical panels, EV chargers, solar panels
- Drain tile and sump or ejector pits, lawn irrigation, RPZ valves, sewer and cleanout repair, tub-to-shower conversions, water meter upgrades
- Demolition, awnings, board-ups, brick or stone veneer, chimney repair, roofs, gutters, windows, skylights and doors
No permit (homes)
- Brick or stone tuckpointing
- Replacing an existing light fixture
- Replacing a garage door or screen door
- Interior or exterior painting
- Refacing cabinets or resurfacing countertops
- Carpet, hardwood, and tile outside tubs and showers
- Changing ceiling tiles with no electrical or mechanical work
- Standard household appliance replacement
- Minor roof shingle or membrane repairs up to 50 square feet
The commercial list adds tenant finish-outs, mezzanines, racking over 8 feet, loading docks, automotive lifts and paint booths, cell towers, trash enclosures, tents, parking lots and striping, rooftop HVAC units, commercial kitchen hoods and their suppression systems, and alarm systems.
What Lincolnwood decides and what the state holds
Lincolnwood’s adopted code list took effect on November 30, 2025: the 2021 International Building, Existing Building, Residential, Fire, Mechanical, Fuel Gas, Property Maintenance and Swimming Pool and Spa codes as amended, the 2020 National Electrical Code and the 2021 NFPA 101 Life Safety Code. The 2014 Illinois Plumbing Code, the 2024 Illinois Energy Conservation Code and the 2018 Illinois Accessibility Code apply as state codes. Local amendments, contractor rules, site management and tree rules sit in Chapter 14 of the Village Code, and zoning in Chapter 15.
Short on time to read all of this?
Get a free quote →Lincolnwood building department: who handles permitting
The Community Development Department handles building permits, plan review, inspections, contractor licensing and zoning hearings. Building, electrical, plumbing and mechanical work all go on one building permit application, with separate permits only for listed items such as fences, roofs, sheds and signs. Fire sprinkler determinations and sprinkler permits use the Fire Department’s forms. Land outside the village limits falls to the Cook County Department of Building and Zoning.
| Detail | Information |
|---|---|
| Office | Community Development Department, Village Hall, 6900 Lincoln Avenue, Lincolnwood, IL 60712 |
| Phone | 847-673-7402 |
| commdev@lwd.org (the village’s quickest channel) | |
| Hours | Monday to Friday, 8:00 a.m. to 5:00 p.m. |
| Filing and payment | LAMA portal, lincolnwood.onlama.com |
| Inspections | Weekdays, 8:00 a.m. to noon or noon to 4:00 p.m. |
Lincolnwood permit types
The village sorts its handouts by how long review takes. Over-the-counter permits cover furnaces, air conditioners, water heaters, roofs and windows. Quick-turnaround permits, reviewed in about 48 hours, cover flatwork and stormwater, driveways and aprons, fences, gas grills, lawn sprinklers, patios and walks, sewer and water line repairs, sheds, gazebos, pergolas and wood decks. Standard permits, reviewed in 7 to 10 business days, cover additions, basement and kitchen or bath remodels, detached garages, demolition, fireplaces, generators, solar panels, pools, signs, parking lots and tree removal. Those times refer to plan review only; issuing the permit can take longer.
Residential permits
- Additions need a zoning calculation worksheet, a legal plat of survey no more than five years old showing trees by species and trunk size and the ComEd service line, and scaled drawings sealed by an Illinois design professional. An addition must stay 15 feet from accessory structures, accessory structures may cover no more than 30% of the rear yard, and hard surfaces no more than 60% of the lot. Adding plumbing fixtures requires a televised test of the existing sewer service.
- Fences need post holes at least 42 inches deep; chain link must be black, brown or green and no taller than 4 feet, the finished side faces out, and the fence sits 3 inches above grade.
- Roofs: the contractor must notify the village one business day before starting, and the village performs a final inspection.
- Furnaces, air conditioners and water heaters are usually issued in 24 to 48 hours once the application is complete.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Multi-family and commercial buildings, tenant build-outs, outdoor dining, elevators and lifts, kitchen hoods and suppression systems, and site work such as curbs, ramps and parking lots all need permits. The application asks whether the project creates a new use on the property, and a Fire Sprinkler Determination Form decides whether sprinklers are needed; a separate sprinkler permit may follow, depending on how much of the building is remodeled.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning hearings. Special uses, amendments, planned unit developments and subdivisions go to the Plan Commission; variations go to the Zoning Board of Appeals. Each has a non-refundable hearing fee, and some carry a deposit for the village’s costs.
- Trees and grading. Removing a tree over 8 inches in diameter, or regrading any part of a lot, needs its own permit.
- Stormwater. Flatwork permits include the village’s stormwater management handout, and engineering guidelines and standard details apply to site work.
- Digging. Call JULIE at 811 or 800-892-0123 at least 48 hours before you dig.
Lincolnwood permit costs and fees
Building permit fees are set by the village’s Annual Fee Resolution, and the department’s building pages do not reproduce the amounts. The village notes that several building permit fees changed with its 2026 fee schedule and that, since January 1, 2026, every credit or debit card payment carries a 3% fee. For the fee on your project, call Community Development at 847-673-7402. The figures the village does publish are these:
| Item | Fee |
|---|---|
| Village contractor license (most trades) | $100 |
| Plumbing and fire alarm contractor registration | No fee |
| Contractor bond | $10,000 |
| Card payments (from January 1, 2026) | 3% of the transaction |
| Stop work order when someone other than the owner-contractor does the work | $375 fine |
| Plan re-review | Additional charges |
| Zoning Board of Appeals: major variation, residential / non-residential | $250 / $500 |
| Zoning Board of Appeals: minor variation / design standards | $125 / $250 |
| Plan Commission: special use, residential / non-residential | $250 / $500 plus $2,000 deposit |
| Plan Commission: text or map amendment | $500 plus $2,000 deposit |
| Planned unit development, up to 5 acres | $1,250 plus $10,000 deposit |
Rather talk it over?
Call 1-855-478-4290 →Hearing fees are non-refundable. Deposits pay the village’s out-of-pocket hearing costs, and any costs beyond the deposit are billed at the end of the hearing process, payable within 30 days of the invoice. An owner acting as contractor must also carry liability insurance of at least $1,000,000, the amount the Annual Fee Resolution currently sets, for damage to neighboring property. A failed inspection may add a re-inspection fee.
Trade permits and who may pull them
The general contractor submits every licensed contractor’s information. Each contractor registers in the LAMA portal before the permit can issue, and any change of contractor must be reported in writing immediately. Bonds must indemnify the village and the utilities serving it, carry a street address and a number, and be delivered as originals.
| Contractor | What the village requires |
|---|---|
| General, concrete, demolition, excavation, sign | $10,000 bond, $1,000,000 insurance naming the village, $100 license |
| Mechanical | $10,000 bond, $100 license |
| Electrical | $10,000 bond, a current electrical license, $100 license |
| Plumbing | IDPH plumbing contractor registration and plumber’s license with photo ID; no fee |
| Roofing | $10,000 bond, state roofing license, $100 license |
| Sewer / irrigation | IDPH license or registration; sewer also posts the bond; $100 license |
| Tree removal, landscaping, elevator, fire sprinkler | $10,000 bond, $1,000,000 insurance, state certificate where one exists, $100 license |
| Fire alarm | State certificate; no fee |
An owner who wants to do the work personally signs the Homeowner as Contractor affidavit, attaching a list of qualifications and similar work done; the village decides whether to allow it. No friend, relative or hired person may do that work, an owner acting as general contractor must show material costs and signed subcontracts, and plumbing by an owner is limited by the state plumbing law’s rule that the owner must live in the home for at least six months afterward.
Rather not deal with the building department?
Get a free quote →How to apply for a Lincolnwood building permit
Find the job on the residential or commercial list and open the matching handout.
Each contractor files its license application, bond and insurance in LAMA.
Collect signed, itemized proposals from every contractor, a recent plat of survey, drawings and worksheets as the handout lists.
Submit the full application at lincolnwood.onlama.com; partial applications are not accepted, and paper ones take longer.
Plans come back within ten business days; re-reviews cost extra.
Pay in LAMA, print the permit and post the card where it can be seen from the street.
Review, corrections and what causes delay
The department completes plan reviews, and reviews of revisions to an issued permit, within ten business days. Even with every review approved, the permit waits until all supplemental documents are in and every contractor is registered, so a contractor’s missing bond or insurance holds up issuance. Proposals must be itemized and signed by both owner and contractor. Work must start within 180 days of issuance and finish within one year; the building permit extension request form covers longer jobs.
Inspections and certificates in Lincolnwood
Inspections run Monday to Friday in a morning block (8:00 a.m. to noon) or an afternoon block (noon to 4:00 p.m.). Book at least one business day ahead in LAMA or at 847-673-7402; the village warns that the busiest dates fill up, so request early. The permit card stays posted in view of the street until the final inspections are approved.
- Roofs: spot inspections may happen during the work, and the final follows the contractor’s request; the contractor need not attend unless told to.
- Additions and remodels: inspections follow the approved plans, including hardwired, interconnected smoke and carbon monoxide alarms.
- Fences: post holes are dug to 42 inches before the posts are set.
- Mechanical: for a high-efficiency furnace, the installation manual must be on site for the inspector.
Construction is allowed from 7:00 a.m. to 6:00 p.m. on weekdays and 7:00 a.m. to noon on Saturdays, and is banned on Sundays under the village’s site management rules. A permit does not override any covenant or condominium or homeowners association rule.
Illinois building code in Lincolnwood
Lincolnwood enforces the codes in effect since November 30, 2025, with the amendments in Chapter 14 of its Village Code, through the Community Development Department. FEMA’s Community Status Book lists the Village of Lincolnwood (community 171001) as participating in the National Flood Insurance Program, with its current flood map dated August 19, 2008.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Lincolnwood permit search and official resources
Applicants track, pay for and print their own permits in LAMA. For other permit records, documents or drawings, send a written Freedom of Information Act request by email to FOIA@lwd.org, through the village’s service request portal, in person at the Village Manager’s Office in Village Hall, or by mail to the FOIA Officer at 6900 N. Lincoln Avenue. The village answers non-commercial requests within five business days; the first 50 pages are free and later pages cost $0.15 each.
- Lincolnwood building and construction
- Permits required list, residential
- Permits required list, commercial
- Building permit application
- Adopted building codes (effective November 30, 2025)
- Contractor license requirements
- Contractor license application
- Homeowner as contractor affidavit
- Residential addition handout
- Roof requirements and inspection handout
- Fence handout
- Furnace, air conditioner and water heater handout
- Public hearing application and fee schedule (variations)
- Village permit and license applications
- Freedom of Information requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Lincolnwood building permit FAQs
Do I need a permit to replace my roof in Lincolnwood?
Yes. Re-roofing or a new roof covering needs a permit; only shingle or membrane repairs up to 50 square feet are exempt, and the roofer needs a state license and a village contractor license.
How long does plan review take?
Within ten business days for standard permits, about 48 hours for quick-turnaround permits such as fences and decks, and over the counter for furnaces, roofs and windows.
Can a homeowner pull a permit and do the work?
Possibly. You sign the Homeowner as Contractor affidavit with your qualifications, carry $1,000,000 in liability insurance, and the village decides whether to approve it.
What does a contractor license cost?
$100 for most trades, with a $10,000 bond; plumbing and fire alarm contractors register with no fee.
Do I need a permit to remove a tree?
Yes, for a tree more than 8 inches in diameter.
When can construction happen?
From 7:00 a.m. to 6:00 p.m. on weekdays and 7:00 a.m. to noon on Saturdays; Sunday work is not allowed.
Can I pay by card?
Yes, in LAMA, but since January 1, 2026 card and debit payments carry a 3% fee.
Simplify Lincolnwood permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lincolnwood sooner?
Let Alliance prepare, file, and track your Lincolnwood permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Matteson
Read guide →Maywood
Read guide →Lisle Building Permit Guide