In Glendale Heights, building permits are handled by the Community Development Department on the first floor of the Civic Center, 300 Civic Center Plaza (630-260-6030; Monday to Friday, 8 a.m. to 4:30 p.m.). Applications are submitted, reviewed, paid for and issued in Cloudpermit, but inspections are booked by phone at least 48 hours ahead. The fee ordinance the village links charges flat fees for common jobs, such as $50 for a fence or a re-roof without a pre-permit inspection, and 1.5% of the estimated construction cost for other work.
What requires a building permit in Glendale Heights?
The village says permits are needed for most construction projects and asks owners to secure one before they start to build, and ideally before buying materials. Its fee ordinance and Cloudpermit addendums show the work it routinely permits.
House projects
- Decks (covered or uncovered) and balcony replacement
- Roofing and siding
- Window and door replacement
- Fences, flagpoles, sheds and gazebos
- Driveways, patios, service walks, public sidewalks and aprons
- Above-ground pools, hot tubs and spas; in-ground pools
- Kitchen and bathroom remodels, stairs, guards and handrails
- Electrical work, panels, generators, solar systems and EV chargers
- Furnaces, air conditioners and water heaters
- Plumbing fixtures, lawn irrigation and water or sewer connections, repairs and disconnections
- Interior demolition and burglar alarms
Commercial and multi-family
- Build-outs, alterations and new buildings (valuation fee)
- Fire alarms, fire sprinklers and elevators
- Signs, canopies and racking
- Pavement replacement, sealcoating and striping
- Construction and sales trailers and temporary electric service
- Security alarms, irrigation and water heaters
- Temporary uses
- Demolition, site grading and cell towers (special projects)
Homeowners association rules apply on top of village rules: where an association exists, its approval letter, on its letterhead and signed by an authorized agent, must be attached to the Cloudpermit application.
What Glendale Heights decides and what the state holds
The village adopts its own codes with local amendments: the 2021 International Residential, Building, Existing Building, Fire, Mechanical, Fuel Gas, Property Maintenance and Swimming Pool and Spa codes, the 2020 National Electrical Code and the 2024 Illinois Energy Conservation Code. Plumbing follows the 2014 Illinois Plumbing Code and accessibility the 2018 Illinois Accessibility Code. The village also sets its own fees, contractor licensing and bonds, and runs point-of-sale and rental inspection programs.
Glendale Heights building department: who handles permitting
Community Development reviews building permit applications and inspects construction, licenses contractors, reviews development for stormwater compliance and keeps the floodplain maps, and also runs zoning, property maintenance, the real estate transfer inspection program and rental licensing. Unincorporated land around the village is permitted by DuPage County Building and Zoning (630-407-6700), which has no role inside village limits.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development Department, first floor, Civic Center, 300 Civic Center Plaza, Glendale Heights, IL 60139 |
| Phone and fax | 630-260-6030; fax 630-260-1317 |
| Village main line | 630-260-6000 |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Email (questions only) | permits@glendaleheights.org |
| Online filing | Cloudpermit (permits, contractor and business licenses) |
The building permits page gives the street as Civic Center Drive; the village’s forms and footer use 300 Civic Center Plaza. Since Cloudpermit went live the permits email no longer accepts applications, though staff still answer questions sent to it.
Glendale Heights permit types
Applicants register in Cloudpermit once, then choose New Application, confirm Illinois and Glendale Heights, pick Building Permits and work through the project description, work category and type, address, parties, forms and attachments. An email address is required; anyone without one can get help at the counter, but at least one party with email must be on the application or no notices will arrive. Before signing off, the applicant must read the addendums for the permit type, because signing confirms they were read and understood.
Residential permits
- Roofs and siding. The 2026 addendum requires drip edges, replacement of rotted sheathing (5/8 inch on trusses 24 inches apart), double underlayment on slopes from 2:12 to 4:12, ice and water shield 24 inches inside the exterior wall line, nails rather than staples and no more than two layers of shingles. A rough inspection is needed if framing is repaired or more than 25% of the decking is replaced; otherwise only a final, once the site is clean, and nobody needs to be home.
- Decks. Posts on concrete piers at least 8 inches across (10 inches for 6x6 posts) and 42 inches deep, a 2x8 ledger lag-bolted at 16 inches on center, guards where the deck is more than 30 inches above grade, and stairs at least 36 inches wide with risers no higher than 7-3/4 inches and treads at least 10 inches deep.
- Other addendums. Concrete, patios and driveways; doors and windows; electrical; EV chargers; fences; gazebos and pergolas; HVAC; kitchen and bathroom remodels; pools and spas; remodels; sheds; solar; stairs and handrails; water heaters; and plan reviews for private water service and sanitary sewer repairs.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial, industrial, office and multi-family work has its own flat fees for signs, alarms, sprinklers, elevators, pavement and temporary uses, and other work is priced at 1.5% of value. Where the village decides consultants are needed for plan review, inspections or legal review, the applicant pays their cost and leaves a $1,500 deposit for architectural, structural or MEP plans and another $1,500 for civil engineering plans; unused money is refunded after the final certificate of occupancy. Projects may be permitted in phases (mass grading, site development, foundation, shell, phased occupancy) for an extra 10%, after a hold-harmless agreement.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The seven-member Planning and Zoning Commission holds hearings and recommends to the Village Board on zoning amendments, conditional uses, planned unit developments, subdivisions and comprehensive plan changes; application packets list fees and documents.
- County transportation fee. No building or occupancy permit for new, enlarged or altered buildings is authorized until the village has a receipt for the DuPage County Fair Share Transportation Impact Fee.
- Site security. Site development work, including public improvements, stormwater and erosion control, needs an irrevocable letter of credit for 125% of the approved cost estimate before a permit issues.
- Stormwater. The village holds an MS4 stormwater permit and reviews development for post-construction stormwater management.
- Heavy trucks. The village has local weight limits, and overweight vehicles on village streets need a Police Department permit through the OXCART system; questions go to the commercial vehicle enforcement officer at 630-260-6000, extension 8362.
Glendale Heights permit costs and fees
The Building Fee Ordinance linked from the permits page is a 2014 amendment to Village Code Section 10-1-8; the posted copy leaves the ordinance number and passage dates blank, so confirm a fee in Cloudpermit before relying on it. Flat fees apply when the work is done on its own and not as part of a larger project.
Rather talk it over?
Call 1-855-478-4290 →| Permit | Fee |
|---|---|
| Deck, covered or uncovered | $100 |
| Fence; door replacement; furnace; air conditioner; water heater | $50 each |
| Furnace and air conditioner together | $75 |
| Roof or siding, without / with pre-permit inspection | $50 / $75 |
| Window replacement, 1 to 5; 6 or more | $50; $75 |
| Shed or gazebo on ground; on slab | $50; $75 |
| Above-ground pool, hot tub or spa | $75 |
| Driveway, patio or service walk; public sidewalk or apron | $50 each ($75 for both) |
| Electric (minimum); electric panel; generator | $50; $75; $75 |
| Plumbing, three fixtures or fewer | $50, plus $5 per extra fixture |
| Prefab fireplace; lawn irrigation | $100; $75 |
| Other work (valuation fee) | 1.5% of estimated cost, at least the sum of the trade minimums |
| Re-inspection after the one included | $25 residential; $50 non-residential |
| Temporary certificate of occupancy | $50 single-family; $100 other |
The value used for the 1.5% fee comes from R.S. Means cost data, though the village may accept a signed contract or an architect’s or engineer’s sealed estimate instead. Worked example: a remodel with a signed contract of $20,000 pays 1.5%, or $300, which is more than the trade minimums. Demolition, in-ground pools, site grading and utilities, and cell towers are billed at hourly plan review and inspection rates. Starting work without a permit doubles the calculated fee, renewing a suspended permit costs half the original fee, a field change permit costs at least $50 for a house or $100 for commercial work, and a written zoning certification is $100.
Trade permits and who may pull them
No contractor may work in Glendale Heights without a village contractor license, registered and renewed in Cloudpermit, and bonds and licenses must be on file before a building permit is issued. The registration form asks for a $20,000 surety bond with every application and a $75 fee. Plumbers, roofers and fire protection contractors instead file a current State of Illinois license, and electricians a license issued by an approved municipality; the fee is waived for those trades. The two village pages differ on plumbers’ bonds: the contractor information page says electricians and plumbers still post the bond, while the registration form marks plumbing as exempt from it.
The village’s registered contractor list is posted online. A sub-contractor list form naming everyone on a project is submitted with the permit, contractors must clear trash from the site at least weekly, and roofing contractors’ state license numbers are recorded on each roofing permit. Homeowners file the same Cloudpermit application as contractors.
Rather not deal with the building department?
Get a free quote →How to apply for a Glendale Heights building permit
If an HOA governs the property, get its signed approval letter on letterhead.
Each contractor registers in Cloudpermit with the bond and license before the permit can issue.
Choose Building Permits, the work category and type, and add the address and parties.
Upload the required files, read the addendums and sign off the application.
Plan changes requested by staff come through Cloudpermit; resubmit them there.
Pay online when notified; the permit arrives by email, and work may start.
Review, corrections and what causes delay
The village advises leaving enough time for approval before a planned start and providing detailed submissions the first time. Missing HOA letters, unregistered contractors without bonds on file, a missing DuPage County transportation fee receipt and changes requested during review are the common causes of delay. A substantive change to an approved scope needs a field change permit with new construction documents, priced on the value of the new work.
Inspections and certificates in Glendale Heights
Most projects need village inspections, and Cloudpermit lists the required ones for each permit. To book, call the Community Development front counter at 630-260-6030 at least 48 hours ahead; the village asks applicants not to schedule through Cloudpermit, and limited staff means limited dates and times. The permit fee covers inspections plus one re-inspection; later re-inspections for failed work, phasing or nobody being present cost $25 for residential work and $50 for other work. The inspection card must be posted where the inspector can make entries on it. When all requirements are met, the permit is closed in Cloudpermit and an email notice follows.
Selling a property brings a separate inspection. A Real Estate Transfer Application for Certificate of Inspection must be filed at least 21 days before closing, with a fee of $100 for a single-family home, $200 for a multi-family building of up to six units plus $10 for each extra unit, or $300 to $700 for commercial and industrial space by size, plus a plat of survey less than a year old. Items found must be fixed and re-inspected, or the buyer may sign a Guarantee of Compliance for authorized items, before the Finance Department sells the transfer stamp at $3 per $1,000 of value. Rental units are licensed and inspected under a separate program.
Want this handled start to finish?
Get a free quote →Illinois building code in Glendale Heights
FEMA’s Community Status Book lists the Village of Glendale Heights (community 170206) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019, and in the Community Rating System at class 7, a 15% flood insurance discount, since May 1, 2016.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Glendale Heights building permit FAQs
Can I still email a permit application in Glendale Heights?
No. Applications go through Cloudpermit; the permits email only answers questions.
How do I schedule an inspection?
Call 630-260-6030 at least 48 hours ahead. Do not book it in Cloudpermit.
How much is a deck permit?
$100 under the fee ordinance the village links.
Does a roof replacement need a permit?
Yes. The fee is $50, or $75 with a pre-permit inspection, and the work needs at least a final inspection.
What does a contractor need to work here?
A village license in Cloudpermit and a $20,000 bond (the registration form exempts plumbing from the bond); most trades pay $75, and plumbers, roofers, fire protection contractors and electricians file their license with the fee waived.
Do I need an inspection before selling my home?
Yes. Apply for the real estate transfer certificate of inspection at least 21 days before closing; the fee is $100 for a single-family home.
Who permits land outside the village?
DuPage County Building and Zoning, which handles unincorporated areas only.
Glendale Heights permit search and official resources
Permit progress, inspection requirements and the final close-out notice are shown in each project’s Cloudpermit workspace. Other records, including older permits and amounts owed on a property, are requested through the village’s online FOIA public records request system.
Inspections are where schedules slip.
Get a free quote →- Cloudpermit login
- Cloudpermit walkthrough
- Building permits
- Cloudpermit launch notice (November 2, 2026)
- Building fee ordinance (Village Code 10-1-8)
- Permit addendums
- Roof and siding permit addendum 2026
- Deck permit addendum 2026
- Contractor information
- Contractor registration application
- Real estate transfer stamps and inspections
- Planning and Zoning
- Storm water management
- Community Development
- DuPage County Building and Zoning (unincorporated areas)
- FEMA Community Status Book, Illinois
Simplify Glendale Heights permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Glendale Heights sooner?
Let Alliance prepare, file, and track your Glendale Heights permits while your crew stays on the job.
More Illinois permitting guides
DuPage County
Read guide →Hinsdale
Read guide →Lisle
Read guide →Glenview Building Permit Guide
Read guide →Godfrey Building Permit Guide
Read guide →Granite City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Glendale Heights permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.