Franklin County, Illinois Building Permit Guide

To get a building permit in Franklin County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Franklin County has no building or zoning department, but its Supervisor of Assessments issues a $50 county building permit for each new structure, which the County Engineer checks against the flood maps; septic permits come from the Bi-County Health Department.

Building permit: Supervisor of Assessments, $50Floodplain review: County EngineerPhone: 618-435-9800
County building permit
$50 per structureSupervisor of Assessments, Benton
Floodplain review
County EngineerApproves every county permit
Septic permit
$150Franklin-Williamson Bi-County Health
Highway entrance
One 20-ft entrancePer property on county highways

Franklin County’s government in Benton has no building, zoning or planning department, yet it does issue a county building permit: the Supervisor of Assessments (Campbell Building, 901 Public Square, Benton, 618-435-9800) takes the application and a $50 fee for each new structure, addition, manufactured home or attached deck, and the County Engineer at the Highway Department (13034 Oddfellow Lane, 618-439-0331), who is also the floodplain administrator, approves it. Septic systems and wells are permitted by the Franklin-Williamson Bi-County Health Department, and West Frankfort, Benton and the other cities and villages that have their own ordinances handle building inside their limits.

What requires a permit in Franklin County?

The county’s building permit information sheet, posted with the Supervisor of Assessments’ forms, lists what needs the $50 county permit:

County building permit

  • Any permanent structure erected on the property
  • Any addition to an existing structure
  • Any mobile home or manufactured home
  • Decks and porches permanently affixed to the real estate
  • Property inside a city, town or village that has no zoning or city ordinances of any kind; the sheet names the Village of Orient and Mulkeytown as examples

No permit

  • Portable buildings and portable carports
  • Any portable structure smaller than 12 by 14 feet
  • County electrical, plumbing or mechanical permits (none exist)

Each structure needs its own permit, and every permit goes to the County Engineer for approval. The Highway Department describes that step: the County Engineer checks building permits in unincorporated areas for compliance with FEMA floodplain rules and supplies base flood elevations. Separate approvals still apply for development in a floodplain, utility work and entrances on county highways, overweight moves, and septic systems and wells.

What the county decides and what the state holds

The county permit records the improvement and routes it through the floodplain check; the county publishes no building code and no construction inspections. The board has adopted a floodplain ordinance, applied through the County Engineer’s floodplain permit, and the Franklin and Williamson county private sewage ordinances are enforced by the Bi-County Health Department. The state holds the building minimums described in the code section below, plumbing and plumber licensing, roofing contractor licensing, and floodway construction permits.

Franklin County building department: who handles permitting

Three county-level offices share the work on a rural project:

Short on time to read all of this?

Get a free quote →
Franklin County permit offices
OfficeRoleContact
Supervisor of AssessmentsCounty building permit ($50); parcel records, GIS maps, exemptionsCampbell Building, 901 Public Square, Benton, IL 62812; 618-435-9800; Monday to Friday 8 a.m. to 4 p.m.
Highway Department / County EngineerApproves building permits; floodplain permits and base flood elevations; utility, overweight and entrance permits13034 Oddfellow Lane, Benton, IL 62812; 618-439-0331, fax 618-439-6411; Monday to Friday 7 a.m. to 3:30 p.m.
Franklin-Williamson Bi-County Health DepartmentSeptic permits and inspections, new wells, well sealing, water tests, food plan reviewBenton office, 403 E. Park St., Benton, IL 62812; 618-439-0951; 8 a.m. to 4 p.m. Monday to Friday
IDOT West City maintenance yardState highways618-438-4891

Matthew L. Barnett, P.E., is the County Engineer and floodplain administrator. His department maintains 142 miles of county highway and 53 bridges, and township road districts maintain the township roads shown on the department’s jurisdiction maps.

Cities and villages in Franklin County

  • West Frankfort (7,105 people): the city’s Codes Department (618-932-3262) issues building and sign permits, handles building, sign and demolition permits and contractor registration through its online GovWell portal, and runs the non-owner (rental) property application and inspections; City Hall is at 605 W. Main St.
  • Benton (6,558), the county seat: ask the city about building permits inside its limits.
  • Christopher (2,607), Sesser (1,888), Zeigler (1,456), Royalton (1,031), West City (640), Valier (538), North City (503), Thompsonville (477), Buckner (393), Orient (321), Hanaford (315), Ewing (295), Freeman Spur (120 on the Franklin County side) and Macedonia (12 on this side): a town with no zoning or ordinances falls under the county permit, as the sheet says of Orient; otherwise ask the city or village hall.

Franklin County permit types

The county building permit form covers a new building, an addition, an alteration, a demolition, a repair or replacement, and a manufactured home. It asks for the owner, the property address and property index number, square footage, bathrooms and bedrooms, the estimated completion date and the estimated cost of construction, with a drawing of the improvement and its dimensions attached.

Residential permits

  • County building permit: one $50 permit per structure, so a house and a detached garage are two permits. If the County Engineer marks the site as inside the 100-year floodplain, a location map of the improvement is needed.
  • Floodplain development permit: for building, improving, filling or placing a manufactured home in a mapped flood area; the application records the base flood elevation, the lowest floor elevation including any basement, and the height of utilities. An improvement whose cost equals or exceeds 50% of the structure’s market value, “or 20% of the total floor area”, triggers the substantial improvement rules.
  • Septic system: a $150 Bi-County Health permit, issued only after the application is approved; homeowner-installed systems need a site inspection before the permit is issued. The application describes the house (bedrooms, basement, garbage disposal, water softener, hot tub), the water supply, the soils investigation and the proposed tank and field, and the department’s checklist adds lot size, site elevations, separation distances, cleanout and alarm locations, tank model numbers and approved pipe types.
  • Well: a health department permit before any new well is built; sealing an abandoned well is also regulated. The department runs the private water program as the Illinois Department of Public Health’s agent under a written agreement, applying the Illinois Water Well Construction Code and the Water Well Pump Installation Code.
  • Driveway entrance: the county provides one 20-foot entrance per property on a county highway; extra length or entrances are installed by county crews at material prices if the County Engineer approves.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial structures take the same county building permit; the state minimums in the note below set the construction standards. A floodproofed non-residential building needs a registered professional engineer’s or architect’s certification, and subdivisions of 50 lots or 5 acres must show base flood elevations. Bi-County Health reviews subdivision plats that will rely on private sewage systems, and a non-residential septic application states the number of employees and daily water use. A food service establishment or retail food store that is built, extensively remodeled or converted must submit a plan review to the Bi-County Health Department before construction, and its plumbing is inspected by the Illinois Department of Public Health’s plumbing inspector (618-993-7010).

What comes before construction

  • Locate the parcel on the county’s Portico GIS map and turn on the floodplain layer.
  • Floodway work: on a rural stream draining ten square miles or more, get the Illinois Department of Natural Resources permit first.
  • Soils and address: a septic application needs a 911 address and a copy of the soils investigation.
  • Road access: ask the Highway Department, or the township road commissioner for a township road.

Franklin County permit costs and fees

The county permit fee is a flat $50 per structure, paid to the Franklin County Supervisor of Assessments. Other published charges:

Rather talk it over?

Call 1-855-478-4290 →
Franklin County charges for rural projects
ItemCharge
County building permit (Supervisor of Assessments)$50 per structure
Private sewage permit (Bi-County Health)$150 per permit, checks payable to Franklin-Williamson Bi-County Health Department
Utility or overweight vehicle permit (Highway Department)Typically no fee
First 20-foot entrance on a county highwayProvided by the county; extra length at current material prices
Floodplain development permitFee line on the form; no amount published
GIS map copies (Supervisor of Assessments)$1 line map, $2 black and white with aerial, $5 color with aerial, $25 for a 36-inch color aerial
Parcel report or property record card$0.50 per page
ARC Map shapefile or Excel parcel file$0.10 per parcel on the assessment fee list, with three working days’ notice; the GIS page lists shapefiles at $0.10 per parcel without data and $0.20 with attached data

Worked example: a new house with a detached garage and a new septic system on rural land needs two county building permits ($100) and one sewage permit ($150), or $250 in government fees. The well driller, septic installer and any surveyor charge separately. After completion, the Homestead Improvement Exemption keeps the added assessed value of an improvement to an owner-occupied home off the tax bill for four years; it may be granted automatically or require Form PTAX-323.

Trade permits and who may pull them

Franklin County issues no electrical, plumbing or mechanical permits and publishes no county contractor license or registration. The rules that matter on a rural job:

  • Septic systems: only a current Illinois licensed private sewage contractor or the property owner may construct, alter or repair one, and the application must be signed by the homeowner and/or the contractor.
  • Plumbing: follows the Illinois Plumbing Code under a plumber licensed by the Illinois Department of Public Health.
  • Roofing: roofing contractors hold licenses from the Department of Financial and Professional Regulation.
  • Floodplain work: floodproofing certifications come from a registered professional engineer or architect.

Inside West Frankfort, contractors register with the city through its GovWell portal; other towns’ rules come from their own codes.

Rather not deal with the Franklin County building department?

Get a free quote →

How to get permits for a rural Franklin County project

1. Find the parcel

Search the Portico GIS map by index number, owner or address, and check whether the site is inside a city or village with its own ordinances.

2. File the county building permit

Complete the form with the drawing and cost estimate and pay $50 per structure at the Supervisor of Assessments, 901 Public Square.

3. Clear the floodplain check

The County Engineer reviews the permit; in a flood area, file the floodplain development permit and any IDNR floodway permit.

4. Apply for septic and well permits

Send the sewage application, soils report, 911 address and $150 to Bi-County Health; the well contractor applies for the well permit.

5. Give 48 hours’ notice

Notify the health department at least 48 hours before septic construction starts.

6. Arrange road access

Ask the Highway Department for the county-provided entrance, or the township road commissioner.

Review, corrections and what causes delay

A missing drawing or cost estimate holds up the county permit, and a site the Engineer marks as floodplain needs a location map and the floodplain permit. On the septic side, the health department issues a permit-to-construct number only when the application is complete; a variance request must come with the application, and homeowner installations wait for the pre-permit site visit. Health inspectors are usually in the office from 8 to 9 a.m. and 3 to 4 p.m. on weekdays.

Inspections in Franklin County

The county building permit carries no construction inspections or certificate of occupancy. Inspections on a rural project come from:

  • Bi-County Health: inspects septic installations for compliance with the application and code, inspects all new wells, and collects water samples for the Illinois Department of Public Health laboratory; call the Benton office or e-mail eh@bicountyhealth.org to schedule a water test.
  • Floodplain: the floodplain permit records who inspected the work, the as-built lowest floor elevation from the elevation certificate, and the certificate of compliance.

Bi-County Health also runs the nuisance control program the Franklin and Williamson county boards set up: its inspectors investigate and work to abate hazards from general nuisances, solid waste, insects and rodents, and dangerous buildings. Inside West Frankfort and the other towns with codes, inspections follow the city’s or village’s own rules.

Illinois building code in Franklin County

Franklin County publishes no adopted building code, so the statutory minimums described below apply to new homes and commercial buildings on land outside the towns with their own codes; the county permit itself sets no construction standard. Floodplain development is governed by the county’s floodplain ordinance. FEMA’s Community Status Book lists unincorporated Franklin County (community 170899) as participating in the National Flood Insurance Program, with flood maps effective November 18, 2009.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Franklin County permit FAQs

Do I need a county building permit in rural Franklin County?

Yes, for any permanent structure, addition, manufactured home or attached deck or porch: $50 per structure from the Supervisor of Assessments.

Does a small shed need a permit?

Portable buildings, portable carports and portable structures smaller than 12 by 14 feet do not.

Who approves the county permit?

The County Engineer, who checks it against the floodplain maps.

How much is a septic permit?

$150 from the Franklin-Williamson Bi-County Health Department, with 48 hours’ notice before construction starts.

Can I install my own septic system?

Yes, as the property owner, after a site inspection; otherwise a current Illinois licensed private sewage contractor must.

When does a floodplain remodel become a substantial improvement?

When its cost equals or exceeds 50% of the structure’s market value, or 20% of the total floor area, in the form’s words.

Where do I get a building permit in West Frankfort?

From the city’s Codes Department (618-932-3262) through its online permit portal.

Franklin County permit records and official resources

County building permits are filed with the Supervisor of Assessments; floodplain, elevation and road permit records stay with the Highway Department; septic and well records with Bi-County Health. Each county department has its own Freedom of Information officer: send the county’s FOIA request form to the department that holds the record.

Inspections are where schedules slip.

Get a free quote →

Simplify Franklin County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Franklin County sooner?

Let Alliance prepare, file, and track your Franklin County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Franklin County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.