No county building, zoning or planning department appears on the Williamson County website. Its Cities and Villages page links official pages for Carterville, Creal Springs, Herrin, Hurst, Johnson City and Marion, and also lists Bush, Cambria, Colp, Crainville, Energy, Freeman Spur, Pittsburg, Spillertown, Stonefront and Whiteash. By the Census Bureau’s 2025 estimates the largest municipalities are Marion city (17148), Herrin city (12268), Carterville city (5839) and Johnston City city (3313).
This guide covers the building offices of Marion, Herrin and Carterville, the county Highway Department and the Bi-County Health Department. The county page links only a Facebook page for Johnston City, so no official Johnston City building details are given; contact the city directly.
What requires a permit in Williamson County?
Marion requires residential building permits for any new construction such as storage buildings, garages and decks, and excavation permits when a curb, sidewalk or street will be cut. Herrin requires building permits for anything over 10 sq ft under roof. Private sewage permits in Williamson County come from the Franklin-Williamson Bi-County Health Department.
Short on time to read all of this?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Who handles permitting in Williamson County?
| Office | Handles | Contact |
|---|---|---|
| Marion Building and Code Services | Development permits; 350 Tower Square Plaza, Marion | 618.993.2422 |
| Herrin (City Hall) | Building permits and certificate-of-occupancy inspections; 300 N Park Ave. | (618) 942-6004; weekdays 8:30 am to 2:00 pm |
| Carterville Building Inspector | Building permits; Ralph Graul | (618) 713-4130 |
| Williamson County Highway Department | Driveway culverts and road permits; 1817 N. Court St., Marion | (618) 998-2145 |
| Franklin-Williamson Bi-County Health Department | Private sewage permits | Inspectors usually in the office 8:00-9:00 a.m. and 3:00-4:00 p.m. on weekdays |
Not sure this scope needs a permit?
Get a free quote →Local rules in Marion, Herrin and Carterville
Marion
Besides building and excavation permits, Marion requires a Dirt Hauling Permit for any dirt hauled into the city and a Commercial Occupancy Permit for a new business, change of ownership or relocation.
Herrin
Permits are needed for anything over 10 sq ft under roof; the certificate-of-occupancy inspection is booked at (618) 942-6004.
Carterville
The owner or contractor must stake out the project before applying, and commercial plans need an architect’s stamp. Property must be annexed before water or sewer taps can be permitted.
Williamson County permit costs and fees
- Herrin: 10 cents per sq ft under roof; certificate-of-occupancy inspection $25.00.
- Carterville: $.10 per square foot of construction under roof.
- County driveway culverts: a 12-inch x 24-foot culvert installed by the Highway Department is $460.08 plus a $225.00 fee, $685.08 total. Credit cards are accepted for culvert installation and road permits.
- Private sewage permit (Bi-County Health): $150 per permit.
Rather talk it over?
Call 1-855-478-4290 →How to get a permit in Williamson County
Marion, Herrin and Carterville each issue their own building permits.
Stake out the project before applying; annex before any water or sewer tap.
Apply to Bi-County Health with a 911 address; installation only by an Illinois licensed private sewage contractor or the owner.
The county Highway Department installs culverts and issues road permits.
Dirt Hauling and Commercial Occupancy Permits where they apply.
A building permit carries a validity period set by the local building office; confirm the expiry on phased or delayed work before it passes. Permit validity in Illinois
Inspections in Williamson County
Carterville requires four inspections: site, footings, pre-sheetrock and final. Herrin’s certificate-of-occupancy inspection costs $25.00 and is booked at (618) 942-6004, weekdays 8:30 am to 2:00 pm. Bi-County Health needs 48 hours’ notice before sewage system construction starts.
Rather not deal with the Williamson County building department?
Get a free quote →Official Williamson County permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Williamson County cities and villages
- Williamson County Highway Department
- Bi-County Health private sewage procedures
- Marion Building and Code Services
- Herrin code enforcement
- Carterville building permits
Want this handled start to finish?
Get a free quote →Frequently asked questions
Does Williamson County issue building permits?
No county building department appears on the county website; Marion, Herrin and Carterville issue their own building permits.
What does a septic permit cost in Williamson County?
$150 per permit from the Franklin-Williamson Bi-County Health Department, with 48 hours’ notice before construction.
Does a small shed need a permit in Herrin?
Herrin requires a building permit for anything over 10 sq ft under roof, at 10 cents per sq ft.
Simplify Williamson County permitting with Alliance Permitting
Inspections are where schedules slip.
Get a free quote →- Confirm whether the county or a city or village has the parcel, and which office to file with
- Line up the health, highway and floodplain approvals that come before the building permit
- File with the right office and keep inspections on schedule
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Williamson County sooner?
Let Alliance prepare, file, and track your Williamson County permits while your crew stays on the job.
More Illinois permitting guides
This guide is provided by Alliance Permitting for general information about Williamson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.