Building permits in the Village of Evergreen Park come from the Building Department in the village Administration Building at 9418 S. Kedzie Avenue (708-229-3335), led by Building Commissioner Hugh McGivern. Plans for new and remodeling work are uploaded as PDFs and must carry an Illinois architect’s stamp, every contractor must hold a village license before a permit issues, and many small jobs have printed fees: decks and sheds cost 1.5% of the estimated cost with a $25 minimum, and a fence permit is $100.
What requires a building permit in Evergreen Park?
The village’s permit package cites Chapter 5, Sections 106 and 107 of its ordinances and says permits are required for any alteration, addition, repair or remodel of any structure, with complete building plans submitted for approval. The department posts separate requirement sheets for the common residential jobs.
Permit required
- Alterations, additions, repairs and remodels of any structure
- Garages, decks, porches and storage sheds
- Fences, including replacements and repairs
- Demolition, after a Cook County EPA permit
- Electrical, mechanical and plumbing work
- Signs, sewer and water connections, and utility construction or repair
- Dumpsters and storage pods, on village or private property
No permit, rules still apply
- Above-ground pools: no permit, but a 48-inch barrier, 3-foot setbacks from side and rear lot lines, and 10 feet of clearance from electrical lines
Every application needs a current plat of survey. Plans must be drawn by people licensed in Illinois to do that work and stamped with their seals, and any change to approved plans needs the Building Commissioner’s approval.
What Evergreen Park decides and what the state holds
The village adopts its own codes, now the 2024 International codes, with the most current Chicago Electrical Code for wiring, and sets its fees, contractor licensing and point-of-sale rules. The Illinois Plumbing Code governs plumbing; plumbers are licensed by the state Department of Public Health and roofing contractors by the Department of Financial and Professional Regulation, and the village asks for both licenses on its contractor application.
Evergreen Park building department: who handles permitting
The Building Department is the first stop for building or renovating in the village and checks that purchases, sales, rentals and renovations meet village codes, with Hugh McGivern as Building Commissioner. It also handles zoning compliance for property sales, rental registration and property maintenance complaints, and its staff includes a zoning and permit coordinator.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permit office | Building Department, Village Administration Building, 9418 S. Kedzie Avenue, Evergreen Park, IL 60805 |
| Phone | 708-229-3335 (permits); 708-229-3333 (inspections); village main line 708-422-1551 |
| Fax | 708-229-3336 |
| Hours | Monday, Tuesday, Thursday and Friday 8:30 a.m. to 5:00 p.m.; Wednesday 8:30 a.m. to 1:30 p.m. |
| Building Commissioner | Hugh McGivern |
| Plan uploads | plans.evpk.org (PDF) |
The department’s permits page says it will not answer questions from, or accept permit submittals by, permit expeditors, and it no longer discusses commercial permits by email, questionnaire or phone. Commercial questions go to the Building Commissioner in writing from a licensed architect or engineer. Only property inside the village is permitted here.
Evergreen Park permit types
The main application package contains the village’s requirements, a residential permit information sheet, the permit form and a sworn contractor’s statement of the total project cost; the Building Commissioner may also ask for a copy of the owner’s contract with the general contractor. Non-owner-occupied properties must post a $10,000 cash bond before a building permit is issued.
Residential permits
- Additions and remodels: a plat of survey, a typed narrative of the work, and structural drawings stamped by an architect or structural engineer; a house on a wood foundation also needs an engineer’s letter confirming it is sound.
- Garages: two sets of drawings with framing and elevations, a plat of survey, an electrical permit application, footings 12 inches wide and 20 inches deep on all four sides with two #4 bars, and roof tie-downs; demolishing an old garage needs a Cook County EPA permit and a rodent control certificate.
- Decks and porches: at least 3 feet from property lines, with post holes 42 inches deep.
- Sheds: 3 feet from property lines and 10 feet from the house or garage, bolted to a concrete pad; no larger than 3% of the lot (a 144-square-foot shed is always allowed), never over 350 square feet, 20 feet on a side or 12 feet tall, with doors no taller than 8 feet; sheds not built from a kit need 2-by-6 rafters at 16 inches on center.
- Fences: up to 6 feet, or 8 feet along a commercial property line; front yards may not be fenced, and pool yards need 48-inch fences with lockable gates. The finished side faces the neighbors, posts are set in concrete with no stone fill, gates need metal stiffeners, and the village suggests keeping the fence 6 inches inside the property line.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial submittals must include complete architectural, civil, engineering, fire protection and fire alarm drawings, with MWRD and IDOT permit applications where they apply, all bearing original seals and signatures. A new commercial project needs an approved village business license before plan review begins. Commercial footings take four #4 bars, two top and two bottom, and slabs need Visqueen sheeting and wire mesh throughout.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning relief. The Zoning Board of Appeals hears variations, special uses and rezonings at 7:30 p.m. on the published 2026 schedule; owners within 200 feet are notified. The board only recommends, and the Village Board, meeting on the first and third Mondays at 6:30 p.m., has sole authority to approve or deny.
- Parking. Plans must show parking that meets the village parking ordinance.
- Business license. Required for new commercial projects before review.
- Demolition clearances. A Cook County EPA permit, a rodent control letter and a utility check-off.
- Stormwater and state roads. MWRD permit applications under the Watershed Management Ordinance and IDOT applications are part of a complete commercial package.
Evergreen Park permit costs and fees
Evergreen Park prints its fees on each requirement sheet rather than in one schedule. For decks, porches, sheds and garages the permit is 1.5% of the estimated cost, and inspection fees are taken out of a cash bond or escrow, with the balance refunded after the final inspection.
| Permit | Fee |
|---|---|
| Deck or porch | 1.5% of estimated cost, $25 minimum; $250 cash bond; $50 per inspection from the bond |
| Storage shed | 1.5% of estimated cost, $25 minimum; $250 escrow; $50 per inspection |
| Garage | 1.5% of estimated cost; $50 electrical permit; $500 permit bond; $50 per inspection from the bond |
| Fence | $100 total ($50 flat fee plus $50 post-hole inspection) |
| Dumpster or storage pod | $25, non-refundable, good for 30 days |
| Non-owner-occupied property | $10,000 cash bond before a building permit |
| Permit renewal after one year | A renewal fee equal to 25% of the original fee may be charged |
| Zoning Board of Appeals | $300 single-family variation; $600 new single-family home or 2-lot subdivision; $750 administrative deviation; $1,000 all others |
| Property sale | $100 inspection; $50 zoning compliance; transfer stamps $5 per $1,000 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the deck sheet: a deck with an estimated cost of $8,000 has a permit fee of 8,000 × 1.5%, or $120, plus the $250 cash bond; the two $50 inspections come out of the bond, so $150 is refunded after the final inspection. Change orders after approval are priced by the Building Commissioner, who adjusts the permit cost to match.
Trade permits and who may pull them
General contractor and subcontractor licenses must be applied for, approved and paid, and a license number assigned, before the village issues any permit. The contractor license application asks for the trade credentials that apply, an insurance certificate and the other towns where the contractor is licensed.
- Electrical: electricians list their electrical registration and post a $5,000 bond; wiring follows the most current Chicago Electrical Code. A garage permit includes a $50 electrical permit.
- Plumbing: plumbers give their state license or certificate number; sewer and water connections also need the Public Works utility permit with the plumber’s state and village license numbers.
- Sewer and drain layers: list their license and post a $20,000 bond. Electricians and sewer contractors are the only trades the village bonds.
- Roofing: roofers give their state license number.
- Lead work: lead abatement certification is recorded where it applies.
Homeowners may build their own deck, porch or shed under the village’s requirement sheets; fences, by contrast, must be installed by a village-licensed contractor. ComEd now requires new service heads no more than 25 feet above the ground, positioned for safe ladder access.
How to apply for an Evergreen Park building permit
Each contractor files the license application and pays the fee so a license number is assigned.
Have an Illinois-licensed architect prepare plans that follow village codes and show parking.
Submit the drawings as PDFs at plans.evpk.org.
Add the permit form, plat of survey, typed narrative and sworn contractor’s statement, plus any trade-specific requirement sheet.
Pay the permit fee and any cash bond or escrow the job carries.
Begin work within 6 months of issuance and finish within 12.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Plans without a current Illinois architect’s stamp, or without parking shown, do not meet the village’s submittal rules. Commercial packages missing civil, fire protection, fire alarm, MWRD or IDOT pieces stall, and a commercial project cannot enter plan review until its business license is approved. Changing approved plans needs the Building Commissioner’s approval and a change order showing the cost, and a permit not finished within a year may carry a renewal fee of 25% of the original fee.
Inspections and property sales in Evergreen Park
Call the inspection line at 708-229-3333. Decks and fences get a post-hole inspection and a final, sheds a pre-pour inspection of the pad and a final, and garages $50 per inspection from the permit bond, which is refunded only after every inspection, including the final electrical, has passed. Post holes must reach at least 42 inches, the local frost depth the village uses.
Before a home is sold, the seller obtains a zoning compliance form from the Building Department and schedules a property inspection at least five days before closing; the inspection is good for 90 days. The village’s point-of-sale checklist follows the 2024 property maintenance code. Violations can be repaired and re-inspected, or the buyer can take the property as is, with an attorney’s letter promising to apply for a building permit within 30 days of closing. Transfer stamps are bought last at the Administration Building, after the final water reading (708-229-3361), with the $100 inspection and $50 zoning fees added; personal checks are not accepted.
Public Works shares the cost of new overhead sewers: the village pays 50% or $5,000, whichever is less, under Ordinance 15-2022, after a sewer camera report, three estimates, the building permit and the paid invoice are submitted (Public Works, 708-229-3347).
Building codes in Evergreen Park
The Building Department’s current code list is the 2024 International Building, Residential, Mechanical, Energy Conservation, Fire and Property Maintenance Codes, the current Illinois Plumbing Code and the most current Chicago Electrical Code; where the fire code is silent, the NFPA Life Safety Code governs. FEMA’s Community Status Book lists Evergreen Park (community 170733) as participating in the National Flood Insurance Program, and its current map shows no special flood hazard area in the village.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Evergreen Park permit search and official resources
Permit files and inspection records are requested through the village’s online Freedom of Information Act form, and requests can be tracked in the same portal; other ways to submit are still accepted. Copies beyond the first 50 pages are $0.15 a page and certification is $1. The Building Department points commercial applicants to this FOIA route for permit information it no longer gives by phone or email.
- Building Department: staff and hours
- Building and contractor permit forms
- Current building codes
- Building plans submittal (PDF upload)
- Building permit application package
- Contractor license application
- Fence permit requirements
- Deck and porch permit
- Storage shed permit and ordinance
- Garage permit package
- Pool requirements
- Dumpster and storage pod application
- Zoning Board of Appeals application and 2026 schedule
- Property closing packet
- Overhead sewer cost sharing program
- Freedom of Information requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Evergreen Park building permit FAQs
How much is a deck or shed permit in Evergreen Park?
1.5% of the estimated cost with a $25 minimum, plus a $250 bond or escrow from which two $50 inspections are deducted.
Do I need a permit for an above-ground pool?
No, but the pool still needs a 48-inch barrier, 3 feet of clearance from side and rear lot lines and 10 feet from electrical lines.
Can a homeowner build their own deck or shed?
Yes. The village’s deck and shed sheets allow homeowners to build their own; fences must be installed by a village-licensed contractor.
How do I submit plans?
Upload them as PDFs at plans.evpk.org; they must carry the stamp of an Illinois-licensed architect and show parking.
Will the department work with a permit expeditor?
No. The Building Department says it will not answer questions from or accept submittals by permit expeditors.
When does the Zoning Board of Appeals meet next?
On the village’s schedule, the next hearings are December 8, 2026 (applications were due November 12) and January 12, 2027, with applications due December 17, 2026.
What does the village require before a home sale?
A zoning compliance form, a property inspection at least five days before closing ($100), a $50 zoning fee and transfer stamps at $5 per $1,000.
Simplify Evergreen Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Evergreen Park sooner?
Let Alliance prepare, file, and track your Evergreen Park permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Franklin Park
Read guide →Glenview
Read guide →Fairview Heights Building Permit Guide
Read guide →Fayette County Building Permit Guide
Read guide →Ford County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Evergreen Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.