In unincorporated Carroll County, including Lake Carroll and the other rural subdivisions, building permits come from the Carroll County Zoning & Building office in Mount Carroll (815-244-0284, zoning@carrollcountyil.gov). Applications are filed online or started by phone, with a site plan and a building plan; the county then sends an invoice. Fees follow the schedule updated on July 23, 2026: an after-the-fact permit costs double, a flood permit $500 and a Zoning Board of Appeals hearing $600. New wells need a separate Health Department permit.
What requires a permit in unincorporated Carroll County?
The county’s Chapter 360 Building Regulations is the ordinance that requires building permits and sets when one is or is not needed; the office also answers that question by phone or email. Its application list and fee schedule cover:
County applications
- Building permits for houses, additions and accessory buildings
- Demolition permits (no fee) and permits to move a structure
- Above-ground and in-ground pools
- Roof-mounted and ground-mounted personal solar
- Sign and billboard permits
- Address requests
- Agricultural land development (LESA) in the agricultural district
- Guest home (short-term residential rental) licenses
- Flood permits and temporary use permits
- Commercial solar, wind, energy storage and towers
Outside the county office
- New wells: Carroll County Health Department permit
- Septic: well and septic approval is asked for with the building application when needed
- Driveways and utilities: the online driveway and utility permit service linked from the county home page
- Projects in Savanna, Mount Carroll, Lanark, Thomson, Milledgeville, Shannon or Chadwick: that city or village
- Temporary meteorological towers: no fee or permit
Starting work without a permit means an after-the-fact permit at double the permit fee. The department’s pages also cover nuisance and code enforcement, plats, surveys and subdividing land.
What the county decides and what the state holds
Carroll County sets its own permit ordinance (Chapter 360), zoning ordinance (Chapter 700), special flood hazard areas ordinance, subdivision regulations and fees. It does not act as a building-code jurisdiction: the county posts notices disclaiming building-code jurisdiction under the Illinois Residential Building Code Act (815 ILCS 670) for homes and under 20 ILCS 3105/10.09-1 for commercial and public buildings, and it refers code questions to the Illinois Capital Development Board. For commercial, business and public buildings, the state requires an occupancy certification based on inspections by a qualified inspector. Plumbing follows the Illinois Plumbing Code with plumbers licensed by the state, and roofing contractors hold the state roofing license.
Short on time to read all of this?
Get a free quote →Carroll County building department: who handles permitting
The Zoning & Building office, led by Zoning Director Jaicee Kramer, issues every county permit and keeps the records of all zoning, building, subdivision and code violation activity in the county. It covers all land outside an incorporated city or village, including rural subdivisions such as Lake Carroll, Riverview, Walkers, Hill Crest, Fox Wood, Carroll Heights, Fawn Valley, Stone Field, County Squire, Hansons, Wacker, Argo Fay, Lynwood, Gibsons and Grandview.
| Office | Contact |
|---|---|
| Zoning & Building (building, zoning, flood and sign permits) | P.O. Box 227, Mt. Carroll, IL 61053; 815-244-0284; zoning@carrollcountyil.gov; in-person appointments Monday and Wednesday to Friday, 8:30 a.m. to 4:30 p.m.; Tuesdays by phone or email |
| Carroll County Health Department, Environmental Health (wells, septic evaluations) | 822 S. Mill Street, Mt. Carroll, IL 61053; 815-244-8855; fax 815-244-5010; Monday to Friday 8:30 a.m. to 4:30 p.m., later by appointment |
| Zoning Board of Appeals | Hearing fee $600; ZBA page in the Zoning & Building menu |
The office is sometimes closed for field work, so call ahead before visiting; requests sent online, by phone or by email are answered in the order received. Staff can explain county regulations but cannot give legal advice on the zoning ordinance, the flood ordinance, the subdivision rules or state law.
Cities and villages in Carroll County
County applications do not apply inside the incorporated places: Savanna (population 2,699), Thomson (1,606), Lanark (1,452), Mount Carroll (1,432), Milledgeville (988), Shannon (835) and Chadwick (476). For a lot in one of them, ask that city or village hall which permits it requires. Townships do not issue building permits.
Carroll County permit types
Applications are filed through the county’s online application link or started by phone at 815-244-0284; walk-ins are welcome if you call first. Supporting documents can be uploaded, emailed, mailed or delivered. Every online application needs a site plan drawn to the county’s instructions, and every building application also needs a building plan. Incomplete applications cannot be reviewed and may fail to submit.
Residential permits
- Houses, additions and accessory buildings: the building application with the site plan and building plan; the house and accessory rates are in section 1 of the fee schedule.
- Pools: $50 above ground, $100 in-ground.
- Personal solar: $50 on a roof, $100 on the ground.
- Demolition and moving: a demolition permit costs nothing; a permit to move a structure costs $50.
- Guest homes: renting a home short-term needs a guest home license, $250 new and $100 to renew.
- Homes in the agricultural district: building on farmland may need a Land Evaluation and Site Assessment (LESA) review, $100.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial, business and public buildings need the building permit and, at the end of the job, the occupancy certification and building inspection form described below; a commercial certificate of occupancy costs $100. Commercial solar facilities pay $5,000 per megawatt of power output, capped at $125,000; wind energy systems $5,000 per megawatt for each turbine, capped at $75,000; energy storage $5,000 per megawatt of nameplate capacity, capped at $50,000. The schedule says those fees cover both the special use permit and the building permit, with each permit charged the same amount, and the hearing for such a project costs $800. A new tower costs $25 per foot of height, and co-locating equipment on an existing commercial tower or replacing a major component $1,200.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Address: address requests are one of the county’s applications, and an address assignment costs $40.
- Property access: the office may ask for a property access permit or an affidavit; driveway and utility permits go through the online permit service linked from the county home page.
- Well and septic: approval from the Health Department may be requested with the application, and every new well needs a Health Department permit.
- LESA: agricultural land development reviews for building in the agricultural district.
- Survey: in rare cases, a legal survey, requested only after the site plan review when a property line or setback cannot otherwise be confirmed.
- Zoning relief: zoning changes, building setback, special or temporary use requests go through the Zoning & Building menu; a 10% administrative setback variance costs $75 and a Zoning Board of Appeals hearing $600.
- Floodplain: work in a special flood hazard area needs a $500 flood permit under the county’s flood ordinance.
Carroll County permit fees
The county’s building and zoning fees were updated on July 23, 2026, and the new schedule is posted on the Building Code & Occupancy page. After you submit an application, the county sends an invoice with payment instructions, and an online payment option is available. Rates for houses, additions and accessory buildings sit in section 1 of the schedule; ask the office for the figure for your plans. Fixed fees on the schedule include:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Demolition permit | $0 |
| Pool, above ground / in-ground | $50 / $100 |
| Personal solar, roof / ground | $50 / $100 |
| Moving a structure | $50 |
| Temporary use permit | $100 |
| Commercial certificate of occupancy | $100 |
| Flood permit | $500 |
| Address assignment | $40 |
| Land Evaluation and Site Assessment (LESA) | $100 |
| 10% administrative setback variance | $75 |
| Zoning Board of Appeals hearing | $600 |
| Commercial wind, solar or energy storage hearing | $800 |
| Guest home license, new / renewal | $250 / $100 |
| After-the-fact permit (late fee) | Double the permit fee |
| New tower / co-location on an existing tower | $25 per foot / $1,200 |
Health Department charges are separate. A real estate evaluation of a septic system, a well, or a water test costs $100 each, a return visit because the septic tank was not uncovered adds $50, and each extra water sample costs $100; evaluation fees are not refundable. The department also charges fees for new well permits.
Trade permits and who may pull them
Carroll County’s application list has no separate electrical, plumbing or mechanical permits, and its zoning and building pages show no contractor registration or local trade license. State rules still apply to the trades:
- Plumbers and roofers: these two trades are licensed by the state, plumbers by the Illinois Department of Public Health and roofing contractors under the state roofing license; the county pages add no registration of their own.
- Wells: every new well needs a Health Department permit and must be installed to the Carroll County codes and rules; abandoned wells must be sealed to the Illinois Water Well Construction Code and the county code.
- Commercial buildings: the owner works with a qualified inspector through every stage of construction, and the occupancy certification and building inspection form shows the state inspections were met; the office can provide a list of inspectors working in the area.
Rather not deal with the Carroll County building department?
Get a free quote →Inside Savanna, Mount Carroll and the other towns, any trade permits or contractor rules are set by that city or village.
How to apply for a Carroll County building permit
County permits apply outside the seven cities and villages; rural subdivisions such as Lake Carroll are county jurisdiction.
Check whether the project needs a building permit, or ask the office at 815-244-0284.
Follow the county’s site plan and building plan instructions before you start the online form.
Have the Health Department’s well and septic approval, an address and any property access permit ready in case they are requested.
Apply online, or start by phone or email; upload, email, mail or deliver the documents.
Pay the invoice online or by its instructions, and begin work once the permit is issued.
Review, corrections and what causes delay
Applications are answered in the order received, and an incomplete one cannot be reviewed. Typical holdups are a site plan that does not show setbacks clearly (which can lead to a request for a legal survey), missing well and septic approval or property access paperwork, and projects that need a Zoning Board of Appeals hearing, a LESA review or a flood permit first. Because the office is sometimes out on field work, email or phone ahead rather than walking in.
Inspections and occupancy in Carroll County
The county has no occupancy requirement for residential structures at this time. For commercial, business and other public buildings, state law requires occupancy certification: when the project is finished, an Occupancy Certification & Building Inspection Form must be submitted showing that the state requirements and inspections were met. To obtain occupancy you must work with a qualified inspector at every stage, starting before construction; call or email the office for a list of inspectors in the area. The commercial certificate of occupancy costs $100.
Want this handled start to finish?
Get a free quote →The Health Department carries out septic and well evaluations for property sales. The request must arrive at least 7 days before the evaluation date, processing takes at least 14 days, and visits happen only on Mondays, Tuesdays and Wednesdays. Uncover the septic tank’s inlet and outlet lids, do not pump the tank beforehand, and have someone home to let staff in and run the water.
Illinois building code in Carroll County
Carroll County requires permits under its Chapter 360 Building Regulations but disclaims building-code jurisdiction under the state’s residential and commercial building code statutes. FEMA’s Community Status Book lists Carroll County (community 170019, unincorporated areas) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated December 15, 1983 and its current map dated December 17, 2010; the county has no Community Rating System class.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Permit search and official resources
The Zoning & Building office keeps records of all zoning, building, subdivision and code violation activity in the county, and qualifying records are open to the public under the Freedom of Information Act; ask the office at zoning@carrollcountyil.gov or 815-244-0284. Building and zoning reports are also posted under the department’s menu.
- Carroll County Zoning & Building
- Applications and support documents
- Building code and occupancy
- Building and zoning fee schedule (July 2026)
- Carroll County Health Department, well and septic
- Health Department contacts
- Sewage and well evaluation request form
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Carroll County permit FAQs
Do I need a county permit at Lake Carroll?
Yes. Lake Carroll and the county’s other rural subdivisions are outside any city or village, so county applications apply there.
Does Carroll County issue permits in Savanna or Mount Carroll?
No. County applications cover land outside incorporated cities and villages; ask the city or village for work inside its limits.
How do I apply?
Online through the county’s application link, or start by phone at 815-244-0284 or by email; a site plan is needed for every application and a building plan for building permits.
What happens if I build without a permit?
The after-the-fact permit costs double the regular permit fee.
How much is a pool permit?
$50 for an above-ground pool and $100 for an in-ground pool.
Does the county inspect new houses?
The county’s pages describe no residential inspections, and there is no occupancy requirement for houses at this time. Commercial and public buildings need occupancy certification by a qualified inspector.
Who permits a new well?
The Carroll County Health Department in Mount Carroll (815-244-8855) issues permits for all new wells in the county.
Simplify Carroll County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Carroll County sooner?
Let Alliance prepare, file, and track your Carroll County permits while your crew stays on the job.
More Illinois permitting guides
Whiteside County
Read guide →Jo Daviess County
Read guide →Ogle County
Read guide →Cary Building Permit Guide
Read guide →Cass County Building Permit Guide
Read guide →Centralia Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Carroll County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.