Centralia, Illinois Building Permit Guide

To get a building permit in Centralia, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Centralia’s Community Development and Planning & Zoning department at 101 S. Locust Street handles building, demolition, sign and special use permits across the whole city, including the parts in Clinton and Washington counties.

Authority: Centralia Community Development and Planning & ZoningFiling: City building permit applicationPhone: 618-533-7622
Director
Gayla HartingCommunity Development & Planning & Zoning
Office
101 S. Locust StreetCentralia, IL 62801; fax 618-532-4534
Vacant buildings
RegistrationCity vacant building program
Food permit (Marion Co.)
$35–$75By risk class, Marion County Health Department

In Centralia, building permits come from the city’s Community Development and Planning & Zoning department, led by Director Gayla Harting, at 101 S. Locust Street (618-533-7622). The same department, working with code enforcement, enforces the city’s adopted International codes with local amendments and the zoning code, and handles demolition, sign and special use permits and the vacant building registry. Most residents live in the Marion County part, with about 2,258 in Clinton County; the Marion County Health Department keeps a branch office at 1013 N. Poplar.

What requires a building permit in Centralia?

The department’s page lists the permit and registration programs it runs, each with its own page or form:

City permits

  • Building permits, on the city’s building permit application
  • Demolition permits
  • Sign permits
  • Special use permits under the zoning code

Related city programs

  • Vacant building registration
  • Code enforcement, with a page for reporting violations
  • Property maintenance standards for existing buildings

The building permit application states the basic rule: before construction can begin, a building permit must be obtained and all permit fees paid. It covers four classes of work – new buildings, additions and alterations, repairs and relocations – so a repair or the relocation of a building is filed on the same form. The department posts no exemption list, so before a shed, fence or other small project, call 618-533-7622 and ask whether a permit is needed.

What Centralia decides and what the state holds

Centralia adopts its own codes with city amendments. Ordinance O25-21, passed on June 26, 2025 and in force ten days later, rewrote Section 6-1 of Chapter 6 of the Municipal Code to adopt the 2024 International Building, Existing Building, Residential, Property Maintenance and Mechanical Codes, and its companion Ordinance O25-20 adopted the 2024 International Fire Code with Appendices B, C, D, I and N. The department lists the 2024 editions of the International Building, Residential, Existing Building, Fire, Mechanical and Property Maintenance Codes, all with city amendments, together with the city’s zoning code regulations and the Centralia Municipal Code. The list names no electrical or energy code, so ask the department which electrical code applies. O25-21 repeals the building code’s Chapters 11, 13 and 29 and Parts IV and VII of the residential code, and says the Illinois Plumbing Code controls wherever the two conflict. Plumbing follows the Illinois Plumbing Code under plumbers licensed by the Illinois Department of Public Health, energy work follows the state energy code, and roofing contractors hold the state roofing license.

Short on time to read all of this?

Get a free quote →

Centralia building department: who handles permitting

The Community Development and Planning & Zoning department issues the city’s permits; the city describes its Planning & Zoning and Code Enforcement staff as enforcing the adopted codes within the City of Centralia. Under O25-21 the codes are administered by the city’s Department of Code Enforcement, whose head is the code official, and appeals follow Municipal Code section 09-53.

The city’s own documents give two addresses. The department’s web page lists 101 S. Locust Street and 618-533-7622, while the building permit application is headed “Centralia Planning Department, 222 S. Poplar” with 618-533-7623 and cityhall@cityofcentralia.org, and the vacant building form also says 222 South Poplar Street. Call before mailing or delivering an application to confirm where it should go.

Centralia permit contacts
OfficeContact
Community Development and Planning & Zoning (building, demolition, sign, special use permits)101 S. Locust Street, Centralia, IL 62801; 618-533-7622; fax 618-532-4534; Director Gayla Harting
Address on the building permit and vacant building formsCentralia Planning Department, 222 S. Poplar, Centralia, IL 62801; 618-533-7623 (also the code enforcement officer’s line); cityhall@cityofcentralia.org
Marion County Health Department, Centralia office1013 N. Poplar, Centralia, IL 62801; 618-532-6518; Monday to Friday 8 a.m. to 5:15 p.m.
Marion County Health Department, Environmental Health (Salem)118 Cross Creek Boulevard, Salem, IL 62881; 618-548-3878

The city reaches into four counties. Census figures put about 9,598 residents in the Marion County part and 2,258 in Clinton County, with a handful in Washington County and none counted in Jefferson County. City permits apply on every side of those county lines. Land outside the city limits is a county matter; see the Clinton County guide and the Marion County guide.

Centralia permit types

Each permit type has its own page under the department: building permits (a printable application), demolition permits, sign permits and special use permits, plus vacant building registration. Collect the application from the city’s site or the office at 101 S. Locust Street.

Residential permits

  • New homes and additions: the building permit application, built to the 2024 International Residential Code as amended by the city. The amendments repeal the code’s automatic sprinkler requirement for one- and two-family dwellings (listed in the ordinance as R309.2) and add Appendix BO on existing buildings and structures.
  • Repairs to existing homes: the 2024 International Existing Building Code and Property Maintenance Code set the standards for existing buildings.
  • Demolition: its own permit before a building is taken down.
  • Vacant buildings: the registration form asks the owner to choose a plan: rehabilitate from a stated date, demolish by a stated date, authorize the city to demolish, keep the house vacant but maintained under the property maintenance code, or, after a fire, claim a 90-day exemption from registration while repairing to reoccupy. A property manager named on the form is the person responsible for compliance.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and multifamily buildings follow the 2024 International Building, Fire, Mechanical and Existing Building Codes with city amendments. Plans and specifications for every building designed for public purpose must be approved and sealed by an Illinois-licensed architect or structural engineer. The city’s building code amendments require fire department connections to be a 5-inch Storz connection with a 30-degree bend, and the existing building code adds Appendix E for temporary emergency uses. Signs need a sign permit. A restaurant or other food business in the Marion County part of the city also needs a food permit from the Marion County Health Department, priced by risk class: $75 for Class I, $50 for Class II, $35 for Class III and $20 for a temporary permit. The application’s sign-off block shows who reviews a permit: plans and specifications, a zoning compliance review, and approval lines for the building official, the fire marshal, the city engineer, Public Works and others where needed.

What comes before the building permit

  • Zoning: check the property’s district on the city zoning map and the rules in the zoning code regulation book, both posted on the department page.
  • Special use: a use the zoning code allows only by special use needs a special use permit first.
  • County line: confirm the parcel is inside the city limits (the application asks this, with the county and property index number); outside them, Clinton or Marion County rules apply.
  • Sewage: the application asks whether the building uses public sewer or a private septic system and, if private, what type; in the Marion County part a septic permit comes from the Marion County Health Department.
  • Floodplain: the city is a participating community in the National Flood Insurance Program; a lot inside a mapped flood hazard area should be raised with the department at the first call.

Rather talk it over?

Call 1-855-478-4290 →

Centralia permit fees

The department’s page does not post a fee schedule for building, demolition, sign or special use permits. Ask the department at 618-533-7622 for the fee that applies before you file. Health Department fees for the Marion County part of the city are published by the Marion County Health Department:

Marion County Health Department permit fees
ItemFee
Food permit, Class I / Class II / Class III$75 / $50 / $35
Temporary food permit$20
Septic permit, new or replacement$75
New well permit$100
Existing well or well testing$25
Real estate inspection, septic / water$75 / $75

City building permit fees are set by the city, not the health department; the table above covers only the county health charges. The city’s application leaves a blank “permit fee” line for staff and asks the applicant for the valuation of work (total estimated cost), and Ordinances O25-20 and O25-21 say only that the codes provide for permits and the collection of fees, without amounts.

Trade permits and who may pull them

The department’s page lists building, demolition, sign and special use permits and no separate trade permit pages, and its adopted code list includes the 2024 International Mechanical Code. The building permit application lists the general contractor, the architect or engineer with a license number, and every sub-contractor, mechanical, electrical, plumbing and excavation included. Ask the department whether electrical, plumbing or mechanical work needs its own permit or goes on the building permit, and whether contractors must register with the city.

  • State licenses: a plumbing job in Centralia needs an IDPH-licensed plumber working to the Illinois Plumbing Code, and a reroof needs a contractor with the state roofing license.
  • Mechanical: heating and cooling work follows the 2024 International Mechanical Code with city amendments.
  • Septic and wells: in the Marion County part, a new or replacement septic system costs $75 and a new well $100 through the Marion County Health Department.

The city’s page does not say whether a homeowner may take out permits for their own work, so ask before you start.

Rather not deal with the building department?

Get a free quote →

How to apply for a Centralia building permit

1. Call the department

Describe the project at 618-533-7622 and ask which permits, plans and fees apply.

2. Check zoning

Look up the district on the zoning map and the rules in the zoning code regulation book.

3. Clear special uses

If the use needs a special use permit, get it before the building permit.

4. Complete the application

Fill in all six parts of the city’s building permit application, including the valuation of work and the list of sub-contractors, and prepare plans to the 2024 codes the city enforces.

5. Draw the plot plan

To scale, with a north arrow: lot size, existing buildings, distances from every property line, adjacent streets and easements, and driveways, sidewalks and parking.

6. Submit and pay

Return the signed application to the department (confirm 101 S. Locust Street or 222 S. Poplar by phone) and pay the fee it sets; a food business in the Marion County part also needs the Health Department food permit.

Review, corrections and what causes delay

The department reviews applications against the 2024 codes and city amendments. A use that needs a special use permit, or a site in a mapped flood hazard area, adds steps to discuss with the department, and a parcel just outside the city limits goes to the county instead. By signing, the owner certifies that the work will follow the attached plans and plot plan and the city’s building and zoning ordinances, and that no changes will be made without first getting the city’s approval, so a change in the field means going back to the department.

Inspections in Centralia

Centralia’s department page lists no inspection schedule. When your permit is issued, ask the office at 618-533-7622 at which stages it wants to see the work and how to request each visit. After construction, buildings stay under the 2024 International Property Maintenance Code, which the Planning & Zoning and Code Enforcement Department enforces; the city has a code enforcement officer (618-533-7623) and a page for reporting violations; typical complaints involve trash or debris, piles of sticks or limbs, foul odors and inoperable vehicles. The city’s amended maintenance code requires premises to be kept free of weeds or plant growth over 8 inches (the city may cut them and bill the owner after notice), insect screens from May 1 to October 31, and, in rentals, heat from October 1 to April 30 that keeps habitable rooms, bathrooms and toilet rooms at 68°F or more. Vacant buildings fall under the city’s registration program.

Want this handled start to finish?

Get a free quote →

Illinois building code in Centralia

The department’s adopted list: 2024 International Building, Residential, Existing Building, Fire, Mechanical and Property Maintenance Codes, each with city amendments, plus the city’s zoning code and Municipal Code. FEMA’s Community Status Book lists the City of Centralia (community 170453, in Washington, Jefferson, Clinton and Marion counties) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated December 18, 1984 and its current map dated November 16, 2011; the city has no Community Rating System class.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Permit search and official resources

The city’s page offers no online permit search. For a past permit or zoning record, call the department at 618-533-7622 or ask at 101 S. Locust Street.

Inspections are where schedules slip.

Get a free quote →

Centralia permit FAQs

Who issues building permits in Centralia?

The city’s Community Development and Planning & Zoning department at 101 S. Locust Street (618-533-7622), led by Director Gayla Harting.

Which building codes does Centralia enforce?

The 2024 International Building, Residential, Existing Building, Fire, Mechanical and Property Maintenance Codes, each with city amendments.

How much is a building permit in Centralia?

No fee table is posted on the department’s page; the office at 101 S. Locust Street quotes the fee for each permit.

My house is in the Clinton County part of Centralia. Who permits it?

The City of Centralia. City permits apply inside the city limits in every county the city reaches.

Do I need a permit to tear down a building?

Yes. The city has a separate demolition permit.

Does a new house in Centralia need fire sprinklers?

Not under the city’s residential code: Ordinance O25-21 repeals its automatic sprinkler requirement for one- and two-family dwellings (section R309.2).

Where do I deliver a Centralia permit application?

The web page gives 101 S. Locust Street (618-533-7622), but the application form says 222 S. Poplar (618-533-7623); call first to confirm.

How much is a food permit for a new restaurant?

In the Marion County part of the city, $75 for Class I, $50 for Class II and $35 for Class III from the Marion County Health Department.

Simplify Centralia permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Centralia sooner?

Let Alliance prepare, file, and track your Centralia permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Centralia permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.