Skip to main content
Municipal GuideIllinoisBridgeview · Cook County

Bridgeview, Illinois Building Permit Guide

To get a building permit in Bridgeview, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Bridgeview’s Building Department at Village Hall, 7500 S. Oketo Avenue, takes permit applications and inspection requests online and requires City of Chicago-licensed electricians.

Authority: Bridgeview Building DepartmentFiling: BS&A OnlinePhone: 708-594-2525
Authority
Building Department7500 S. Oketo Ave., Bridgeview
Hours
Wed until 8 p.m.Mon–Fri from 8; Sat 9–1
Electricians
Chicago licenseChicago Electrical Code applies
Permit life
180 daysUnless work is substantially under way

The Village of Bridgeview issues its own building permits through the Building Department at Village Hall, 7500 S. Oketo Avenue (708-594-2525), directed by Rich Struzik ((708) 924-8031). Applications and inspection requests can be made online through the village’s BS&A portal, every application doubles as a zoning certificate request, and the village enforces the City of Chicago Electrical Code with Chicago-licensed electricians. A permit lapses after 180 days unless the work is substantially under way.

What requires a building permit in Bridgeview?

The Bridgeview zoning ordinance says no building or structure may be erected, built, rebuilt, enlarged, moved or structurally altered, and no excavation or grading for one may be done, without a building permit. The village’s Application for Building and Zoning Permit lists the classes of work it covers:

Classes of work

  • New buildings and additions
  • Alterations and repairs
  • A change in the use of a building
  • Demolition and moving a building
  • Plumbing, heating, air conditioning, sprinkler, electrical and elevator work, each inspected separately

Related village filings

  • Electrical work permits signed by the supervising electrician
  • Solar panel applications with a roof structural checklist
  • Rental property registration
  • Registration of vacant or foreclosed property
  • Zoning hearings for variations, special uses, rezonings, resubdivisions and planned unit developments

Garages and sheds must sit at least 5 feet from side and rear lot lines and, in residential districts, at least 10 feet from the house, plus another foot for each foot that a parallel wall runs past 20 feet. An accessory building may take up no more than 40% of the required rear yard, may not exceed 15 feet in height there, and may not be built before the main building. Fences in a front yard are limited to 39 inches; side and rear fences may reach 6 feet. Pools at homes must be surrounded by a safety fence.

What Bridgeview decides and what the state holds

The village chooses its own codes and amendments, sets fees by Board schedule, licenses contractors and runs zoning hearings through its Zoning, Planning and Development Commission. Electrical work is the clearest local choice, since Bridgeview applies the Chicago code and asks for a Chicago electrical license. The Illinois Plumbing Code governs plumbing, done by state-licensed plumbers, roofers need their state license, and the Illinois energy code applies throughout.

Bridgeview building department: who handles permitting

The zoning ordinance names the Director of Buildings and Inspectional Services as the official who issues zoning certificates and certificates of occupancy, inspects buildings and land, and orders illegal work stopped; the Building Department carries out that role for property inside the village. Parcels in unincorporated Cook County are permitted by the county’s Department of Building and Zoning.

Short on time to read all of this?

Get a free quote →
Bridgeview permit contacts
DetailInformation
OfficeBuilding Department, Village Hall, 7500 S. Oketo Avenue, Bridgeview, IL 60455
DirectorRich Struzik, (708) 924-8031
Village Hall708-594-2525; fax 708-924-8095; info@villageofbridgeview.com
HoursMonday, Tuesday, Thursday and Friday 8 a.m. to 6 p.m.; Wednesday 8 a.m. to 8 p.m.; Saturday 9 a.m. to 1 p.m.
OnlineBS&A Online: apply for a permit, schedule an inspection, other building services
Building Department line708-594-2525, option 3
Zoning bodyZoning, Planning and Development Commission, (708) 924-8030

Bridgeview permit types

Bridgeview offers two building applications. The two-page Application for Building and Zoning Permit lists the owner, general contractor and each trade with phone and address, the class of work and the building size. The four-part Application for Plan Examination and Building Permit collects setbacks, height, lot and building areas, residential units, parking and basement space, then has separate parts for electrical service and circuits, plumbing fixtures and mechanical units.

Residential permits

House additions, garages and remodels need drawings, since the village’s contractor notice states that no permit is issued without them, plus a plat of survey and the real estate tax index number. Rooftop solar has its own 2025 application. It asks for a site plan and a framing cross-section showing rafters or trusses, spacing, span and roof slope, specification sheets for modules, inverters and mounting, and a 3-foot clear space at the ridge, or around the equipment on a flat roof. A system weighing more than 5 pounds per square foot may need a statement from an Illinois structural engineer, and an array within 3 feet of the sides or ridge may need fire service review.

Two registrations sit alongside the permit system. A landlord files the rental property registration each year for $150 and, at the time of registering, must book a Building Department inspection and make every area and unit accessible to the inspector. A vacant or foreclosed property, whether or not someone is living in it, is registered on a separate form with a $300 fee due every six months. Questions on either go to the Building Department at 708-594-2525, option 3.

Commercial permits

Commercial and new construction projects submit three sets of prints by an architect or engineer, one of them stamped, along with a site plan, floor plans and one copy of the topography of the whole lot and street on a 50-foot grid with U.S. Geological Survey grades. The plan examination form records elevators, enclosed and outdoor parking, office and manufacturing floor areas, fire sprinkler heads, standpipes and kitchen exhaust hoods.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning certificate. Each building permit application is also an application for a zoning certificate. It needs plans in duplicate and a certificate from an Illinois architect or structural engineer, or, if neither was used, affidavits from the owner and builder that the work complies.
  • Variations. File the application in duplicate with the Village Clerk. The Zoning, Planning and Development Commission must hold the hearing within 60 days, with newspaper notice 15 to 30 days ahead and written notice to owners within 150 feet, delivered in person or by certified mail and backed by a sworn affidavit. A recommendation needs four concurring commission votes, and the Mayor and Board of Trustees make the final decision. Relief can cover setbacks, lot size, parking, sign area, height, floor area ratio and lot coverage; the Board’s order lapses after 180 days unless a building permit is obtained and work begins, with one 180-day extension available on written request. The hearing application, from the commission’s office at (708) 924-8030, is sworn before a notary and lists each zoning ordinance section to be varied; attach proof of ownership (a deed or title insurance policy), the owner’s written consent if someone else applies, a survey, a plat of parking spaces for parking relief, and plans of the improvements. It is not officially accepted until all fees are paid, and the applicant also agrees to cover the village’s reasonable expenses in reviewing it.
  • Special uses. Applications go to the commission, which must send its recommendation to the Board within 60 days of closing the hearing; the Board then has 45 days to deny or grant by ordinance, and silence counts as denial. A special use permit only clears the way to apply for building permits, and it expires after one year unless construction has begun or a certificate of occupancy has been issued.
  • Other zoning actions. Rezonings, resubdivisions and planned unit developments each have their own hearing application, and the Director may issue temporary permits for uses a district allows on a temporary basis.
  • Stormwater. Bridgeview is not on MWRD’s list of authorized municipalities, so projects that trigger the Watershed Management Ordinance, such as development disturbing more than half an acre, get their permit from MWRD. Locally, the village’s 2025–2026 stormwater (MS4) report cites Ordinance 6-19 for erosion and sediment control and Ordinance 6-20 for post-construction runoff. Developments over one acre need erosion controls, a Notice of Intent before construction and a stormwater pollution prevention plan with the plan set; Novotny Engineering reviews them for the village, and developers file weekly inspection reports.

Bridgeview permit costs and fees

Under section 12.11 of the zoning ordinance, the Mayor and Board of Trustees set the fees for building permits, zoning certificates, certificates of occupancy, variations, special uses, amendments and planned developments. The village does not post that schedule on its Building Department page, so the amount is worked out on the application: the plan examination form adds a building permit fee, a plan review fee and other fees, and the building and zoning form lists separate inspection charges for building, plumbing, air conditioning, sprinklers, electrical, heating and elevators.

Rather talk it over?

Call 1-855-478-4290 →
Bridgeview fee rules from village documents
ItemRule
Fee scheduleSet by the Mayor and Board of Trustees (zoning ordinance s.12.11)
When paidNo application counts as filed, and no action is taken, until fees are paid to the Village Clerk
RefundsNone, under any circumstances
Contractor security$10,000 surety bond and at least $1,000,000 liability insurance naming the village
Cash bondListed on the contractor permit checklist
Rental property registration$150 a year, with a Building Department inspection booked at registration
Vacant or foreclosed property registration$300, due every 6 months
Violations$100 to $500 per offense, each day a separate offense

Beyond the two registration fees, the department fills in the permit, plan review and inspection charges on the application.

Because fees are not refunded, confirm the scope and the expected charge with the Building Department at 708-594-2525 before paying, and ask whether a cash bond applies to your job.

Trade permits and who may pull them

Contractors apply for a Bridgeview contractor license with a copy of a driver’s license, a $10,000 surety bond and an insurance certificate naming the village, and they sign the village’s contractor and trade agreement. The license form asks for State of Illinois license numbers from electricians, roofers, plumbers and alarm system contractors.

  • Electrical: the electrical work permit is signed by the supervising electrician, and the village notes that the electrician must be licensed by the City of Chicago because it follows the Chicago Electrical Code.
  • Plumbing: attach a copy of the plumber’s license; plumbing follows the Illinois Plumbing Code.
  • Roofing: attach a copy of the state roofing license.
  • Mechanical: HVAC contractors are named on the application, and the plan examination form counts furnaces, boilers, air handlers and similar units.

The building and zoning permit form is signed by the owner, who acknowledges having read it and agrees to follow village ordinances and state building laws.

Rather not deal with the building department?

Get a free quote →

How to apply for a Bridgeview building permit

1. Check zoning

Look up the lot on the zoning map and settle any variation or special use first.

2. License the contractors

Each contractor files the license application, bond and insurance with the village.

3. Pick the application

Use the building and zoning permit for simple jobs or the plan examination form for reviewed projects.

4. Gather the checklist items

Drawings, plat of survey, tax index number, contract and valuation, license copies and the cash bond.

5. Submit online or at Village Hall

Apply through BS&A Online or bring the package to 7500 S. Oketo Avenue during customer service hours.

6. Pay and begin

Pay the Village Clerk and start work within 180 days.

Review, corrections and what causes delay

The Director must issue or refuse the zoning certificate within 15 days of receiving the application and explain any refusal in writing. If no decision comes, the applicant may file a written demand; three days after that, the silence counts as a denial that can be appealed to the Zoning, Planning and Development Commission. Appeals of the Director’s decisions are filed with the Village Clerk; the commission makes findings, the Board decides, and the appeal normally halts enforcement of the decision until then. The contractor notice warns that items left off the checklist stop processing, and drawings are always required.

Inspections in Bridgeview

Inspections can be requested online through the BS&A Online inspection page. By signing the plan examination application, the applicant allows the code official’s representative to enter the permitted areas at any reasonable hour to enforce the codes. The building and zoning permit form carries separate inspection fee lines for building, plumbing, air conditioning, sprinkler, electrical, heating and elevator work.

No new, enlarged or altered building, or changed use, may be occupied until the Director issues a certificate of occupancy, which follows completion and an inspection against the approved plans. A temporary certificate can cover up to six months while an addition is finished or a building is partly occupied. The village must issue the certificate, or explain in writing why not, within 15 days of being told in writing that the building is ready, and a certificate lapses if the use is not established within 90 days.

Illinois building code in Bridgeview

The Building Department page lists the 2024 International Building, Residential, Mechanical and Fire codes, the current Illinois Plumbing Code, the current City of Chicago Electrical Code, the 2015 NFPA 101 Life Safety Code and the current Illinois energy code; the village’s 2022 notice to contractors still shows the 2021 editions, so check which applies to your filing date. FEMA’s Community Status Book lists the Village of Bridgeview (community 170065) as participating in the National Flood Insurance Program, with its flood map effective August 19, 2008.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Bridgeview permit search and official resources

Older permit files and inspection records are requested under the Freedom of Information Act. Download the village’s request form and mail it to Village of Bridgeview FOIA, 7500 S. Oketo Avenue, fax it to 708-924-8095 or email foia@villageofbridgeview.com; questions go to 708-924-8082. The village answers within five business days, and the first 50 pages are free, then 15 cents a page.

Inspections are where schedules slip.

Get a free quote →

Bridgeview building permit FAQs

Can I apply for a Bridgeview permit online?

Yes. The Building Department links to BS&A Online for permit applications and inspection requests.

Does my electrician need a Chicago license?

Yes. Bridgeview follows the City of Chicago Electrical Code and says the electrician must be licensed by the City of Chicago.

How long does a permit last?

180 days from issue unless the work is substantially under way by then.

How far must a garage be from the lot line?

At least 5 feet from side and rear lot lines and 10 feet from the house in residential districts, no taller than 15 feet in the rear yard.

How tall can a fence be?

Up to 39 inches in a front yard and 6 feet in side and rear yards.

Who decides zoning variations?

The Zoning, Planning and Development Commission holds the hearing within 60 days of filing and recommends; the Mayor and Board of Trustees grant or deny.

Do landlords have to register with Bridgeview?

Yes. Rental property registration costs $150 a year, and the owner books a Building Department inspection when registering.

Are permit fees refundable?

No. The zoning ordinance says fees paid to the Village Clerk are not refunded in any event.

Simplify Bridgeview permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bridgeview sooner?

Let Alliance prepare, file, and track your Bridgeview permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Bridgeview permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.