The Village of Pinecrest Building Department issues building, electrical, plumbing, gas and mechanical permits for the village, and plans are accepted only in digital form through the eTRAKiT portal or at the counter at 12645 Pinecrest Parkway. New homes and additions are charged $3.06 per square foot, and the village says complete, code-compliant applications typically take from a couple of weeks to 30 days.
What requires a building permit in Pinecrest?
Pinecrest’s permit FAQ says most work that builds, enlarges, alters, repairs, moves or replaces structural, electrical, gas, plumbing or mechanical systems needs a permit, and the village takes separate applications for grading, demolition, mechanical, electrical, plumbing and general building work. Its checklist page covers these project types:
Homes
- New homes and additions
- Alterations and remodeling, including kitchens and bathrooms
- Roofs, windows, doors and shutters
- Fences, walls and driveways
- Pools, spas and pool decks
- Screen enclosures, chickee huts and basketball or tennis courts
- Generators, electrical, plumbing/gas and mechanical work
- Demolition
Low-cost work (from July 1, 2026)
- Under HB 803, work worth less than $7,500 in materials and labor may not need a building permit, for example cabinets, flooring or drywall finishing
- You still apply: send the Permit Exemption Request Form with a scope of work and a contract or proof of value, and wait for the Building Department’s decision
- Not exempt: electrical, plumbing, gas, mechanical and structural work (windows, doors, roofing, sheds, wind-resistant fences) and any work in a flood hazard area
- Non-wind-resistant fences need a zoning permit
Starting work without a permit carries a $100 charge plus a double permit fee, and the FAQ warns that violators may be fined $500 a day. A permit is only in force once it has been paid for and issued.
Pinecrest building department: who handles permitting
| Detail | Information |
|---|---|
| Office | 12645 Pinecrest Parkway, Pinecrest, FL 33156 |
| Phone | 305-234-2121 |
| Hours | Permit processing M-F 8:00 a.m.-2:00 p.m.; inquiries M-F 8:00 a.m.-4:30 p.m. |
| building@pinecrest-fl.gov (contractor renewals: renewals@pinecrest-fl.gov) | |
| Inspection request line | 305-234-2111 |
| Fax | 305-234-2131 |
Short on time to read all of this?
Get a free quote →The Building Department handles building and trade permits for the whole village. Some projects also need approval from Miami-Dade County agencies such as DERM, the Department of Health or the Fire Department; those reviews are filed through the County’s own portal once you have a Pinecrest permit number.
Filing in eTRAKiT and the forms Pinecrest uses
Since January 2025 the village accepts only digital plans; paper submissions can be converted for an extra fee. To file online, log in to a contractor or public eTRAKiT account, choose Apply / New Permit, pick the permit type and subtype, and enter the description and job value (the contract amount). Attach files using the village’s File and Description Naming Requirements, then add the applicant, contractor and owner details and submit.
At the counter, the application must be signed and notarized by the owner (or the owner’s representative) and a registered contractor, or by the owner alone for an owner-builder permit, with two sets of plans. Plan sheets may be no larger than 30” x 42”. The department may ask for the signed contract to calculate fees.
- Contractor Registration Form, notarized, with copies of the Florida contractor’s licence, Local Business Tax receipt, general liability and workers’ compensation certificates (or exemption) and a driver’s licence. Without registration a contractor cannot apply, pay fees or see permit information.
- Owner-Builder Requirements Form for owners doing their own work.
- Survey Affidavit when the signed and sealed survey is more than 2 years old.
- Form 402-2020 with the EPL Display Card, Manual J calculations and the Grading and Drainage Plan Checklist for new homes and additions.
- Permit Exemption Request Form for work claimed under the $7,500 exemption.
Permit costs and fees in Pinecrest
Fees come from the village’s Building Permit Fee Schedule, effective January 4, 2021. A non-refundable up-front processing fee of 30% of the estimated permit fee is paid when the application is received and credited toward the final fee.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| New home or addition (includes MEP, roof, doors and windows, driveway and zoning review) | $3.06 per sq ft |
| Alterations and repairs | $0.04 per $1 of estimated cost, $136 minimum |
| Kitchen remodel (MEP included) | $680 |
| Bathroom remodel, up to 2 / 3 or more | $544 / $612 |
| Roofing or re-roofing | $0.30 per sq ft of roof, $136 minimum |
| Windows or doors | $340 |
| Fence (not concrete) / concrete wall | $170 / $340 |
| Swimming pool or spa (MEP included) / pool deck | $680 / $136 |
| Screen enclosure, awning or storm shutters | $170 |
| Driveway or parking lot | $170 |
| Prefabricated shed with slab, up to 100 sq ft | $97.75 |
| Demolition, per structure | $272 |
| Minimum building permit | $136 |
| Re-inspection | $68 |
Building permits other than electrical, plumbing and mechanical also carry a solid waste surcharge of $0.20 per $100 of estimated value ($25 minimum, $500 maximum), and a 3% state surcharge is added to building permits. For example, a 500 sq ft addition has a base fee of $1,530 before those surcharges.
Expedited plan review costs 25% of the building permit fee, and an express re-review of corrections costs $68. A 90-day extension of a live permit is $135, a lost permit card $61, and a major plan revision after issuance 50% of the original permit fee.
Electrical, plumbing, gas and mechanical permits in Pinecrest
The Building Department issues all trade permits. On a new home, addition, kitchen remodel or pool, the trade work is included in the building fee; stand-alone trade permits are priced separately:
| Permit | Fee |
|---|---|
| Electrical, stand-alone | $170 |
| Plumbing, stand-alone (single-family) | $170 |
| Gas installation or appliance | $170 each |
| Mechanical / air conditioning, stand-alone | $170 |
| Fire alarm system, new | $305.53 |
| Minimum electrical, plumbing or mechanical permit | $136 |
| Additional inspection | $68 |
Rather talk it over?
Call 1-855-478-4290 →Generators have their own checklist: diesel and gasoline units need DERM approval but no gas permit, while gas units need a plumbing/gas permit. Demolition needs a sewer cap plumbing permit finaled first, an FPL clearance letter and a refrigerant letter from a mechanical contractor.
Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
How to apply: 6-step Pinecrest process
Find the permit submission checklist for your project on the village’s All Permits page and gather what it lists.
Contractors register with the village first; owners complete the Owner-Builder Requirements Form.
Get any tree removal or relocation permit, and a Health Department septic permit if you add living space on septic, before the building permit can be issued.
Enter the job value, upload files named to village rules and pay the 30% up-front processing fee.
Corrections are not accepted while any discipline is still reviewing, and partial corrections are refused. If County agencies must review, file with Miami-Dade using your Pinecrest permit number, then upload the final watermarked set.
Once approved and paid, contact the department to activate the permit; it sends a ShareFile link to the approved plans, usually within 24 hours, and you print the permit card from your dashboard.
Rather not deal with the building department?
Get a free quote →Inspections in Pinecrest
Contractors schedule inspections in eTRAKiT (public accounts can view results but cannot schedule), by phone on the inspection request line at 305-234-2111, or by text to 855-606-2224 after opting in, using SCHEDULE, RESCHEDULE, CANCEL or RESULTS with the permit number and inspection code. Requests made between 8:00 a.m. and 3:30 p.m. are scheduled for the next business day, and the inspector may arrive within a 2–3 hour window.
Stormwater inspections are only done on Monday, Tuesday and Wednesday. To cancel, call on the inspection day and speak to the inspector between 8:30 and 9:00 a.m. The permit card lists the minimum inspections; book any extra ones the full scope needs. The card and approved plans must be on site, or the inspection fails, and each re-inspection costs $68.
A permit expires after 180 days without an approved inspection.
Local Pinecrest details that matter
Notice of Commencement: required for projects over $2,500; record it with the Miami-Dade County Clerk and post it on site before the first inspection.
Trees and landscaping: tree removal and relocation permits come before the building permit, and new homes need a landscape plan under the Landscape for New Construction checklist.
Zoning and design review: demolition, new construction and changes to a building’s size or appearance may need design review, and projects that don’t meet setbacks or floor-area limits need a variance first.
Time limits: the village expects work to start within six months of issue and inspections to be approved at least every six months after that.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Pinecrest permit FAQ
How much is a building permit in Pinecrest?
New homes and additions cost $3.06 per square foot, alterations $0.04 per dollar of estimated cost, and the minimum building permit is $136. A 30% processing fee is paid up front and credited to the total.
Do I need a permit for a fence or roof in Pinecrest?
Yes. A fence permit is $170 ($340 for concrete) and roofing is $0.30 per square foot with a $136 minimum. A fence that is not wind-resistant needs only a zoning permit.
Want this handled start to finish?
Get a free quote →Is small work under $7,500 exempt?
From July 1, 2026, some work worth less than $7,500 may be exempt, but you must submit a Permit Exemption Request Form and get the department’s decision. Electrical, plumbing, gas, mechanical, structural and flood-zone work still needs a permit.
How long does plan review take?
The village says complete, code-compliant applications typically take a couple of weeks to 30 days. Expedited review costs 25% of the building fee.
Can a homeowner pull a permit?
Yes, as an owner-builder. Complete the Owner-Builder Requirements Form; the owner alone signs and notarizes the application.
How are inspections scheduled?
Through eTRAKiT (contractor accounts), by calling 305-234-2111 or by texting 855-606-2224. Requests made between 8:00 a.m. and 3:30 p.m. are scheduled for the next business day.
What are the Building Department counter hours?
Permit processing runs Monday to Friday, 8:00 a.m. to 2:00 p.m.; general inquiries are answered until 4:30 p.m. at 305-234-2121.
Pinecrest permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Inspections are where schedules slip.
Get a free quote →- Florida Building Commission — 8th Edition (2023)
- Contractor Registration
- Building Permit Fee Schedule
- Scheduling Inspections
- All Permit Checklists
- Apply for a Permit
- Pinecrest Building Department
- Permit FAQ
- Permit extensions
- Pinecrest eTRAKiT permit portal
- Pinecrest $7,500 permit exemption
- Pinecrest plan requirements for permits
- Miami-Dade County electronic plans submittal portal
Simplify Pinecrest permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Pinecrest sooner?
Let Alliance prepare, file, and track your Pinecrest permits while your crew stays on the job.
More Florida permitting guides
Miami-Dade County
Read guide →Aventura
Read guide →City of Miami
Read guide →Pinellas County Building Permit Guide
Read guide →Pinellas Park Building Permit Guide
Read guide →Plant City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Pinecrest permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.