The City of Pinellas Park’s Building Development Division issues building and trade permits for property inside the city, through its online Plans, Permits & BTRs portal or the counter at 6051 78th Avenue N. Home permit fees start at $75 and are based on the value of the work, and the city says most permits are issued within 10 business days once every required document is in.
What requires a building permit in Pinellas Park?
The city points to its Land Development Code for what does and does not need a permit; most major projects need one, and some minor work can be done without a permit as long as it meets code. The permit application and the city’s forms cover these permit types:
Permits the city issues
- Building: new homes, additions, alterations, accessory dwelling units
- Roofing (with a dry-in inspection)
- Electrical, plumbing, mechanical, gas and refrigeration, including AC changeouts
- Fences, signs and temporary signs
- Fire alarm, fire sprinkler and fire life safety
- Engineering (site work, driveways, drainage) and right-of-way work
- Landscape, tree removal and land clearing
- Temporary power
Plans anyone can draw
- Above-ground pools and spas
- Driveways
- New or repaired fences
- Patios and sidewalks
Since May 23, 2024, the Land Development Code requires a permit for every exterior entry door and garage door, and new homes must be built on stem walls instead of lot fill. Work started without a permit gets a stop work order and double permit fees, and covered work may have to be opened up for inspection.
Pinellas Park building department: who handles permitting
| Detail | Information |
|---|---|
| Local office | 6051 78th Avenue N, Pinellas Park, FL 33781 |
| Phone | 727-369-5647 |
| Hours | Monday-Friday, 8:00 a.m.-4:30 p.m. |
| Building Official | John Raposo, jraposo@pinellaspark.gov |
| Permit questions | permits@pinellaspark.gov |
| Inspection requests | inspections@pinellaspark.gov |
| Insurance certificates | coi@pinellaspark.gov |
| Mailing address | P.O. Box 1100, Pinellas Park, FL 33780-1100 |
Short on time to read all of this?
Get a free quote →Who can pull a permit and the forms Pinellas Park uses
Permits are issued to licensed contractors, to a contractor’s agent carrying a notarized letter of authorization, and to property owners for work on an owner-occupied single-family home. The applicant’s identity is checked at issue with a Florida driver’s licence, state ID or other photo ID.
Before any contractor can apply, the city needs a certificate of insurance for general liability and workers’ compensation (or a workers’ comp exemption certificate) naming the City of Pinellas Park Building Development as certificate holder, sent to coi@pinellaspark.gov. Out-of-state insurers must show the workers’ comp cover is valid in Florida.
- Building Permit Application (8th Edition), with sections for mechanical, electrical, plumbing and gas information.
- Home Owner Affidavit (Owner/Occupant Affidavit) when the owner acts as the contractor.
- Contractors Authorized Signee Form for agents.
- Sign On forms for building, electrical, plumbing, mechanical, gas, refrigeration and fire subcontractors, who must register their licence with the city and sign for their part of the work.
- Engineering Permit Application, Landscape Application and Utility ROW Application for site and right-of-way work.
- AC Changeout, Fence, Sign and Temporary Power applications for smaller jobs.
- Notice of Commencement, required for work over $2,500, and the Revision Resubmittal Form for changes.
Pinellas Park building permit cost
The city publishes estimated building permit fee worksheets for homes and for other buildings, both revised October 24, 2023. Building and engineering fees are based on the value of the work, meaning what it would cost to hire a contractor to do it.
| Project | Fee |
|---|---|
| One- and two-family: work up to $1,000 | $75 |
| One- and two-family: $1,001–$50,000 | $75 for the first $1,000 + $5.75 per additional $1,000 |
| One- and two-family: $50,001–$100,000 | $356.75 for the first $50,000 + $4.75 per additional $1,000 |
| One- and two-family: over $100,000 | $644.25 for the first $100,000 + $3.75 per additional $1,000 |
| Other buildings: work up to $1,000 | $100 |
| Other buildings: $1,001–$50,000 | $100 for the first $1,000 + $7 per additional $1,000 |
| Other buildings: $50,001–$500,000 | $443 for the first $50,000 + $6 per additional $1,000 |
| Other buildings: over $500,000 | $3,143 for the first $500,000 + $3 per additional $1,000 |
| Plan review | 50% of the permit fee subtotal, paid at submittal |
| Landscape clearing and grubbing | $75 per acre (homes), $100 per acre (other) |
Not sure this scope needs a permit?
Get a free quote →For example, a home remodel valued at $40,000 has a building permit fee of $299.25 before plan review, trade and technology fees.
A technology fee is added to each permit: $2 for a $75 permit, $5 up to $125, $10 up to $1,000 and $20 above that. New homes and bedroom additions may owe parkland and library dedication fees, new buildings and interior build-outs may owe multi-modal impact fees, and new water meters and sewer taps are charged separately. Fees can be paid by cash, personal check, credit card or money order.
Trade permits in Pinellas Park
The Building Development Division issues electrical, plumbing, mechanical, gas, refrigeration and fire permits. Trade fees are charged by the square footage of the work area:
| Permit | Fee |
|---|---|
| Electrical, plumbing or mechanical, one- and two-family | $0.05 per sq ft, $75 minimum |
| Electrical, plumbing or mechanical, other buildings | $0.05 per sq ft, $100 minimum |
| Fire life safety, other buildings | $0.05 per sq ft, $100 minimum |
Each trade contractor signs on to the permit with the matching Sign On form. Electrical plans need a riser diagram, plumbing plans need water and sewer risers, and mechanical plans show the HVAC layout, condensate runs and makeup air. Electrical load calculations are not needed for a home addition under 500 sq ft. Gas work must be done by a certified gas contractor.
Plans and documents Pinellas Park asks for
Electronic submissions through the portal are preferred. For paper filings the city asks for three sets of signed and sealed plans for residential projects and five for commercial projects.
Rather talk it over?
Call 1-855-478-4290 →New home or addition
- Building permit application, Landscape Application and Notice of Commencement
- Owner/Occupant Affidavit if the owner is the contractor
- Engineering permit if the job touches a driveway, drainage, public sidewalk, water or sewer, or other site work
- Site plan or survey with setbacks, trees to be removed, elevations and driveways
- Floor plan with electrical, plumbing, gas and mechanical layouts
- Wall section and roof framing plan, with the truss manufacturer if trusses are used
- Drawings sealed by an architect or engineer, plus energy calculations
Commercial
- Signed and sealed architectural plans with details, product approvals and energy calculations
- Electrical, plumbing and mechanical plans
- Fire alarm and fire sprinkler plans with riser information
- Engineering site plan with silt fence, track-out and sealed civil drawings where needed
- Right-of-way plans and any construction bond
Simple jobs can sometimes be permitted on the first visit. The city says most permit applications are reviewed and issued within 10 business days once all required documents are in.
How to get a building permit in Pinellas Park
Check the property is inside Pinellas Park and which building, trade, engineering and landscape permits the work needs.
Contractors send general liability and workers’ comp certificates to coi@pinellaspark.gov; owner-builders complete the Owner/Occupant Affidavit.
Apply in the Plans, Permits & BTRs portal (or at the counter) with the description of work, owner details, square footage and valuation, and upload the plans.
Half the estimated permit fees is due at submittal; the division then checks the plans against the building, setback and landscape codes.
Pay the remaining building, trade, engineering, landscape, technology and any parkland or library fees at issue, and have each subcontractor sign on.
Request each inspection at least one working day ahead through the portal or by email, through to final.
Rather not deal with the building department?
Get a free quote →Inspections in Pinellas Park
Request inspections at least one working day in advance, either in the building permit online portal or by email to inspections@pinellaspark.gov with the permit number, trade, inspection type, address, contractor name and a contact phone number. The property owner is responsible for making sure inspections are called in, even when the contractor does it.
The city’s inspection guidelines set out the order for a new home: urban forestry check before any site clearing, footing, first plumbing rough, slab, tie beam or lintel, first electrical rough, sheathing, second plumbing rough, first mechanical rough, gas rough-in and pressure test, framing, drywall, sewer and water service, then the trade and building finals. A few local rules stand out:
- Slab inspections need a compaction test if there is more than 24” of fill.
- No tie beam inspection is done without a survey on site showing finished floor elevations and setbacks.
- Gas piping is pressure tested and left tagged for 24 hours.
- Roofs need a dry-in inspection.
A red tag with a fee must be paid and the work corrected before the re-inspection. The Certificate of Occupancy is issued once all inspections are finalized, red tags and transportation impact fees are paid and a final survey is in. Permits generally expire after 180 days if no inspection has been made.
Local Pinellas Park details that matter
Trees and site clearing: sites with trees, Florida native plants or environmentally sensitive areas are inspected by Urban Forestry before clearing starts, and clearing waits for a tree removal or grubbing permit.
Stem walls and doors: the May 2024 code changes require stem wall construction instead of lot fill and a permit for every exterior entry and garage door.
Development fees: parkland and library dedication fees, multi-modal impact fees, water meters and sewer taps can add to the cost of new homes and buildings.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Pinellas Park permit FAQs
Want this handled start to finish?
Get a free quote →Who issues building permits in Pinellas Park?
The City of Pinellas Park Building Development Division, at 6051 78th Avenue N, issues building and trade permits for property inside the city. Call 727-369-5647 or email permits@pinellaspark.gov.
How much is a building permit in Pinellas Park?
For a home, $75 for work up to $1,000, then $5.75 per additional $1,000 up to $50,000, with lower rates above that. Plan review adds 50% and a technology fee of $2–$20 is added to each permit.
How long does it take to get a permit?
The city says most applications are reviewed and permits issued within 10 business days once all required documents have been submitted.
Can a homeowner pull a permit?
Yes, for work on an owner-occupied single-family home. The owner fills out the Owner/Occupant Affidavit before the permit is issued.
Do I need a permit to replace a door?
Yes. Since May 23, 2024, every exterior entry door and garage door needs a permit.
How do I schedule an inspection?
At least one working day ahead, through the online portal or by email to inspections@pinellaspark.gov with the permit number, inspection type, address, contractor and phone number.
How long is a permit valid?
Permits generally expire after 180 days if no inspections have been made. Call 727-369-5647 to reactivate an expired permit.
Pinellas Park permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Inspections are where schedules slip.
Get a free quote →- Pinellas Park permitting
- Florida Building Commission
- Pinellas Park building department
- Pinellas Park inspections
- Pinellas Park Plans, Permits & BTRs portal
- Applying for a permit in Pinellas Park
- Receiving your permit
- Estimated building permit fees, one- and two-family (October 2023)
- Estimated building permit fees, other buildings (October 2023)
- Building permit procedures, single-family home or addition
- Pinellas Park inspection guidelines
- Pinellas Park building FAQs
Simplify Pinellas Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Pinellas Park sooner?
Let Alliance prepare, file, and track your Pinellas Park permits while your crew stays on the job.
More Florida permitting guides
Pinellas County
Read guide →City of Clearwater
Read guide →Dunedin
Read guide →Plant City Building Permit Guide
Read guide →City of Plantation Building Permit Guide
Read guide →Polk County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Pinellas Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.