The City of Seminole Building Division issues building, electrical, fuel gas, mechanical and plumbing permits inside city limits and does most plan reviews in-house. Licensed contractors file common jobs online through the city’s Citizenserve portal and everything else in person at 9199 113th Street N; fees start at $50 and are based on total job value, with plan review at 50% of the permit fee.
What requires a building permit in Seminole?
Building, electrical, fuel gas, mechanical and plumbing work inside the city needs a permit from the Building Division before work starts. The city’s window and door checklist says a permit is needed however many windows or doors are replaced, and openings must have wind-borne debris protection: impact-rated windows and doors or approved shutters, fabric or panels. Demolition, tree removal (where the city requires it), special events and work in the city right-of-way have their own permits.
Licensed contractors can apply online for window/door replacement, A/C replacement, reroof, electrical upgrade and water heater permits. Online accounts are for licensed contractors only. The city’s FAQ says all other permit types are filed in person at the office at 9199 113th Street N.
Seminole building department: who handles permitting
| Detail | Information |
|---|---|
| Office | 9199 113th Street, Seminole, FL 33772 |
| Phone | 727-391-0204 |
| Hours | 8:00 a.m.-3:30 p.m., excluding holidays |
The city warns applicants to confirm that the property is actually within City of Seminole limits. Its FAQ says the Pinellas County Property Appraiser tax district code SM identifies property inside the city, and Building Division staff can also confirm jurisdiction.
Permit and Licensing Technicians can be reached at 727-392-1966 ext. 126 or permits@myseminole.com. Inspections are booked on the inspection hotline at 727-398-3110.
Short on time to read all of this?
Get a free quote →Seminole permit types and local requirements
To file online, register an account in the city’s Citizenserve portal, complete the Contractor Registration process, then apply for the permit. The Building Applications & Forms page lists the documents that go with an application:
- Homeowner Affidavit for owners doing their own work; for windows and doors, owners can only pull the permit when the property is not offered for sale or lease.
- Notice of Commencement and NOC Affidavit; the window and door checklist calls for a recorded NOC on jobs over $2,500.
- Product Approval specification sheet, with a copy of each product approval and its installation instructions.
- Subcontractor Job Card, Change of Contractor Form and Revision Form.
- Architect/engineer certification forms for building, electrical, fuel gas, mechanical and plumbing work, the Contractor’s Tie-In Certification and Fuel Gas Testing Certification.
- Roofing Compliance Affidavit, Residential Pool Safety Barrier Form, Site Plan Application and Check List and Substantial Improvement / Damage Review Form.
| Scope | City-published filing / form |
|---|---|
| Window / door | Online contractor permit + Window/Door Permit Checklist. |
| A/C replacement | Listed among online permit scopes. |
| Reroof | Online permit scope + Roofing Compliance Affidavit. |
| Electrical upgrade | Listed among online permit scopes; separate electrical certification form available. |
| Water heater | Listed among online permit scopes. |
| Pool | Residential Pool Safety Barrier Form and Swimming Pool Inspections information. |
The city says most plan reviews, including zoning and fire plan reviews, are done in-house. Commercial work is the exception: commercial projects must use a private provider for plan review and inspections at the applicant’s expense, and the city reduces the permit fee to match.
Seminole permit fees
Seminole’s permit fee schedule uses a tiered total job valuation formula rather than a single flat permit amount.
Not sure this scope needs a permit?
Get a free quote →| Total job valuation | Current schedule |
|---|---|
| $0-$1,000 | $50 base fee. |
| $1,001-$20,000 | $50 for first $1,000 + $9 per additional $1,000 or fraction. |
| $20,001-$40,000 | $225 for first $20,000 + $10.50 per additional $1,000 or fraction. |
| $40,001-$60,000 | $425 for first $40,000 + $12 per additional $1,000 or fraction. |
| $60,001-$100,000 | $650 for first $60,000 + $13.50 per additional $1,000 or fraction. |
| $100,001-$500,000 | $1,000 for first $100,000 + $10 per additional $1,000 or fraction. |
Above $500,000 the fee is $5,000 for the first $500,000 plus $8.75 per additional $1,000, and above $1,000,000 it is $9,500 plus $7.50 per additional $1,000. For example, a $30,000 job has a permit fee of $330, and plan review adds $165.
| Project | Fee |
|---|---|
| Plan review | 50% of the building permit fee |
| State surcharges | 1.5% and 1% of the permit fee, $2 minimum each |
| Demolition of a structure | $100 |
| Tree removal | $25 |
| Permit extension | $100 |
| Change of contractor | $25 |
| Stop work order | $50 |
| Re-inspection | $75 first, $125 second |
| After-the-fact permit | Double the normal fee; 10 times for repeat work without permits by the same contractor |
Using a private provider for inspections cuts the permit fee by 25%, and for plan review and inspections by 50%. Credit card payments carry a 3.5% convenience fee. Permits costing $35 or less are not refunded, and nothing is refunded once work has started or the permit is 90 days old.
Rather talk it over?
Call 1-855-478-4290 →Seminole building and trade responsibility
The City of Seminole handles building-code permit functions locally, and its application/forms clearly separate building, electrical, fuel gas, mechanical and plumbing scopes. The city also publishes specific certification forms for each of those disciplines.
Gas work needs the Fuel Gas Testing Certification, and contractors connecting to utilities use the Contractor’s Tie-In Certification. Where a private provider handles inspections, the power release is requested on the city’s Private Provider Power Release Form.
How to apply for a Seminole permit
Use the city’s guidance and Pinellas County Property Appraiser tax district code SM or confirm with Building Division staff.
Licensed contractors can apply online for the listed common permits; all other permit types are filed in person at the Building Division.
Create a portal account, complete Contractor Registration, and gather the checklist, affidavits, product approvals and trade forms the job needs.
The city requires commercial projects to use a private provider for plan review and inspections at applicant expense.
Fees follow the city’s tiered total job valuation schedule.
Use the city inspection hotline and request inspections before the city cutoff for next-business-day scheduling.
Inspections in Seminole
Seminole publishes an inspection hotline at 727-398-3110. The city FAQ says inspection requests must be called in by 2:00 p.m. to receive a next-day inspection, excluding weekends and holidays. Requests after 2:00 p.m. Friday, or on Saturday or Sunday, are scheduled for Tuesday.
Rather not deal with the building department?
Get a free quote →Re-inspections cost $75 the first time and $125 the second. Pools have their own inspection information sheet and a Residential Pool Safety Barrier Form, and a stop work order carries a $50 fee.
Local Seminole details that matter
Tree removal: the city does not generally require a tree removal permit on residential property, but homes in subdivisions approved under a development agreement or development order do need one and may have to replace trees. The city names Seminole Groves, Arabella, Pine Crest Villas, Artisan Estates, Artisan Preserve, Enclave and The Cove at Bay Pines; condominiums, townhomes and apartments are reviewed case by case.
Flood zones: work on buildings in a flood zone goes through the Substantial Improvement / Damage Review Form, using either your own appraisal or the city’s market value estimate from county tax records.
Right-of-way: utility work in city streets needs a Utility Right of Way Utilization Permit.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Seminole permit FAQ
Is this the Seminole County permit office?
No. This guide is for the City of Seminole in Pinellas County.
How can I confirm a property is inside the City of Seminole?
The city says tax district code SM in the Pinellas County Property Appraiser records indicates City of Seminole jurisdiction, or call 727-392-1966.
How much is a building permit in Seminole?
$50 for work up to $1,000, then $9 per additional $1,000 up to $20,000, with higher steps above that. Plan review adds 50% of the permit fee, plus state surcharges of 1.5% and 1%.
Want this handled start to finish?
Get a free quote →Do I need a permit to replace windows or doors?
Yes, whatever the number replaced. Licensed contractors can apply online; owners can pull the permit only if the property is not for sale or lease.
Which permits can be filed online?
Licensed contractors can apply online for window and door replacement, A/C replacement, re-roofs, electrical upgrades and water heaters. All other permits are filed in person.
What is the next-day inspection cutoff?
2:00 p.m. on the inspection hotline, 727-398-3110, excluding weekends and holidays. Calls after 2:00 p.m. Friday or at the weekend are scheduled for Tuesday.
Do commercial projects use city inspectors?
No. Commercial projects must use a private provider for plan review and inspections at the applicant’s expense, and the permit fee is reduced by up to 50%.
Seminole permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Florida Building Commission — 8th Edition (2023)
- Permit Fee Schedule
- Building FAQ
- Building Applications & Forms
- Building Division
- City of Seminole Permits
- Seminole Citizenserve permit portal
- Seminole window and exterior door permit checklist
- Seminole tree removal permit notice
- Seminole substantial improvement / damage review form
Inspections are where schedules slip.
Get a free quote →Simplify Seminole permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Seminole sooner?
Let Alliance prepare, file, and track your Seminole permits while your crew stays on the job.
More Florida permitting guides
Pinellas County
Read guide →City of Clearwater
Read guide →Dunedin
Read guide →Seminole County Building Permit Guide
Read guide →South Daytona Building Permit Guide
Read guide →South Miami Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Seminole permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.