The City of North Miami Building Department at 12340 NE 8th Avenue issues building, roofing, electrical, mechanical and plumbing permits inside the city, using one Building Permit Application for every permit type except right-of-way and utility work. Under the fee schedule revised in June 2026, a new home costs $1.75 per sq ft (minimum $6,500), and while the online system is down, emergency applications are taken in person.
What requires a building permit in North Miami?
Building work in North Miami needs a permit before it starts, including building, roofing, electrical, mechanical, structural and plumbing work. One Building Permit Application covers all permit types except right-of-way and utility permits, and the city publishes project-specific forms and packets for fences, driveways, windows and doors, roofing and A/C replacement.
North Miami building department: who handles permitting
| Detail | Information |
|---|---|
| Office | Building Department, 12340 NE 8th Avenue, North Miami, FL 33161 |
| Phone | 305-895-9820 |
| Permits@northmiamifl.gov; inspections: Inspect@northmiamifl.gov |
North Miami permit types and forms
Building, electrical, mechanical and plumbing work are permitted and inspected as separate disciplines, but on new homes, additions and alterations the mechanical, electrical and plumbing sub-permits are included in the building permit fee. Roofs, windows and doors, pools, driveways, fences and railings on new commercial buildings need their own permits.
Short on time to read all of this?
Get a free quote →Forms on the Permits Information & Applications page include the Building Permit Application, Building Cost Affidavit, the 2023 roof packet with hurricane mitigation affidavit, Roofing Permit Affidavit and Roof Owners Notification, the Air Conditioning Replacement Sheet, Electrical Residential Service Change and Electrical Service Affidavit, fence details, the Driveway Packet, Pool Safety Form, Owner Builder Affidavit and Disclosure Statement, Notice of Commencement, Special Inspector Form, NM Threshold Building Affidavit, Early Start Request and the TCO/TCC application.
Contractor registration: before applying, each qualifier registers with the company by sending a photo ID, state contractor licence, local business tax receipt, a general liability certificate naming the City as holder and valid for at least 6 months, and workers’ compensation insurance or an exemption. Questions go to Conregister@northmiamifl.gov.
North Miami building permit cost
The Building Department’s Permit Fee Schedule (effective May 2022, revised June 2026) charges most building work by area. A non-refundable upfront fee of $45 per review discipline is collected at submittal and credited toward the permit fee at issuance, with extra fees for structural review ($112.75 an hour) and floodplain review ($35 per half hour) where they apply. City Council approved an updated Building and Zoning Department permit fee schedule in Resolution 2026-R-108.
| Project | Fee |
|---|---|
| New home (single family to triplex), trades included | $1.75 per sq ft, $6,500 minimum |
| Residential addition | $1.70 per sq ft added, $650 minimum |
| Residential alteration or repair | $1.60 per sq ft of work area, $250 minimum |
| New commercial or multifamily building | $1.85 per sq ft, $7,500 minimum |
| Re-roof, shingle, flat or metal / tile | $0.16 / $0.21 per sq ft, $120 minimum |
| Windows, doors, shutters (residential) | $262 up to 10 openings, $350 over 10 |
| Fence (metal, wood, chain link, PVC) | $0.92 per linear foot, $120 minimum |
| Residential pool or hot tub | $640 including trades |
| Driveway, slab, pavers | $0.25 per sq ft, $120 minimum |
| Demolition | $325 per structure |
| Stand-alone electrical, plumbing or mechanical | $150 residential, $250 commercial |
Not sure this scope needs a permit?
Get a free quote →For example, a new 2,400 sq ft house works out to $4,200 at $1.75 per sq ft, so the $6,500 minimum applies. Surcharges are added to the base fee: 5% for Miami-Dade County code compliance (from June 26, 2026), 1.5% each for the two state funds, and a City training and technology fee of $0.06 per $1 of base fee.
Other charges include $205 for an early start authorisation, $820 (residential) or $1,050 (commercial) for an optional dry-run or expedited review, $140.43 per discipline for every two plan denials, $102.35 to change contractors, extend a permit for 90 days or renew an expired one, and $26 to process a request for the state’s under-$7,500 permit exemption. Work started without a permit pays a $112.75 penalty plus double the base fee. Private providers reduce the base fee by 25% (plan review or inspections) or 50% (both).
Trade permits in North Miami
Electrical, mechanical and plumbing work are reviewed and inspected as separate disciplines from building work.
- Electrical — Inspected Monday to Friday, 7:30 a.m. to noon. The city has an Electrical Residential Service Change form and an Electrical Service Affidavit.
- Mechanical — Inspected Monday, Wednesday and Friday, 9:00 a.m. to noon. A/C replacements use the city’s Air Conditioning Replacement Sheet.
- Plumbing — Inspected on the daily schedule posted by the city.
- Building — Structural and general building work, inspected on the daily schedule.
Rather talk it over?
Call 1-855-478-4290 →How to get a building permit in North Miami
Identify the building and trade work in the project and check whether the online application system is back in service.
Download and complete the city permit application and project-specific forms.
The online application system is temporarily unavailable; emergency applications can be filed in person at the Building Department.
Respond to Building Department review comments and provide revised documents as requested.
Pay the remaining permit fees, less the upfront fee already paid, before the permit is issued.
Request inspections using the city online inspection form and follow the posted trade schedule.
Inspections in North Miami
North Miami does not take inspection requests by phone; use the city’s online inspection form with the permit number, contact name and phone, and inspection type. Mechanical inspections run Monday, Wednesday and Friday, 9 a.m. to noon, and electrical inspections Monday to Friday, 7:30 a.m. to noon. Building, roofing and plumbing inspections follow the daily schedule, which is posted after 5:00 p.m. the day before. Cancel before 8:30 a.m. on the inspection day, or the inspection counts as failed.
Rather not deal with the building department?
Get a free quote →A re-inspection costs $102.35 per trade each time work is not ready, corrections are not made, approved plans are not on site or there is no access, and it must be paid before further inspections. After-hours and weekend inspections are $107 an hour with a 4-hour minimum, paid a business day ahead. A single-family certificate of occupancy costs $147, and a certificate of completion $12 per discipline.
Local North Miami details that matter
Re-occupancy certificates: the Building Department runs re-occupancy inspections, and a property sold without an approved re-occupancy or conditional re-occupancy certificate faces a fine equal to the expedited application fee. For a single-family home or condo unit the application and inspection fee is $112.75, or $338.25 expedited (within three business days, subject to availability).
Impact fees: new single-family homes pay a parks and recreation impact fee of $4,112 and a general government impact fee of $1,860 under the phase two rates in effect from April 1, 2026 to March 31, 2027, plus water and sewer impact fees by meter size and a mobility fee.
Recertification: buildings due for 30- or 10-year recertification under the Miami-Dade County program pay $494 per building, with another $494 for a late submission.
Unclaimed permits: an approved permit that is not picked up within 180 days of notice is cancelled, and fees are not refunded.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Frequently asked questions
Who issues building permits in North Miami?
The City of North Miami Building Department, 12340 NE 8th Avenue.
Want this handled start to finish?
Get a free quote →How do I apply for a North Miami building permit?
Complete the city Building Permit Application. While the online system is down, emergency applications can be filed in person at the Building Department.
How are permit fees calculated?
From the city Permit Fee Schedule. A $45 upfront fee per review discipline is paid at submittal and credited at issuance.
How much is a building permit for a new house in North Miami?
$1.75 per square foot with a $6,500 minimum, including the electrical, mechanical and plumbing sub-permits, plus county and state surcharges and the City technology fee.
How much is a re-roof permit?
$0.16 per sq ft for shingle, flat or metal roofs and $0.21 for tile, with a $120 minimum.
What does a re-inspection cost?
$102.35 per trade each time, payable before the next inspection.
North Miami permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Permit information and applications
- North Miami Building Department
- Permit fee schedule (PDF)
- City resolutions
- Inspections
- North Miami contractor registration
- North Miami impact fee schedule (2026-27)
Inspections are where schedules slip.
Get a free quote →Simplify North Miami permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in North Miami sooner?
Let Alliance prepare, file, and track your North Miami permits while your crew stays on the job.
More Florida permitting guides
Miami-Dade County
Read guide →Aventura
Read guide →City of Miami
Read guide →North Palm Beach Building Permit Guide
Read guide →City of North Port Building Permit Guide
Read guide →Oakland Park Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about North Miami permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.