Pacific Grove, California Building Permit Guide

To get a building permit in Pacific Grove, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Pacific Grove’s Building Division, on the second floor of City Hall at 300 Forest Avenue, takes building, trade and encroachment applications online, collects plan review fees up front, and books inspections for the next business day on calls made before 4 p.m.

Authority: Pacific Grove Building DivisionFiling: Online or at the counterPhone: 831-648-3191
Authority
City Building DivisionCity Hall, 300 Forest Ave., 2nd floor
Inspections
831-648-3194Call by 4 p.m. for next business day
Permit life
180 daysFrom issuance or last inspection
Home sales
$527 city reportRZRR plus sewer lateral, FY 2026-27

Inside the City of Pacific Grove, building, electrical, plumbing, mechanical, re-roof and solar permits come from the Building Division of the Community Development Department at City Hall, 300 Forest Avenue, second floor (831-648-3191, building@cityofpacificgrove.org). Applications and payments can be made online, plan review fees are paid when the application is filed, and permits are issued only to the property owner or a California-licensed professional. Water, sewer, coastal and air district approvals often come before the permit.

What requires a building permit in Pacific Grove?

The Building Division oversees all residential and commercial construction in the city. Its online applications show the permits it issues: building permits, standalone electrical, plumbing and mechanical permits, re-roofs and solar, and the public works permits it also processes for curb and gutter, driveway approaches, sidewalks, street openings and temporary or permanent encroachments.

Building Division permits

  • New buildings, additions, remodels and ADUs (building permit form)
  • Electrical, plumbing and mechanical work
  • Re-roofs
  • Solar systems
  • Curb, gutter, driveway approach and sidewalk work
  • Street openings and excavation
  • Temporary and permanent encroachments

Tree permits (Public Works)

  • Gowen cypress of any size
  • Coast live oak, Monterey cypress, shore, Torrey and Monterey pine 6 inches or more in diameter at 54 inches above grade
  • Other private trees 12 inches or more
  • All street trees, and public trees 6 inches or more
  • Any tree in or within 100 yards of a Monarch sanctuary

A tree permit covers removal and substantial pruning: cutting more than 25% of the live branches in 12 months, any live limb 6 inches or more across, or any root 4 inches or more. Pruning and removal inside the Monarch sanctuaries is prohibited from October 1 to May 1, and tree work tied to development in the Asilomar Dunes habitat area may need a coastal development permit.

What Pacific Grove decides and what the state holds

The city sets its own fees in a master fee schedule each fiscal year, its zoning and architectural review, its historic resources inventory, its tree rules, its water credit sales under Municipal Code chapter 11.68 and its resale report under chapter 23.78. Applications filed after January 1, 2026 are reviewed under the 2025 codes. Contractors are licensed by the state.

Pacific Grove building department: who handles permitting

The Building Division of the Community Development Department provides counter service, plan review and inspections for construction inside the city. The Planning Division, in the same office under Community Development Director Jon Biggs, reviews all plans for new construction and alterations and may refer them to the Zoning Administrator, the Architectural Review Board, the Historic Resources Committee or the Planning Commission. Areas outside the city limits are unincorporated Monterey County.

Short on time to read all of this?

Get a free quote →
Pacific Grove permit contacts
DetailInformation
OfficeBuilding Division, City Hall, 300 Forest Avenue, 2nd floor, Pacific Grove, CA 93950
Main line / email831-648-3191, building@cityofpacificgrove.org
Inspection line831-648-3194
Building counter8 to 11:30 a.m. and 1 to 4 p.m. weekdays per the department’s contact box; the permit section lists Monday to Thursday 8 to 11:30 a.m. and 1:30 to 4 p.m., with no permit activity on Fridays
Planning831-648-3190, planning@cityofpacificgrove.org; planner on duty Tuesday and Thursday 8 to 11:30 a.m., afternoons by appointment
Community Development831-648-3183; department hours weekdays 8 a.m. to noon and 1 to 5 p.m.
Drop boxPayments and applications for any department can be left in the drop box at City Hall

Pacific Grove permit types

The city uses three application forms: one for standalone electrical, plumbing, mechanical, solar or re-roof permits, one for building permits, and one for encroachment, street opening, driveway, sidewalk and curb, gutter or ramp work. All of them can be filed and paid online. Anyone may apply, but the permit is issued only to the property owner or a California-licensed professional.

Residential permits

  • Houses and additions: the division posts a single-story conventional wood-frame construction sheet, a construction best-management-practices plan sheet and a special inspection form. New or added space over 500 square feet pays Pacific Grove Unified School District fees (in place since November 6, 2023).
  • ADUs follow the city’s ADU ordinance (Ordinance 22-002) and handbook. The city offers a free consultation with a planner (bring a rough site plan and note any ordinance-size trees), asks owners to confirm water with the water district first, and will not process inaccurate or incomplete plans. An approved ADU plan set (permit 230237) can be viewed at the counter.
  • Solar uses the standalone permit form; the city’s page states that SolarAPP+ is not in service in Pacific Grove.
  • EV chargers follow the city’s electric vehicle charging equipment checklist.

Commercial permits

Restaurants, public spas and swimming pools also need Monterey County Health’s consumer health approval (831-647-7650), and businesses handling hazardous materials deal with the county’s hazardous materials program (831-755-4500). Approved multifamily and mixed-use plan sets (permit 10969) can be viewed at the office; state law bars the city from copying plans drawn by an architect or engineer.

What comes before the building permit

Coastal zone. On March 11, 2020 the California Coastal Commission certified the city’s Local Coastal Program and its appeal jurisdiction map, giving Pacific Grove a complete certified LCP for the first time; the building page still lists a Coastal Commission permit or waiver for coastal zone properties, so ask Planning which applies to your parcel. Historic resources. The city’s Historic Resources Inventory lists more than 1,350 structures, and changes to them are considered under the Historic Preservation Ordinance, Municipal Code chapter 23.76, with the Historic Resources Committee.

Not sure this scope needs a permit?

Get a free quote →

The Permit Technician gives each applicant a list of the outside agencies and city departments that must approve the project before issue. Planning approval from staff, the Architectural Review Board or the Planning Commission can come first.

Outside approvals named by the Building Division
AgencyWhat it covers
Monterey Peninsula Water Management District (831-658-5601)Water permit or waiver for added fixtures
Monterey One Water (831-372-2385)Sewer permit or waiver
California Coastal Commission (831-427-4863)Permit or waiver for properties in the coastal zone
Monterey Bay Air Resources District (831-647-9411)Demolitions
Monterey County Health (831-647-7650)Restaurants, public spas and pools
Transportation Agency for Monterey County (831-775-0903)Regional development impact fee
Pacific Grove Unified School District (831-646-6553)School fees on new or added space over 500 square feet

Pacific Grove permit costs and fees

Building fees come from the Community Development section of the city’s Master Fee Schedule for fiscal 2026-27 (“F/Y 26-27 Fees”), posted on the Administrative Services fee schedule page. New construction pays a combination permit fee (building, or building plus mechanical, electrical and plumbing) in place of separate fees, based on the value of the improvements. A plan review fee of 75% of the building permit fee for single-family residential projects, or 95% for all other projects, is paid when plans are submitted and is non-refundable.

Selected building fees, Master Fee Schedule FY 2026-27
ItemFee
Electrical, plumbing or mechanical permit not needing plan check$255
Solar voltaic system; single-family re-roof$720 each
Multifamily or commercial re-roof: first building / each additional$720 / $140
Kitchen or bathroom remodel (non-structural, no exterior changes)$1,470
EV charger: residential / commercial$717 / $1,318
Combination permit, $100,001 to $500,000 valuation$4,508 for the first $100,000, plus $26 per additional $1,000 or fraction
Re-inspection / inspection outside business hours$148 / $208 per hour (4-hour minimum)
Revisions to approved plans$93 per hour (half-hour minimum)
Building permit extension$991 per 90 days
Temporary occupancy$1,093
On-site stormwater plan review and inspection (non-LID)$600
Encroachment permit: street opening, driveway, sidewalk, temporary or permanent$445 each
General plan update fee5% of the permit fee
“Owner/building surcharge in addition to permit fee”20%
Work without city permitsInvestigative fee equal to the permit plus staff time

Rather talk it over?

Call 1-855-478-4290 →

Worked example. A $200,000 single-family addition: permit from the combination table $4,508 + (100 × $26) = $7,108; plan review at 75% = $5,331; general plan update fee at 5% of the permit fee = $355.40; together $12,794.40 before outside agency charges. The valuation bands do not join up at every limit (the $2,001 to $25,000 band reaches $1,884 at $25,000, while the next band starts at $1,183), so ask the division to confirm a fee near a band edge.

Planning fees in the same schedule include a single-family architectural permit at $3,980, an administrative architectural permit at $1,937, a single-family coastal development permit at $4,363 and a tree permit with development at $435; projects in the Area of Special Biological Significance or the butterfly buffer pay overlay fees of 5% of permit fees.

  • Outside agencies: water, sewer, school, coastal and regional traffic (TAMC) charges are set and collected by those agencies; Pacific Grove Unified assesses school fees on new or added space over 500 square feet.
  • Water credits: since July 22, 2019 the city sells potable water credits; applications go to water@cityofpacificgrove.org, and the water district says how much credit a project needs.
  • Resale report: the residential zoning records report and sewer lateral report together cost $527 in the FY 2026-27 schedule (the report’s web page still shows $502); the page adds 3.5% for card payments.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits are issued by the Building Division on the standalone permit form, online or at the counter. Contractors must have the following before any permit is issued:

  • A California contractor’s license.
  • A workers’ compensation insurance certificate.
  • A current City of Pacific Grove business license, applied for through the city’s online business license portal.

Owners may pull permits for their own property. Tree service contractors working in the city need a Pacific Grove business license, a state license with the D-49 classification, liability insurance, a bond and workers’ compensation, and tree work is limited to 8 a.m. to 6 p.m. Monday through Saturday and 10 a.m. to 5 p.m. on Sundays unless the city approves otherwise.

Rather not deal with the building department?

Get a free quote →

How to apply for a Pacific Grove building permit

1. Talk to a planner

See the planner on duty (Tuesdays and Thursdays) about zoning, architectural review, historic status, coastal zone and trees.

2. Get planning approval

File the planning permit application and fees with planning@cityofpacificgrove.org if the project needs staff, board or commission approval.

3. Check water and sewer

Ask the water district how many credits the project needs and whether a Cal-Am meter is available; buy city water credits if short.

4. Apply online

Use the building, standalone trade or encroachment application and pay the non-refundable plan review fee.

5. Clear the agency list

Collect the approvals the Permit Technician lists and answer the review comments emailed to you.

6. Pay the permit fees and receive the permit

Contractors provide their license, workers’ compensation and city business license.

Review, corrections and what causes delay

Once internal department comments are compiled, the Permit Technician emails them to the applicant; resubmittals follow the instructions in the plan review letter. The most common holds are outside approvals: water credits are scarce on the Monterey Peninsula, and the city warns that a state utilities commission moratorium may keep Cal-Am from setting new meters for projects without an active meter. For housing projects, the city’s AB 2234 page summarizes the state deadlines for deciding whether an application is complete and for completing review.

Inspections in Pacific Grove

Call the inspection line at 831-648-3194 with the permit number, job address, inspection type, requested date and a contact name and phone. Requests received before 4 p.m. are scheduled for the next business day, and the division does not call to confirm; to learn your two-hour window, call the main line at 831-648-3191 between 8 and 9 a.m. on the inspection day.

  • Someone 18 or older must be present when the inspector needs access.
  • The approved plans and job card must be on site.
  • Permits expire 180 days after issue or after the last inspection, so keep inspections moving.

Before close of escrow on any single-family home, condominium or apartment building, the seller must obtain a residential zoning records report under Municipal Code chapter 23.78. Code Compliance (831-648-3116) researches the city’s records and inspects the exterior; no one needs to attend and the city does not call ahead. The seller also certifies that smoke and carbon monoxide alarms are installed. Reports are typically ready within 10 business days once the application is complete and paid; if the sewer lateral was fully replaced in the last 10 years, include receipts or permit numbers.

California building code in Pacific Grove

Pacific Grove tells applicants that projects submitted after January 1, 2026 must comply with the 2025 codes, and posts a summary of the code changes. The city’s municipal code, including its water (chapter 11.68), historic preservation (23.76) and resale report (23.78) chapters, is linked from the city site. FEMA’s Community Status Book lists Pacific Grove (community 060201) as participating in the National Flood Insurance Program, with a current flood map dated June 21, 2017.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Pacific Grove building permit FAQs

Who issues building permits in Pacific Grove?

The city’s Building Division at City Hall, 300 Forest Avenue, second floor (831-648-3191), for property inside the city.

Can I apply online?

Yes. Building, trade, re-roof, solar and encroachment applications and payments can be made online.

Who can get the permit?

Anyone can apply, but the permit is issued only to the property owner or a California-licensed professional; contractors also need a city business license.

Are plan review fees refundable?

No. They are collected at application for plan check work and are non-refundable.

Do I need a permit to remove a tree?

Often. Gowen cypress of any size, coast live oak, Monterey cypress and the listed pines of 6 inches or more, other private trees of 12 inches or more and all street trees need a Public Works tree permit.

What does a seller need from the city?

A residential zoning records report before close of escrow; with the sewer lateral report it costs $527 under the FY 2026-27 fee schedule.

How do I schedule an inspection?

Call 831-648-3194 before 4 p.m. for the next business day, then call 831-648-3191 between 8 and 9 a.m. for your two-hour window.

Is my house a historic resource?

Check the city’s Historic Resources Inventory database, which lists more than 1,350 structures; changes to listed buildings go through the Historic Preservation Ordinance and may need Historic Resources Committee review.

How much is a re-roof or water heater permit?

The FY 2026-27 schedule charges $720 for a single-family re-roof and $255 for an electrical, plumbing or mechanical permit that needs no plan check.

Pacific Grove permit search and official resources

Building permits can be searched and inspections scheduled through the city’s online permit system, linked from the Building Permits and Inspections page, which also offers a search of residential zoning records reports and tree permits. The Community Development pages include a parcel map viewer with property information and the historic resources inventory database.

Inspections are where schedules slip.

Get a free quote →

Simplify Pacific Grove permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pacific Grove sooner?

Let Alliance prepare, file, and track your Pacific Grove permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pacific Grove permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.