Inside Palm Desert, building permits come from the city’s Building and Safety Division at City Hall, 73510 Fred Waring Drive (760-776-6420, building@palmdesert.gov). Applications, resubmittals, inspection requests and refund requests run through the Clariti portal. Plan review and permit fees are set by Resolution No. 2025-064, and the city adds its own construction fee of $0.40 per sq ft for dwellings, so a 2,000 sq ft house pays $800 in that fee alone.
What requires a building permit in Palm Desert?
The Building and Safety Division reviews plans, issues permits and inspects construction to keep work in Palm Desert in line with state and local codes. Its plan review work covers residential additions and alterations, commercial and industrial plans, and tenant improvements.
Permits the city issues
- New homes, additions, alterations, remodels and repairs
- New commercial and industrial buildings and tenant improvements
- Patio covers, garages, sheds, shade structures, trash enclosures and storage tanks, which the fee page lists for the state strong motion fee
- Swimming pools (the job valuation fee covers C53 pool contractors)
- Accessory dwelling units, which pay the transportation fee from 750 sq ft
- Mobile homes and mobile home parks
Smaller jobs with permits
- Residential HVAC replacement
- Water heater replacement
- Residential window and door replacement
- Residential re-roofs
- All four can use the city’s virtual inspection program
The city’s pages give no list of exempt work; its code adoptions and amendments are in Chapter 15 of the Palm Desert Municipal Code, and the division answers questions at 760-776-6420. If a planned building follows the California Residential Code’s conventional construction rules, structural calculations and a licensed architect or engineer may not be needed, though the city recommends an experienced designer.
What Palm Desert decides and what the state holds
The City Council sets plan review and permit fees by resolution (Resolution No. 2025-064) and adds city fees of its own: the construction fee under Ordinance No. 216, the job valuation fee under Resolution No. 83-73, Art in Public Places under Ordinance No. 473, and housing and child care mitigation fees on commercial work. The city also sets construction hours (Chapter 9.24), site rules for trash bins and debris storage, and its design criteria.
Palm Desert building department: who handles permitting
The city’s Building and Safety Division reviews plans, issues permits and inspects work throughout Palm Desert; Riverside County permits only unincorporated land outside the city. Fire and life safety review is handled by Palm Desert’s Fire Marshal Services, which work with the Riverside County Fire Department: fire plan check and inspection forms go through the County Fire permit portal, and the Riverside County Fire Marshal answers fire sprinkler questions.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, City Hall, 73510 Fred Waring Drive, Palm Desert, CA 92260 |
| Phone / email | 760-776-6420; building@palmdesert.gov |
| Fees and estimates | 760-776-6435; permitcenter@palmdesert.gov |
| Inspection questions | 760-776-6430 |
| Planning / Land Development | 760-776-6483 |
| Fire | Fire Marshal Services, 760-346-0611, FireMarshal@palmdesert.gov; Riverside County Fire Marshal 760-863-8886 |
| Business licenses | HdL Companies for the city, 442-325-3954, palmdesert@hdlgov.com |
Palm Desert permit types
Applications go through Clariti, the city’s permit portal (or on a thumb drive at the counter), where applicants upload plans, answer corrections, request inspections and ask for refunds. Plans, corrections and permits are reviewed electronically and issued by email; the city gives no paper copy, so the applicant prints the approved set for inspections.
Residential permits
For additions and alterations the plan set includes the application, energy and green building documents, a title sheet (owner, parcel number, scope, zoning and area tables), a black-and-white site plan, floor and roof plans, elevations, sections, details, trade plans and structural plans. A precise grading plan is needed only for additions over 1,000 sq ft. Additions or alterations that increase conditioned area, volume or size must meet all mandatory CALGreen measures in Chapter 4, and residential energy forms (CF-1R) are for Climate Zone 15.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial and light industrial plans need stamped and signed structural calculations (and truss calculations where trusses are used), four exterior elevations, egress, life safety and accessibility details and full trade drawings. Tenant improvements need a site plan showing the tenant space and parking, a floor plan with disabled access details, a reflected ceiling plan, a roof plan where roof or equipment work is designed, and energy and green building documents. Only heavy-duty T-bar ceiling systems are allowed, because of seismic conditions. Fire sprinkler and alarm plans, Riverside County Health approval, Coachella Valley Water District approval, Burrtec Waste Disposal approval and truss calculations may be deferred.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. Zoning, lot coverage, setbacks, height and design approval can run alongside the building submittal; projects that went through Design Review show the approved colors on their elevations.
- Grading. Land Development handles grading permits, which may be required depending on the project’s size and scope.
- Special inspection. Where special inspection or structural observation applies, the architect or engineer of record submits an Inspection and Observation Program for approval before the permit is issued, and the owner hires the special inspector.
- School fees. New homes and commercial buildings pay school fees directly to the school district and upload the receipt to the permit in Clariti.
Palm Desert permit fees
Plan review and permit fees are set by Resolution No. 2025-064 and printed in the city’s Fee Schedule; for a project estimate the Permit Center takes requests at 760-776-6435 or permitcenter@palmdesert.gov. The Permit Fees page lists the other city, regional and state fees collected with a permit.
| Item | Fee |
|---|---|
| Construction fee, dwellings (Ordinance No. 216) | $0.40 per sq ft of gross area under roof, excluding carports, patio covers, garages, storage and recreation buildings |
| Construction fee, other | $0.40 per sq ft; $0.05 per sq ft in industrial zones; $300 per vacant mobile home space |
| Job valuation fee (Resolution No. 83-73) | $0.25 per $1,000 of valuation on permits pulled by B or C53 contractors |
| Art in Public Places (Ordinance No. 473) | New single home: 0.25% of valuation over $100,000; other new residential 0.25%; new commercial 0.5% |
| Fire facilities impact (designated area) | $709, $306 or $182 per unit by density; $0.22 per sq ft commercial; $0.21 industrial and office |
| Low income housing mitigation (Resolution No. 90-130) | Commercial $1.00, office $0.50, industrial $0.33 per sq ft; resort hotel $1,000, other hotel $620 per room |
| Child care impact mitigation | Office $1.15, retail $0.90, hotel $0.77, light industrial $0.47 per sq ft |
| Strong motion (Resolution No. 76-44) | Valuation × 0.00013 residential, × 0.00028 commercial |
| Building standards (SB 1473) | $1 up to $25,000 of valuation, rising $1 per $25,000 |
Worked example of the published add-on fees: a new single-family home with 2,000 sq ft under roof (garage excluded) valued at $400,000 and built by a B contractor pays a construction fee of $800, a job valuation fee of $100, Art in Public Places of $750 (0.25% of the $300,000 above $100,000), a strong motion fee of $52 and an SB 1473 fee of $16, or $1,718. The regional Transportation Uniform Mitigation Fee adds $2,900, for $4,618, before the city’s plan review and permit fees, Fire Department fees and school fees, and before the fire facilities fee where the lot is in its designated area.
Rather talk it over?
Call 1-855-478-4290 →The transportation fee applies to new commercial buildings and additions, new homes, ADUs of 750 sq ft and larger, changes of use, fuel dispensers, mobile homes and parks, and golf courses. The Coachella Valley Association of Governments sets the rates; from January 1, 2026 they are $2,900 per single-family home, $1,670 per attached multifamily unit and $7,535 per 1,000 sq ft of retail. Refunds are requested in Clariti with the Request Void/Refund button; some fees are non-refundable and requests more than 180 days after issuance are rejected.
Trade permits and who may pull them in Palm Desert
Electrical, mechanical and plumbing work is reviewed and inspected by the same division. Residential plans show services and subpanels, the full electrical layout with load calculations and a single-line diagram, new mechanical equipment and ducts, and drain, gas and water isometrics; gas plans give BTUs and total developed lengths at each fixture.
- Business license. Every contractor and subcontractor, including those based outside the city, needs a current Palm Desert business license before the permit is issued (Municipal Code Title 5 and Chapter 5.04). Contractor license fees, including the $4 surcharge required by AB 1379, are $104 for general engineering (A), swimming pool (C53) and the class the page lists as “Owner/Builder (B)”, $79 for plumbing (C36) and electrical (C10), and $54 for other specialty contractors. A contractor with a store or shop in the city also pays the gross-receipts license.
- Workers’ compensation. The license page says contractors must carry it unless they are sole proprietors with no employees.
- Subcontractor list. A complete, approved subcontractor list is needed to schedule the final inspection; allow 5 to 7 business days for the license check.
- License office move. HdL Companies runs licensing now; a new City portal is planned for December 2026, and existing licenses stay valid.
Rather not deal with the building department?
Get a free quote →How to apply for a Palm Desert building permit
Call Planning and Land Development (760-776-6483) about setbacks, height, design and whether a grading permit is needed.
Follow the matching list on the Plan Review page, with the code list and city site notes on the first sheet.
Vector PDFs only, layers flattened, no color, landscape, at most 300 MB per file, with a 4 by 3 inch stamp space at top right; file names in capitals.
Architects and engineers use a digital signature key; other preparers may sign electronically.
Create an account, apply and upload; resubmittals also go through Clariti with a written narrative.
Get business licenses for all contractors and pay school, fire and other agency fees.
Print the approved plans and keep them on site for inspections.
Review, corrections and what causes delay
The division aims to finish initial commercial plan reviews in 10 to 15 working days and re-submittals in 8 to 10, and small jobs may be quicker, depending on workload. Submittals missing listed items may be rejected, scanned plans are refused unless the sheet was drawn by hand, and resubmittals without a written narrative are not accepted. An application expires if no permit is issued within one year, and a permit expires if work does not start within one year, stops for a year, or no first inspection is requested within a year; the Building Official may grant extensions of up to 180 days on a written request.
Inspections in Palm Desert
Inspections run Monday to Friday, 7:30 a.m. to 3:30 p.m., except holidays. Book them in Clariti by choosing the permit under My Active Permits and clicking Request. On the morning of the inspection the Inspections tab shows whether it is set for the morning or afternoon. Cancel online until 6:30 a.m.; after that, call 760-776-6420. An After Hours Inspection Request form is posted for work outside those hours.
- Usual stages: foundation (with a 10-foot water test on underground plumbing), slab, roof and wall sheathing, framing with rough trades, insulation, drywall nailing, sewer and water service, gas test (10 psi for 15 minutes) and final.
- Final: drainage finished, address posted, fixtures working, insulation certificate posted, debris removed and the approved subcontractor list on file.
- Virtual inspections cover residential HVAC, water heater, window and door replacements and re-roofs. Photos of at least 4 megapixels, dated and time-stamped, go in through Clariti with the smoke alarm and carbon monoxide form; review takes 5 to 7 business days, and the approval in Clariti is the final record, with no job card.
Construction is allowed from October to April 30, Monday to Friday 7:00 a.m. to 5:30 p.m., and from May to September 30, Monday to Friday 5:30 a.m. to 7:00 p.m.; Saturdays are 8:00 a.m. to 5:00 p.m. all year, with no work on Sundays or government holidays. Violations can be cited under Section 9.24.070. Sites need approved temporary toilets and a trash bin, and materials and debris must stay on the permit property.
Want this handled start to finish?
Get a free quote →California building code in Palm Desert
The residential plan review list asks for the 2025 California codes on the first sheet. The Building and Safety page still describes the 2022 codes and Ordinance No. 1388 (effective January 15, 2023), whose local amendments are in Chapter 15 of the municipal code. Its design criteria include Seismic Design Category D (D2 under the residential code), Climate Zone 15, wind Exposure C north of Country Club Drive and B south of it, and no Fire Hazard Severity Zone; the commercial checklist calls the city a special wind region with site-specific wind speeds. Under the city’s reading of AB 130, approved Group R master plans keep their model code series for 10 years or until they change significantly, while pools, patio covers, walls and fences follow the code in effect at application. FEMA’s Community Status Book lists Palm Desert (community 060629) as participating in the National Flood Insurance Program, with a current flood map dated April 19, 2017.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Palm Desert building permit FAQ
Who issues building permits in Palm Desert?
The city’s Building and Safety Division at City Hall, 73510 Fred Waring Drive (760-776-6420). Riverside County permits only unincorporated land.
Can I submit paper plans in Palm Desert?
The submittal rules are digital: PDFs uploaded in Clariti or brought to the counter on a thumb drive, with permits issued by email. An older commercial paragraph on the same page still asks for two complete plan sets, so ask the division before bringing paper.
How much does a building permit cost in Palm Desert?
Plan review and permit fees follow Resolution No. 2025-064. City add-ons include $0.40 per sq ft for dwellings and $0.25 per $1,000 of valuation for B and C53 contractors.
How long does plan review take?
The commercial goal is 10 to 15 working days for a first review and 8 to 10 working days for a re-submittal.
Can I get a virtual inspection?
Yes, for residential HVAC, water heater, window and door replacements and re-roofs, using dated photos uploaded in Clariti.
Do subcontractors need a Palm Desert business license?
Yes. All contractors and subcontractors need one before the permit is issued, and the approved subcontractor list is needed to book the final.
Inspections are where schedules slip.
Get a free quote →What are the construction hours?
Weekdays 7:00 a.m. to 5:30 p.m. from October to April and 5:30 a.m. to 7:00 p.m. from May to September; Saturdays 8:00 a.m. to 5:00 p.m.; no Sundays or holidays.
Palm Desert permit search and official resources
Building records are requested from the Building and Safety page, which also posts monthly permit reports and links the city’s online public records portal for agendas, minutes, resolutions and ordinances. Copies of protected or stamped plans need the city’s affidavit form signed by the architect or engineer.
- Building and Safety Division
- Plan review and submittal requirements
- Construction inspections
- Permit fees
- City Fee Schedule, Resolution No. 2025-064 (PDF)
- Subcontractor list (PDF)
- Business licenses
- CVAG Transportation Uniform Mitigation Fee
- California Building Standards Code (Title 24)
Simplify Palm Desert permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Palm Desert sooner?
Let Alliance prepare, file, and track your Palm Desert permits while your crew stays on the job.
More California permitting guides
Riverside County
Read guide →Palm Springs
Read guide →Perris
Read guide →Palmdale Building Permit Guide
Read guide →Palo Alto Building Permit Guide
Read guide →Palos Verdes Estates Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Palm Desert permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.