Building permits in the City of Monrovia come from the Building Division (Building and Safety) of the Community Development Department at City Hall, 415 South Ivy Avenue (city 626-932-5550, Building and Safety 626-932-5581). Applicants check zoning with Planning, fill out the combined building, mechanical, plumbing and electrical application and meet Building and Safety staff, who decide whether plan review is needed. Fees follow the city’s Charges for Services for 2026-2027, which the city lists as effective July 7, 2026: flat tiers for small jobs and a valuation table for major work.
What requires a building permit in Monrovia?
The city’s answer is that in California you more than likely need a permit, and its “Do I Need a Permit?” page lists, from the code, the work that does not. Ordinary repairs need no permit, but repairs that cut away walls or structural members, change exits, or add, alter or replace piping, wiring or mechanical systems are not ordinary repairs. Emergency equipment replacements and repairs may be done first, but the permit application is due by the next working business day.
No permit needed
- One-story detached sheds, playhouses and similar structures up to 120 sq ft (their electrical, plumbing or mechanical work still needs a permit)
- Detached decks up to 200 sq ft and no more than 30 in. above grade that do not serve a required exit door
- Sidewalks and driveways no more than 30 in. above grade, not over a basement and not on an accessible route
- Above-ground prefabricated pools under 24 in. deep and up to 5,000 gallons
- Replacing breakers of the same capacity in the same place, low-voltage wiring under 25 volts and 50 watts
- Stopping leaks, clearing stoppages and resetting toilets without replacing pipes or valves
Permit needed
- Fences and drywall or small roof repairs (Minor Tier 1)
- Re-roofs, window retrofits, kitchen and bath remodels and siding
- Water heaters, HVAC change-outs, service upgrades, EV chargers and battery storage
- Block walls and retaining walls, decks and patio covers, pools and spas
- Replacing concealed drain, waste, vent or water pipes, which counts as new work
- Additions, new buildings and ADUs
The city adds two notes: ask the Fire Department about decks in the high fire zone, and ask the Public Services division about any work in the public right of way.
What Monrovia decides and what the state holds
Monrovia sets its own fee tiers and valuation table each year by council resolution, runs neighborhood compatibility and hillside review through Planning, protects oak trees with its own permit, levies a dwelling unit tax of $125 per bedroom (Resolution No. 7940) and requires a city business license. The building code is the state’s, and contractors hold state licenses.
Monrovia building department: who handles permitting
The City of Monrovia issues building, electrical, plumbing and mechanical permits inside city limits through the Building Division of its Community Development Department. The division examines plans and calculations and inspects construction, and it works with Planning, the Fire Department, Public Services and Code Enforcement on each project. Monrovia has its own Fire Department, which charges its own plan check and inspection fees for fire and life safety systems.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety, City Hall, 415 South Ivy Avenue, Monrovia, CA 91016 |
| City Hall | 626-932-5550 |
| Building and Safety and inspection requests | 626-932-5581 |
| Inspection hours | Monday to Thursday, 8 a.m. to noon and 1:30 to 4:30 p.m. |
| Friday service | Building and Safety open 7 a.m. to 5:30 p.m. for limited services |
Monrovia permit types
One combined application covers building, mechanical, plumbing and electrical permits, with a separate plan review application where plans are checked. Smaller work is priced in six flat tiers; larger work is a major permit priced by valuation.
| Tier | Fee 2026-27 | Examples in the schedule |
|---|---|---|
| Minor, Tier 1 | $117 | Drywall repair, roof repairs under 120 sq ft, fences; wall furnaces, mini-splits; outlets and fixtures (per unit), Level 1 and 2 EV chargers; water heater replacement, gas piping, water service, residential sewer replacement |
| Minor, Tier 2 | $221 | Garage re-roof, pool re-plaster, bath or kitchen remodel with no wall moves, seismic retrofit to the LADBS standard plan, siding, like-for-like windows (plus $20 per window), standard-plan block walls off hillsides, residential solar; HVAC change-out; service upgrades to 200 amps, battery storage |
| Minor, Tier 3 | $325 | Sheds, uncovered decks and gazebos under 500 sq ft, single-family re-roof, antennas, awnings, commercial signs and solar; services of 400 amps or more, Level 3 EV chargers |
| Moderate, Tier 1 | $486 | Covered porches, decks and patios under 500 sq ft, commercial non-structural re-roof, new spa, standard-plan retaining walls off hillsides |
| Moderate, Tier 2 | $979 | New residential pools off hillsides, sunrooms under 500 sq ft |
| Moderate, Tier 3 | $1,199 | ADU under 500 sq ft, garage conversions only |
Residential permits
Additions and new houses are major permits priced by valuation, with plan check at 100% of the building permit fee. Planning’s neighborhood compatibility design review comes first for many house projects: $217 for a single-story rear addition, $418 for a single-story front addition, $1,367 for a new single-story house, $1,341 for a second-story addition to a two-story house, $2,193 for a single-story house becoming two stories and $2,580 for a new two-story house. The city posts an ADU plan check submittal handout, and a building site plan review for pre-approved ADU plans is $309. The Earthquake Brace and Bolt program and a SolarAPP page are linked from the Building Division menu.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects are major permits by valuation, with major mechanical, electrical and plumbing permits at $178 per unit or $0.13 per square foot, whichever is greater. Commercial solar, signs and rooftop HVAC under 400 pounds fall in Minor Tier 3. The Fire Department charges $330 plus $22.47 per device for fire and life safety system plan check and inspection, and its commercial plan check and inspection are billed at its hourly rate.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning check: the city’s first step is property research with the Planning Division on zoning code requirements.
- Design review: Development Review Committee design review is $1,646; a minor exception for fences and walls $516.
- Hillside and discretionary permits: a hillside development permit is $10,505, a conditional use permit for new construction $4,437 and a variance $2,558.
- Oak trees: an oak tree permit is $247, waived if an arborist report is submitted.
- Historic properties: a historic preservation certificate of appropriateness is $332 and historic district (HCD) design review $1,122, or half that for non-structural work.
- Other Planning items: landscape plan check is $489, a standard zoning research letter $206 and a single-family address change $166.
- Housing projects: an SB 330 preliminary application is $1,194.
- Right of way: Public Works handles applications and permits for work in the street.
Monrovia building permit fees
The City Council updates the Schedule of Fees and Charges every year by resolution. The city’s Fees page lists the Charges for Services for 2026-2027 as effective July 7, 2026; the document itself is headed “Proposed Schedule of Fees & Charges” and gives the 2026-27 amounts in its proposed-fees column, and the resolution number is not printed on it. The amounts below come from that column. Major building permits and plan revision checks follow this valuation table:
Rather talk it over?
Call 1-855-478-4290 →| Project valuation | Building permit fee 2026-27 |
|---|---|
| $1 to $500 | $48.68 |
| $501 to $2,000 | $48.69, plus $7.09 for each additional $100 |
| $2,001 to $25,000 | $155.17, plus $23.65 for each additional $1,000 |
| $25,001 to $50,000 | $699.26, plus $18.43 for each additional $1,000 |
| $50,001 to $100,000 | $1,160.20, plus $12.52 for each additional $1,000 |
| $100,001 to $500,000 | $1,786.41, plus $9.74 for each additional $1,000 |
| $500,001 to $1,000,000 | $5,682.77, plus $9.39 for each additional $1,000 |
| Over $1,000,000 | $10,379.27, plus $7.99 for each additional $1,000 |
Plan check is 100% of the building permit fee for building permits, 50% for all other permits and 150% for fast-track review. Planning adds a plan check of building plans at 15% of the permit fee, and a general plan maintenance fee adds 15% of the building permit fee and 15% of the plan check fee. A $10 technology cost recovery fee and the state seismic and building standards fees are added.
| Item | Fee |
|---|---|
| Miscellaneous plan review | $264 |
| Additional plan review after 3 rechecks, per hour | $148 |
| Re-inspection | $171 |
| Inspection outside business hours | $586 |
| Inspection with no set fee, per hour | $177 |
| Permit renewal / plan review or permit extension | $67 / $34 |
| Work without a permit | $171 |
| Temporary certificate of occupancy / each extension | $586 / $1,173 |
| Alternative materials or methods request | $300 |
| Miscellaneous permit for work not otherwise listed | $163 |
Nonprofits can apply for a permit fee waiver on the city’s own application form.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them in Monrovia
Electrical, plumbing and mechanical permits use the same combined application as building permits. Small trade jobs fall in the flat tiers: a water heater replacement, a wall furnace or a Level 2 EV charger is $117, an HVAC change-out or a 200-amp service upgrade $221, and a 400-amp service $325. Larger trade work is a major permit at $178 per unit or $0.13 per square foot, whichever is greater.
The Building Division asks everyone pulling a permit to bring a copy of workers’ compensation insurance. Businesses working in the city need a Monrovia business license under Municipal Code Section 5.12.010: a regular license is $177 plus $15 per employee, whether the owner is in town or out of town, a three-month license $103 plus $8 per employee and a single-job license $56 plus $5 per employee, with a $35 application fee for a new business.
How to apply for a Monrovia building permit
Check zoning code requirements with the Planning Division, including design review, hillside or oak tree rules.
Complete the building, mechanical, plumbing and electrical permit application, and the plan review application if plans will be checked.
Come to City Hall at 415 South Ivy Avenue; staff decide whether the work needs plan review.
Submit plans and calculations for review; plan check is charged as a share of the building permit fee.
Bring a copy of workers’ compensation insurance and pay the permit fee.
Call 626-932-5581 by 3 p.m. the day before.
Review, corrections and what causes delay
Three rechecks are included; review after that is billed at $148 an hour, or at cost when a consultant does it. Fast-track review costs 150% of the building permit fee instead of 100%. Projects on a hillside fall outside the standard-plan tiers for walls and pools and may need a hillside development permit first. Work started without a permit draws a $171 penalty fee under Title 15 of the municipal code.
Monrovia building inspections
The division aims for next-day inspections. Call 626-932-5581 by 3 p.m. the day before and say clearly which areas of work are ready. Inspections run Monday through Thursday, from 8 a.m. to noon and from 1:30 to 4:30 p.m. Building and Safety is open on Fridays from 7 a.m. to 5:30 p.m. for limited services.
The division posts forms used during construction: a rough and final grade certificate, a building pad elevation certificate, a building location certificate and a smoke and carbon monoxide alarm form. A re-inspection is $171. A temporary certificate of occupancy is $586, and each of the first two extensions $1,173.
Want this handled start to finish?
Get a free quote →California building code in Monrovia
The Building Division checks plans against the building, electrical, plumbing and mechanical codes, and its exemption list on the “Do I Need a Permit?” page is quoted from the code. The fee schedule ties its work-without-permit penalty to Title 15 of the Monrovia Municipal Code. FEMA’s Community Status Book lists the City of Monrovia (community 065046) as participating in the National Flood Insurance Program, with no Special Flood Hazard Area mapped on its current maps.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Monrovia permit search and official resources
For permit history or copies of plans, ask Building and Safety at 626-932-5581. The fee schedule lists $55 to process a request to duplicate an official copy of plans, $4 per sheet to scan plans and $12 to scan permits and letters.
- Monrovia Building Division
- Permits
- Apply for a permit
- Do I need a permit?
- Inspections
- Building, mechanical, plumbing and electrical permit application
- Block wall and retaining wall standards
- ADU plan check submittal handout
- Accessory dwelling units
- Construction hours
- City fees
- Charges for Services 2026-2027
- Fire Department codes, fees and permits
- Public Works applications and permits
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Monrovia building permit FAQs
How much is a re-roof permit in Monrovia?
$325 for a single-family re-roof and $221 for a garage-only re-roof under the 2026-27 schedule.
Do I need a permit for a shed?
Not for a one-story detached shed up to 120 square feet, but any electrical, plumbing or mechanical work in it needs a permit.
Does a fence need a permit?
Yes. Fences are listed in Minor Tier 1 at $117.
How fast are inspections?
The city aims for the next day when you call 626-932-5581 by 3 p.m.; inspections run Monday to Thursday.
How is plan check charged?
100% of the building permit fee for building permits, 50% for other permits and 150% for fast track.
What should I bring to pull a permit?
A copy of workers’ compensation insurance, the completed application and any plans.
Is there a fee for a new ADU?
A garage conversion ADU under 500 square feet is $1,199; other ADUs are priced by valuation.
Is Building and Safety open on Fridays?
Yes, from 7 a.m. to 5:30 p.m. for limited services; inspections run Monday to Thursday.
Simplify Monrovia permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Monrovia sooner?
Let Alliance prepare, file, and track your Monrovia permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Montebello
Read guide →Monterey Park
Read guide →Montclair Building Permit Guide
Read guide →Monterey Building Permit Guide
Read guide →Monterey County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Monrovia permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.