In Monterey Park, permits come from the City’s Building and Safety Division, part of the Community Development Department, at its One Stop Building Permit Center in City Hall, 320 West Newmark Avenue (626-307-1300). Applications, plan check status and inspections run through Accela Citizen Access. Under the fee schedule effective July 1, 2026, a $50,000 job carries a $1,393.32 building permit fee and plan check at 81.2% of that fee, and the counter takes walk-ins Monday to Thursday from 8 a.m. to noon.
What requires a building permit in Monterey Park?
Apart from a short list of exempt items, Monterey Park requires a building permit to construct, install, alter, repair, relocate or demolish any building or structure, from garages and patios to retaining walls, pools, roofing and windows. Electrical, mechanical and plumbing permits cover wiring and fixtures, heating and air conditioning, commercial hoods, exhaust fans, water heaters, toilets and sinks.
City examples that need a permit
- Re-roofing and chimney repair
- Replacing drywall and repairing fire damage
- Security bars over windows
- Window and door change-outs
- Electrical panel upgrades
- Water heater replacement
- Voluntary seismic strengthening
Exempt in the City’s posted amendments
- One-story sheds or playhouses up to 120 sq ft that meet zoning
- Masonry walls or fences up to 4 ft and other fences up to 7 ft
- Retaining walls up to 4 ft from footing to top
- Painting, papering, tiling, carpeting, cabinets and counter tops
- Above-ground prefabricated pools under 18 inches deep
The building page points to Section 105.2 in Monterey Park Municipal Code Section 16.01.040 for the exempt list. The amendment document the City links (Ordinance No. 2140, written for the 2016 codes) is the source of the list above, so confirm an item with the counter before relying on it.
What Monterey Park decides and what the state holds
The City sets zoning and ADU standards (Municipal Code Chapter 21.50), its fee schedule and development impact fees, grading and right-of-way rules through Public Works, and local construction guidance such as its footing and slab guideline for expansive soils, which new construction must follow unless a soils report says otherwise. Title 24 supplies the building standards, and only state-licensed contractors may receive permits for licensed trades.
Monterey Park building department: who handles permitting
The City of Monterey Park issues all building and trade permits inside the city through its Building and Safety Division; Timothy Hou, AICP, is the Director of Community Development. Grading, encroachment and public-improvement permits come from Public Works Engineering, and fire sprinkler and fire alarm permits from Fire Prevention.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety, City Hall, 320 West Newmark Avenue, Monterey Park, CA 91754 |
| Phone | 626-307-1300 (Building and Safety); inspection line 626-307-1229 |
| Walk-in counter | Monday to Thursday, 8 a.m. to 12 p.m. (last sign-in 11:30 a.m.) |
| Appointments | Monday to Thursday, 2 to 5 p.m.; alternate Fridays 8 to 10 a.m. for permit issuance only |
| Online | Accela Citizen Access (applications, plan check status, inspections, records) |
| Other divisions | Planning 626-307-1315; Engineering 626-307-1320; Fire Prevention 626-307-1308; Water 626-307-1294; Licensing 626-307-1338 |
City Hall is open Monday to Thursday, 7:30 a.m. to 6 p.m., and closed to the public on Fridays. Permit fees are paid through the online portal, which caps credit card payments at $10,000.
Monterey Park permit types and what comes first
Each building needs its own permit, except that a single-family house and its detached garage may share one. A building permit does not include the electrical, mechanical or plumbing work, but those trade permits can be bundled with it as a combination permit. In the portal, applicants pick a record type such as Residential Building Addition (which also covers new ADUs and garage-to-ADU conversions), Residential Building Alteration-Repair, Pool-Spa, Solar or Demo, with matching non-residential types.
Residential permits
Work that needs no plans can be issued over the counter; anything else goes through plan check, which the City says can take anywhere from a single visit to several months when discretionary review is involved. ADUs are allowed in every residential zone: plans are emailed to the Planning Division for preliminary review and go to the Building portal once Planning signs off. Garages converted to ADUs may expand by up to 150 square feet for access. The City’s pre-approved ADU program, with plan sets approved as of June 2026 in 800, 1,000 and 1,200 square foot versions, offers plans about 70% complete that the owner’s designer finishes for the site.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial additions, tenant improvements, signs, pools and solar have their own record types. Restaurants, auto garages, print shops, laboratories, medical offices and other uses that generate industrial waste may need grease traps, interceptors or sample boxes, which Fire Prevention reviews and permits separately, and tenant work that increases industrial waste discharge pays a Los Angeles County Sanitation Districts fee before the City issues the permit.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. Discretionary reviews and ADU preliminary review; appointments Monday to Thursday, 2 to 5 p.m., booked at least 24 hours ahead, or walk-ins from 8 a.m. to noon.
- Grading and right of way. A Public Works grading permit when cut and fill exceed 50 cubic yards, plus encroachment permits and geotechnical review through Engineering.
- School fees. New construction and additions pay a school development fee at one of the four districts serving the city (Alhambra, Garvey, Los Angeles Unified or Montebello Unified), using a fee write-up from the Building counter; residential additions of 500 sq ft or less may be exempt but must still be registered with the district.
- Demolition. A demolition permit only when a whole building is removed, one per building; creating a vacant lot needs Planning approval, and contractors notify the Air Quality Management District at least 10 days before removing more than 100 square feet of building materials.
Monterey Park permit fees
The Building and Safety fee schedule in effect is dated July 1, 2026. The building permit fee comes from a valuation table, plan check is a percentage of that fee, and several surcharges are figured on valuation. Valuation is calculated from the City’s per-square-foot table (for example $177.63 per square foot for a type VB one- or two-family dwelling and $71.79 for a type VB garage or utility building), with remodels valued at 20%, 40%, 60% or 80% of new construction by extent.
| Item | Fee |
|---|---|
| Building permit, $10,000 / $20,000 valuation | $484.77 / $711.13 |
| Building permit, $50,000 / $100,000 valuation | $1,393.32 / $2,270.86 |
| Over $100,000 | $2,270.86 plus $13.44 per additional $1,000 |
| Building plan check | 81.2% of the building permit fee; minimum $283.33 per trade |
| Plan revision after issuance | $146.98 per hour (half-hour minimum) |
| Permit issuance | $67.58 for one trade, $50.69 for each additional trade |
| Plans archival / General Plan revision surcharge | 0.1% / 0.2% of valuation |
| Energy and accessibility plan check | Separate valuation tables ($150.40 and $75.20 at $50,000) |
| Electrical: service up to 200 amps / EV charger | $211.44 / $118.37 |
| Plumbing: fixture / water heater | $42.29 / $67.66 |
| Mechanical: furnace up to 100,000 BTU | $84.57 |
Rather talk it over?
Call 1-855-478-4290 →| Use | Fee |
|---|---|
| Detached dwelling unit | $12,387 per unit |
| Attached dwelling unit | $11,324 per unit |
| Commercial lodging | $3,434 per unit |
| Retail, service, office | $4.906 per sq ft |
| Manufacturing, industrial / institutional | $1.862 / $1.789 per sq ft |
Single-family additions and alterations, and ADUs under 750 square feet, are exempt from the impact fee. The state strong-motion fee (0.013% of valuation for residential work, 0.028% for other buildings) and the state green building fee ($1 per $25,000 of valuation) are collected with the permit, and Engineering, Water and Fire Prevention quote their own review fees.
Example from the table. A residential job valued at $50,000 has a building permit fee of $1,393.32 and plan check of $1,131.38 (81.2%). Adding one-trade issuance ($67.58), plans archival ($50), the General Plan surcharge ($100), the strong-motion fee ($6.50) and the green fee ($2) gives $2,750.78, before any energy or accessibility plan check, trade permits, school fees or impact fees.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are priced per item on the 2026 schedule, each carrying the $67.58 issuance fee for a stand-alone permit, and plan check, when plans are needed, is 81.2% of the trade permit fee with a $283.33 minimum. A separate plan check application covers electrical, mechanical and plumbing plans.
The City issues permits for licensed work only to contractors holding the matching state license, and its permit issuance page links a list of license classes and the work each may do. Homeowners may get permits in some circumstances as owner-builders, using the City’s Owner Builder Acknowledgement and Permit Declaration. Before final sign-off on anything other than a single-trade permit, such as a re-roof or an air-conditioner replacement, the City’s Licensing Division must clear the job, and the permittee submits a Declaration of Contractor’s List naming the contractors who worked on it.
Special inspectors must be pre-qualified by the Building Official and registered with the City before they inspect in Monterey Park.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Monterey Park
Book a Planning appointment or walk in for zoning, discretionary or ADU review before you prepare full plans.
Read the City’s Step by Step Building Permit Guide, register in Citizen Access, open the Building tab and choose Create an Application.
Pick the residential or non-residential record type, then enter the address, scope, valuation, area, occupancy group, construction type and fixture counts.
Attach each document as a separate PDF: plans, the plan check application, the owner-builder acknowledgement or permit declaration, and the construction debris recycling form where it applies.
Follow review status and corrections in Citizen Access; revisions after approval follow the City’s plan revision policy.
Pay school and sanitation fees at those agencies and obtain Planning, Engineering, Fire and Water clearances.
Pay City fees online and collect the permit; over-the-counter permits are limited to work that needs no plan check.
Review, corrections and what causes delay
The City warns that a permit can be as quick as a counter visit or take several months once plan check and discretionary review are involved. Outside-agency payments need planning too, because the City cannot issue the permit until the school district and, where it applies, the Sanitation Districts have been paid. Friday appointments are for permit issuance only, not plan checks or inspections, and other divisions are not available that day.
Inspections in Monterey Park
Request inspections online in Citizen Access or on the 24-hour inspection line, 626-307-1229, giving the job address, permittee name, permit number and type of inspection. Requests received before 4 p.m. Monday to Thursday are usually scheduled for the next inspection day; inspections run Monday to Thursday, and no appointments are made, although a three-hour window may be given after 8 a.m. on the day. One City page gives inspection hours as 9 a.m. to 4 p.m. and another as 8:30 a.m. to 4:30 p.m. To confirm your request is on the list, check the portal or call 626-307-1300 that morning.
Final sign-off usually needs approval from every division that stamped the plans (Planning, Engineering, Fire Prevention, Water, Parks and Licensing) before the Building final inspection is made, and utility releases follow sign-off. Demolition projects also need a geotechnical engineer’s compaction certification for backfill and, for pools, removal of the top three feet of the structure.
Building code in Monterey Park
Monterey Park adopts the state codes, with local amendments, in Title 16 of its Municipal Code (Section 16.01.040 holds the permit exemptions). FEMA lists Monterey Park as a participating community in the National Flood Insurance Program, with no special flood hazard area mapped in the city.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Frequently asked questions
How much is a building permit in Monterey Park?
It depends on valuation: $484.77 at $10,000, $1,393.32 at $50,000 and $2,270.86 at $100,000 under the schedule effective July 1, 2026, plus plan check at 81.2% of the permit fee, issuance fees and valuation-based surcharges.
Do I need a permit to replace a water heater or windows?
Yes. The City lists water heater replacement and window and door change-outs among the jobs that need a permit, along with re-roofing and electrical panel upgrades.
Does a fence need a permit?
Under the amendments the City links, masonry walls or fences up to 4 feet and other fences up to 7 feet are exempt; taller ones, and walls holding back soil over 4 feet, need a permit.
Can a homeowner pull a permit?
In some circumstances, as an owner-builder, using the City’s Owner Builder Acknowledgement. Licensed trade work otherwise goes to state-licensed contractors.
How do I schedule an inspection?
Online in Accela Citizen Access or on the 24-hour line, 626-307-1229, by 4 p.m. for the next inspection day (Monday to Thursday).
What other fees are paid outside City Hall?
School development fees at the school district for new construction and additions, and Los Angeles County Sanitation Districts fees for new construction and some tenant remodels.
Is there an impact fee on an ADU?
ADUs under 750 square feet are exempt from the City’s development impact fee; a new detached house pays $12,387 per unit.
How can I look up old permits?
Citizen Access shows records from October 1997 on; older records can be viewed at the Building counter or requested through a public records request.
Monterey Park permit search and official resources
Permit and inspection history from October 1997 onward is searchable in Accela Citizen Access, which also shows plan check status and inspection results. Earlier records are kept at the Building and Safety counter.
Inspections are where schedules slip.
Get a free quote →- Building and Safety Division
- Building permits: what needs a permit
- Accela Citizen Access portal
- Step by Step Building Permit Guide (PDF)
- Plan check and permit fees, effective July 1, 2026 (PDF)
- Fees paid to other agencies
- Permit applications and forms
- Contact us and service hours
- Request for building inspections
- Final sign-off of permits
- Demolition requirements
- Accessory dwelling units
- California Building Standards Code (Title 24)
Simplify Monterey Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Monterey Park sooner?
Let Alliance prepare, file, and track your Monterey Park permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Paramount
Read guide →Pico Rivera
Read guide →Moorpark Building Permit Guide
Read guide →Moraga Building Permit Guide
Read guide →Moreno Valley Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Monterey Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.