Building permits in Paramount come from the city’s Building and Safety Division, part of the Planning and Building Department at City Hall, 16400 Colorado Avenue ((562) 220-2036). Every permit type can be applied for online through the city’s iWorQ portal, a first plan check takes about 10 business days, and the master fee schedule adopted by Resolution 24:040 adds a $57 issuance fee to each permit on top of the valuation-based building fee.
What requires a building permit in Paramount?
The Building and Safety Division permits the construction, alteration, demolition and relocation of buildings and structures in the city, and it enforces the California building, electrical, plumbing and mechanical codes together with Paramount’s own ordinances. The city’s fee schedule and handouts show the kinds of work that are routinely permitted:
Building permit
- New buildings, additions, conversions and accessory dwelling units
- Structural remodels and demolition
- Re-roofing, with the city’s roofing standards for residential zones
- Block walls (the city’s standard detail covers walls up to 6 feet)
- Grading, priced by cubic yards
- Pools, signs and relocation of buildings
Trade permits
- Electrical: services, circuits, outlets, appliances, pool wiring, temporary power
- Plumbing: fixtures, water heaters, gas piping, backflow devices, water piping
- Mechanical: compressors, air handlers, ventilation fans, kitchen hoods
- Sewer: house sewer connections and private sewage systems
- EV chargers and rooftop solar
The city’s pages do not post a list of permit-exempt work, so ask Building and Safety before starting a small job without a permit. Work found without a permit carries an investigation fee equal to the permit fee, capped at $1,400 under the current schedule.
What Paramount decides and what the state holds
Paramount sets its own fees, zoning, design review and administrative approvals, plus local rules such as its roofing materials standard for residential zones and the construction-hours limit of no work between 8 p.m. and 7 a.m. It also requires contractors to hold a Paramount business license. The state sets the building code and licenses the contractors who pull permits.
Paramount building department: who handles permitting
The City of Paramount issues its own building permits through the Building and Safety Division. Plan review, permit issuance and inspections are all handled by the division, and Planning staff in the same department clear zoning and administrative approvals before plan check.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, Planning and Building Department, City Hall, 16400 Colorado Avenue, Paramount, CA 90723 |
| Phone and email | (562) 220-2036; buildingpermits@paramountcity.gov; City Hall (562) 220-2000 |
| Counter hours | Monday to Thursday, 8 a.m. to 5:30 p.m.; Friday, 8 a.m. to 5 p.m.; closed every Wednesday from 11:30 a.m. to 2:30 p.m. |
| Plan drop-off | Counter submittals until 5 p.m. Monday to Thursday and 4:30 p.m. Friday |
| Payments in person | Before 4:30 p.m. Monday to Thursday; before 4 p.m. Friday |
| Inspectors in the office | 8 to 8:30 a.m. and 4 to 4:30 p.m., Monday to Friday |
| Portal | iWorQ: online application, project status, fee payment and inspection requests |
Paramount permit types
All permit applications can be filed online. The iWorQ form asks for the main property address or APN, the applicant, a detailed description of work, the job address and the planning approval, and the city asks for contractor license information, any authorization letters and the Paramount business license to be uploaded at submittal. Files larger than 100 MB should be flagged in the description.
Residential permits
- Additions and alterations. Planning reviews them first through an Administrative Action application (the general form covers additions), filed online.
- Accessory dwelling units. ADUs go through an Administrative Action – ADU application, and the plan set must put the title sheet, existing and proposed site plan, existing and proposed floor plan, mechanical, electrical, plumbing and structural sheets, Title 24 energy calculations and the administrative approval each on its own sheet.
- Pre-approved ADUs. Under the city’s Plan-It Paramount program, homeowners can use one of four city plans: a 447-square-foot studio, a 630-square-foot one-bedroom, a 744-square-foot two-bedroom and a 1,000-square-foot three-bedroom unit. City-designed plans are free, no changes to them are allowed, and the unit must still meet the ADU ordinance on setbacks, height and building separation.
- Re-roofs. Residential re-roofs must use the approved high-profile composition shingles (minimum 25-year dimensional shingle) with a decorative ridge cap, or other brands that meet Municipal Code Section 44-26.b.3. Lightweight tile may need structural calculations; standard-weight tile always does, with two sets of framing plans and at least ten working days of plan check.
- Rooftop solar. Eligible residential roof-mounted retrofit systems can use SolarAPP+, which approves the plans instantly; the city emails the permit number within 24 business hours.
- SB 9 lot splits. Urban lot splits are accepted in the R-1 zone only.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family permits are issued only to California licensed contractors. EV charging stations follow Chapter 15.06 of the Municipal Code, added in 2022, with separate checklists for single-family homes and duplexes, multi-family buildings and non-residential sites; applications can be emailed or filed online and signed electronically. For 1 to 25 chargers at one site the city has 5 business days to deem the application complete or send a deficiency notice; for sites with 26 or more chargers the page gives 10 business days for completeness and approval 40 business days after the application is complete.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning approval. Larger projects go to the Planning Commission or Development Review Board (conditional use permits, zone changes, variances, subdivisions and development review); the commission meets on the first Wednesday of each month at 6 p.m.
- Agency clearances. The division points applicants to the Los Angeles County Fire Department Regional Plan Check Office, the Sanitation Districts of Los Angeles County, the county health department and the South Coast AQMD for reviews outside the city.
- Construction waste. The city publishes a Construction and Demolition Debris Diversion Program packet with its forms and guidance.
- Street work. Driveways, curbs, gutters and sidewalks in the public right-of-way need their own Public Works permits.
Paramount permit fees
Fees come from the Master Fee Schedule adopted by the City Council as Resolution 24:040 on November 12, 2024, effective February 1, 2025, after a 2024 cost-of-services study. The Building and Safety Division sets each project’s valuation; the building permit and plan check fees are then read from the city’s valuation table, while trade permits are itemized. A $57 issuance fee is added to every permit.
| Item | Fee |
|---|---|
| Permit issuance (each permit) | $57 |
| Building permit / plan check, valuation up to $1,000 | $100.55 / $108.94 |
| Building permit / plan check, valuation $49,001 to $50,000 | $1,546.43 / $1,314.47 |
| Storm drain, general plan and public art fees above $190,000 | 0.10%, 0.20% and 1.00% of total valuation |
| Over-the-counter plan review | $293 |
| Preliminary plan review before applying | $138 |
| Expedited plan review | 125% of the plan check fee |
| Re-inspection | $406 |
| Certificate of occupancy / temporary certificate | $53 / $53 |
| Inspection of a use or occupancy change, Group R or M | $375 |
| Demolition inspection | $375 |
| Records management | 0.1% of the building permit fee, $10 minimum |
| Technology fee | 7.5% |
| Work without a permit (investigation) | Equal to the permit fee, up to $1,400 |
| Grading, 1 to 50 / 51 to 100 cubic yards | $211 / $350 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the table: a project valued at $50,000 that needs plans pays $1,314.47 for plan check and $1,546.43 for the building permit, plus the $57 issuance fee, the state seismic fee for a one- to three-story home ($6.50) and the combined storm drain, general plan and public art fee ($447.45), or $3,371.85 before trade permits and the technology fee. Plan check applies only when plans are required. For each $1,000 above $190,000 the schedule prints two different increments ($15.84 and $12.84 on one note, $8.45 and $7.18 on another), so ask the division which applies to a large project.
Planning fees in the same resolution include $1,610 for an administrative action, $3,755 for design-related development review, $4,625 for a conditional use permit, $4,660 for a zone variance, $830 plus engineering costs for an urban lot split and $200 for a sign permit; a preliminary project review with Planning is free. Public Works charges $430 for a residential driveway permit, $560 for a commercial one and $430 for the first 50 linear feet of curb, gutter or sidewalk work.
Trade permits and who may pull them in Paramount
Electrical, plumbing, mechanical and sewer permits each carry the $57 issuance fee plus itemized charges. Examples from the current schedule: new single- and two-family buildings are wired for $0.26 per square foot (multi-family $0.23); a service of 600 volts or less up to 200 amps is $81; a new in-ground pool is $144; each plumbing fixture, water heater or set of 1 to 5 gas outlets is $32; a refrigeration compressor up to 100,000 BTU is $78; and connecting a house sewer to the public sewer is $90.
- Owner-builders. The city issues permits to an owner-builder only for the single-family home the owner lives in. The owner needs photo ID; a recent buyer not yet on the Assessor’s records brings the recorded grant deed or trust deed, or a certified copy from the Registrar-Recorder’s office in Norwalk.
- Contractors. Bring the state contractor’s license (usually the CSLB wallet card), a workers’ compensation certificate if you have employees, and a current Paramount business license, which can be paid for when the permit is issued.
- Agents. A contractor’s agent needs an original notarized letter of authorization on company letterhead, no more than one year old.
- Commercial and multi-family. Permits for commercial, industrial and multi-family work, including duplexes, townhomes and condominiums, go only to licensed contractors.
- Special inspectors. They register by emailing the city’s registration form and certification to SIRegistration@paramountcity.gov, and the division replies with an approved daily report form.
If an expired license blocks an online submission, the city asks contractors to upload a photo of the renewed CSLB license or call a permit technician with the license, workers’ compensation and business license details.
Rather not deal with the building department?
Get a free quote →How to apply for a Paramount building permit
Additions, ADUs and new units start with an Administrative Action application filed through the city’s online portal.
Put each required item on its own sheet and list it in the sheet index, with structural and energy documents where needed.
File the building permit application in iWorQ and upload license, authorization and business license documents.
Get fire, sanitation, health or air district clearances where they apply.
Use the permit number to check plan check status and corrections online.
Pay fees online or at the counter before the payment cut-off, then keep the permit and job card on site.
Review, corrections and what causes delay
The division says a first plan check typically takes about 10 business days and resubmittals or revisions about 5 to 7 business days. The submittal pages stress the planning approval, separate sheets and current contractor credentials. Changes after approval use the city’s permit revision form, and a permit about to run out can be extended with the Request for Extension of Permits form, which asks for the hardship, the time needed and the expected completion date; staff approve or deny each request and set the fee.
Inspections in Paramount
Inspections are requested by permit number through the city’s online inspection system. Requests made before 4 p.m. are scheduled for the next available day; requests after 4 p.m. are scheduled two business days later, not counting weekends and holidays. The solar page also allows phone requests to (562) 220-2036 between 8 a.m. and 4 p.m. the business day before, but only with a live person, since voicemail requests are not accepted.
Inspectors work mornings from 8:30 a.m. to noon and afternoons from 12:30 to 4 p.m., Monday to Friday. Calling between 8 and 8:30 a.m. on the inspection day gets you a morning or afternoon window. Keep the approved plans and job card on site, and check the online portal for the inspector’s correction notes after each visit; a re-inspection costs $406.
The fee schedule prices a certificate of occupancy at $53. No construction, repair or remodeling work is allowed between 8 p.m. and 7 a.m.
California building code in Paramount
The Building and Safety page lists the 2025 California building, residential, plumbing, electrical, mechanical, green building and energy codes as the codes in force, with the Municipal Code holding the city’s own rules. FEMA’s Community Status Book lists Paramount (community 065049) as participating in the National Flood Insurance Program, with no special flood hazard area shown on its current map.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Paramount building permit FAQ
Can I apply for a Paramount building permit online?
Yes. The city accepts online submittals for all permit applications through iWorQ, and plans can also be dropped off at the City Hall counter.
How much is a building permit in Paramount?
It depends on valuation. Under Resolution 24:040 a $50,000 project with plans pays $1,546.43 for the permit and $1,314.47 for plan check, plus the $57 issuance fee and other add-ons.
Can a homeowner pull a permit in Paramount?
Yes, but only as an owner-builder for the single-family home they live in. Commercial, industrial and multi-family permits go only to licensed contractors.
Do contractors need a Paramount business license?
Yes. Contractors must show a current Paramount business license, which can be paid for when the permit is issued.
How long does plan check take?
About 10 business days for a first submittal and 5 to 7 business days for resubmittals, according to the division.
Is there a pre-approved ADU plan?
Yes. Plan-It Paramount offers four city plans from a 447-square-foot studio to a 1,000-square-foot three-bedroom unit, free of charge, used without changes.
How do I schedule an inspection?
Request it online with your permit number before 4 p.m. for the next available day, or call (562) 220-2036 the business day before and speak to staff.
How do I get copies of old permits or plans?
Archived permits are requested through the city’s public records request. Building plans are not released that way and need the separate plan-duplication process.
Paramount permit search and official resources
Permit status, corrections and inspection results are searched in the iWorQ portal by permit number. Archived permits for a property are requested through the city’s public records request. Copies of housing or commercial building plans are not public records requests: staff first verify the requester’s eligibility, and the copies may only be used for maintenance, operation or use of the building (contact buildingpermits@paramountcity.gov).
Inspections are where schedules slip.
Get a free quote →- Paramount Building and Safety Division
- Online services: iWorQ applications, status, inspections and ADU submittals
- Who can pull a permit, FAQs and handouts
- Master Fee Schedule, Resolution 24:040 (PDF)
- City user fees
- AB 602 development fee information
- Planning permits and applications
- ADU resources and Plan-It Paramount plans
- EV charging permits
- SolarAPP+ solar permits
- Re-roofing standards (PDF)
- Block wall detail (PDF)
- Request for extension of permits (PDF)
- California Building Standards Code (Title 24)
Simplify Paramount permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Paramount sooner?
Let Alliance prepare, file, and track your Paramount permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Pico Rivera
Read guide →Rancho Palos Verdes
Read guide →Parlier Building Permit Guide
Read guide →Pasadena Building Permit Guide
Read guide →Paso Robles Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Paramount permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.