Building permits in the City of Parlier come from the city’s Community Development Department, which covers planning, housing and building at 1100 East Parlier Avenue (559-646-3545 ext. 242; building inspections 559-847-7928). You file the city’s building permit application and permit form, and licensed solar contractors can use SolarAPP+ for standard rooftop systems. Permits lapse if work does not start, or no inspection is called, within 180 days. The city posts its planning and impact fees but no building permit fee table, so the building fee is quoted by the department.
What requires a building permit in Parlier?
Parlier’s building permit form shows what the department permits: building work of every kind, with separate fee sections for electrical, plumbing, mechanical and septic work and a line for each new single-family home by size. The form also records whether the site is in a fire zone or a mapped flood zone, the zoning setbacks and the school district.
Permits on the city form
- New buildings, garages, patios and decks (square footage is recorded for each)
- Electrical work, from new circuits and outlets to service panels, pool wiring and motors
- Plumbing fixtures, water heaters, water and gas piping, building sewers and backflow devices
- Mechanical work: furnaces, ducts, hoods, wood-burning appliances and cooling units
- Septic systems
- Swimming pools
- Rooftop solar and energy storage (SolarAPP+ or plan review)
Planning permits
- Fence permit ($75)
- Sign permit ($50)
- Home occupation permit ($150)
- Rear yard encroachment ($150)
- Site plan review, use permits and variances for larger projects
The city does not post a list of work exempt from a building permit; call Community Development at ext. 242 before starting minor work such as a shed or a short wall.
What Parlier decides and what the state holds
Parlier sets its own planning, building and impact fees by council resolution, runs its own zoning code and construction and demolition recycling program, and licenses businesses through its Finance Department. Contractor licenses are state licenses: the permit form carries the licensed contractor declaration with license number and class, the owner-builder declaration, and the workers’ compensation declaration that every applicant signs.
Parlier building department: who handles permitting
The City of Parlier issues building permits inside its limits through the Community Development Department, whose application forms are printed under the heading “City of Parlier Building Department.” The department handles planning, housing, building and economic development, and inspections have their own phone line. Fire protection comes from the Parlier Volunteer Firefighters working together with Fresno County Fire Protection Services. Land outside the city limits is unincorporated Fresno County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development Department, 1100 East Parlier Avenue, Parlier, CA 93648 |
| Phone / fax | 559-646-3545 ext. 242 / 559-646-0416 |
| Building inspections | 559-847-7928 |
| CDevelopment@parlier.ca.us | |
| Business licenses | Finance Department, City Hall (559-646-3545) |
Parlier permit types
Parlier uses two forms. The one-page Application for Building Permit asks for the address, a written scope of work, the estimated cost, and the owner, contractor and designer, with the contractor’s license and workers’ compensation policy. The longer Building Permit form becomes the permit itself once validated: it carries the declarations, zoning and setback check, flood map page and zone, school district, valuation and the fee sections staff complete.
Residential permits
- New homes have their own lines on the permit form: electrical and mechanical by floor area and plumbing by the number of bathrooms, alongside the building permit, plan check and state fees.
- Garages, patios and decks are listed by square footage on the same form.
- Solar and batteries. Licensed contractors can file standard rooftop solar and energy storage through SolarAPP+, which checks the design automatically, charges its own processing fee and issues an inspection checklist, SolarAPP+ ID and job card.
- Flood zone work uses the FEMA elevation certificate the city posts with its forms.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial projects use the same forms with plans by an architect or engineer. They may need site plan review first ($3,500, or $850 for an administrative review) and pay non-residential impact fees, with water and sewer hook-up fees based on one equivalent unit for every 1,200 square feet of building. The city posts its construction and demolition recycling brochure, guidelines and a recycle and reuse plan form for construction projects.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning review. Site plan review, conditional use permits (minor $1,550, major $3,750) and variances ($1,550) are handled by Community Development under the planning fee schedule. A minor conditional use permit is limited to little or no new construction on a parcel under half an acre that already meets the general plan and zoning.
- Deposits, not caps. Planning fees are minimum deposits; if processing costs run over, the city may stop work on the file or hold the certificate of occupancy until the overage is paid. Unlisted processes need a $500 minimum deposit.
- Flood zones. Parcels in a mapped flood zone record the FEMA map page and zone on the permit, and the city posts the FEMA elevation certificate form with its building forms.
Parlier permit costs and fees
Parlier posts two fee documents on its Community Development page: the planning pages of its 2018 Planning, Engineering and Building Fee Schedule (Council Resolution 2018-33, effective August 20, 2018) and its development impact fees, adopted in May 2014 after a temporary reduction under Resolution 2013-15 ended and labeled current as of 2022. The building permit fee table itself is not posted; the department calculates building, plan check and trade fees from the valuation and items on the permit form. That form’s fee block has lines for the building permit, plan check, each trade permit, septic, swimming pool, energy surcharge, the state strong motion (SMI) fee, sewer, drainage, re-inspection and microfilming, and a box for whether a consolidated permit fee was used.
| Item | Fee |
|---|---|
| Fence permit | $75 |
| Sign permit | $50 |
| Home occupation permit | $150 |
| Director review and approval | $1,150 |
| Site plan review / administrative site plan review | $3,500 / $850 |
| Conditional use permit | $1,550 minor; $3,750 major |
| Variance | $1,550 |
| Minor deviation | $250 |
| Temporary use permit | $150 |
| Lot line adjustment | $1,550 |
| Annexation (LAFCo fees extra) | $3,600 |
Rather talk it over?
Call 1-855-478-4290 →The same 2018 schedule lists $650 to appeal a decision of the Planning Director or the Planning Commission, $100 for an address change, $300 for a certificate of compliance, $1,250 for a lot merger, $4,450 for a tentative parcel map, $2,600 for a rezone and $3,750 for a general plan amendment. Environmental review runs from $350 for a notice of exemption to $5,950 for a negative declaration and $7,500 for a mitigated negative declaration.
| Item | Fee |
|---|---|
| Wastewater treatment, low-density home | $1,834.11 per equivalent unit |
| Domestic water, low-density home | $2,156.84 per equivalent unit |
| Storm drainage, low density | $2,396.47 per acre |
| City management and general services | $319.53 per acre |
| Public safety | $319.53 per acre |
| City parks | $559.18 per equivalent unit |
| Water hook-up, residential | $400.19 per connection |
| Sewer hook-up, residential | $615.65 per connection |
For one low-density home, the per-unit charges listed (wastewater, water, parks and the two hook-ups) come to $5,565.97, before the acreage-based storm drainage, general services and public safety fees. Commercial and industrial buildings pay the hook-up fees per equivalent unit of 1,200 square feet, and fire flow fees of $1,078.40 per unit.
Trade permits and who may pull them
Electrical, plumbing, mechanical and septic permits are part of the city’s permit form, each with its own permit fee and item list, so one validated form can cover all the trades on a job. For a new house, electrical and mechanical work are priced by floor-area bands and plumbing by the number of bathrooms.
Rather not deal with the building department?
Get a free quote →- Licensed contractors sign the declaration that their state license is in full force and give the license number and class; the building, plumbing, electrical and mechanical contractors are each listed with their license number.
- Owner-builders sign the owner-builder declaration, choosing whether they will do the work themselves or with their own employees on a building not offered for sale, or hire only licensed contractors.
- Workers’ compensation. Applicants show a certificate of insurance or sign the exemption if they will employ no one.
- Business license. The Finance Department handles city business licenses.
How to apply for a Parlier building permit
Ask Community Development (ext. 242) about setbacks and whether site plan review or a use permit is needed.
Fill in the Application for Building Permit with the scope, estimated cost, owner, contractor and designer.
Have an architect or engineer prepare plans where the work needs them, and a flood elevation certificate in a flood zone.
Submit at 1100 East Parlier Avenue (questions to CDevelopment@parlier.ca.us); solar contractors may use SolarAPP+.
Staff calculate the building, plan check, trade, state and impact fees on the permit form.
Begin work and call for inspections promptly; the permit is void if work does not start or no inspection is called within 180 days.
Review, corrections and what causes delay
Parlier does not publish plan review times. Planning deposits that run out can pause a file until they are topped up. Missing license, workers’ compensation or lender information on the declarations also holds up issuance.
Inspections in Parlier
Call the building inspection line, 559-847-7928, to schedule inspections. For SolarAPP+ jobs, the approved SolarAPP+ record gives you the inspection checklist and job card, and you then call the same number for the site inspection.
- A permit expires and becomes void if no inspection is called within 180 days, so long gaps between stages can cost you the permit.
- The septic section of the permit form lists fees for a new system, a repair and a test hole inspection.
- The form’s fee block includes a re-inspection line, so a failed stage can add a charge.
Want this handled start to finish?
Get a free quote →Parlier flood maps and recycling rules
FEMA’s Community Status Book lists the City of Parlier (community 060454) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated July 20, 1984 and the current map effective February 18, 2009. The city’s construction and demolition recycling program is explained in a brochure, guidelines and a program process sheet posted with the building forms.
California building code in Parlier
Parlier enforces the state building code through its Community Development Department and links the California Building Standards Code and its municipal code from the department page. Its own code and forms set the local pieces: the 180-day permit expiry, zoning setbacks and the recycling program.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Parlier building permit FAQs
Who issues building permits in Parlier?
The city’s Community Development Department at 1100 East Parlier Avenue (559-646-3545 ext. 242).
How do I schedule an inspection?
Call the building inspection line at 559-847-7928.
How much is a building permit?
The city does not post its building fee table; Community Development calculates the fee from the valuation and items on the permit form.
How much is a fence permit?
$75 under the 2018 fee schedule (Resolution 2018-33).
Can I use SolarAPP+?
Yes, for standard residential rooftop solar and energy storage filed by a licensed contractor.
How long is a permit good for?
It becomes void if work does not start, or no inspection is called, within 180 days.
What impact fees does a new home pay?
About $5,566 in per-unit wastewater, water, parks and hook-up fees, plus acreage-based storm drainage, general services and public safety fees.
Parlier permit records and official resources
For copies of past permits, plans or elevation certificates, contact Community Development at ext. 242 or CDevelopment@parlier.ca.us.
Inspections are where schedules slip.
Get a free quote →- Parlier Community Development: forms, fees and SolarAPP+
- Application for building permit
- Building permit form and declarations
- Planning fee schedule, Resolution 2018-33
- Development impact fees (May 2014)
- Construction and demolition recycling brochure
- FEMA elevation certificate
- Finance Department and business licenses
- Fire protection services
- FEMA Community Status Book, California
Simplify Parlier permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Parlier sooner?
Let Alliance prepare, file, and track your Parlier permits while your crew stays on the job.
More California permitting guides
Fresno County
Read guide →Sanger
Read guide →Clovis
Read guide →Pasadena Building Permit Guide
Read guide →Paso Robles Building Permit Guide
Read guide →Patterson Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Parlier permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.