Clovis, California Building Permit Guide

Everything contractors, builders and developers need for a City of Clovis building permit — the Building Division, Title 24 with city amendments, plan check and inspections.

Authority: Building DivisionCode: Clovis (Title 24)Phone: 559-324-2390
Fresno metro city
About 129,000City is its own AHJ
Planning and Development
Title 24 with city amendmentsBuilding Division
Master plan growth areas
Steady new residentialImpact fees apply
Self-service permit portal
Online applicationsConfirm the route first

Clovis is a Fresno metro city of about 129,000 residents, one of the faster-growing cities in the central San Joaquin Valley with large master-planned expansion areas on its northern and eastern edges. Its Building Division, within Planning and Development Services, is the sole building authority inside the city, issuing permits under Title 24 with Clovis amendments.

This guide covers the Building Division, its permit process, Title 24 with city amendments, and the growth-area and impact-fee issues that shape Clovis construction.

This guide covers work inside the City of Clovis limits. Unincorporated Fresno County and the City of Fresno are separate authorities.

🏜️

The City of Clovis runs its own Building Division, distinct from Fresno County and from the City of Fresno next door. Work inside the city files with Planning and Development Services under Title 24 with city amendments. The division is established under the city’s own municipal code title for buildings and construction, and applications run through the city’s self-service portal.

What requires a building permit in Clovis?

Permit required

  • New commercial, multi-family and residential construction, additions and change of occupancy
  • Structural alterations, load-bearing changes, foundations, decks and retaining walls
  • Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
  • Plumbing under the California Plumbing Code
  • Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
  • Re-roofing above the exempt scope, pools, signs, and demolition

Often exempt

  • Minor repairs and maintenance replacing materials in kind
  • Small accessory structures below the local threshold, where zoning allows
  • Painting, flooring, cabinetry and other finish work
  • Like-for-like fixture or appliance swaps with no alteration to wiring or piping

Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building Division before work starts.

Short on time to read all of this?

Get a free quote →

The statewide layers that apply everywhere

Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6); CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the California Wildland-Urban Interface Code (Title 24, Part 7, in force since 1 January 2026) and Cal Fire defensible-space requirements (Public Resources Code 4291) add a further layer. In the City of Clovis, the Building Division administers Title 24 with city amendments under the city’s buildings and construction code title, and valley heat makes the energy code a live part of review.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Who handles permitting in Clovis?

The Building Division regulates design, construction, materials, use, occupancy, accessibility, location and maintenance of all buildings within the City of Clovis.

Clovis permitting contact
DetailInformation
AuthorityCity of Clovis Building Division
ServesThe City of Clovis limits
Phone559-324-2390
Counter1033 Fifth Street, Clovis
CodeTitle 24 with Clovis city amendments
InspectionsRequested at least a day ahead
LicensingState CSLB license; a city business licence or tax registration may also apply
RecordsThe division holds city permit records

The Building Division runs plan check, permit issuance and inspection for the City of Clovis from the counter on Fifth Street, with Planning in the same department. Residential submittals are lighter than commercial ones, where drawings, plans and calculations must be wet signed and stamped by a California-licensed architect or engineer. Inspection requests are made at least a day in advance so field staff can be scheduled.

Confirm the parcel is inside the city first; unincorporated Fresno County and the City of Fresno file with different authorities under their own amendments.

In 2025, building permits issued in Clovis authorized 588 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Not sure this scope needs a permit?

Get a free quote →

Permit types

Residential permits

Residential work inside the city is permitted and inspected by the division under Title 24 and city amendments. Additions, remodels, reroofs, retaining walls, water heaters, air conditioning, pools, solar and EV chargers need permits, and garage conversions carry covered-parking and setback requirements. A CSLB-licensed contractor in the right classification pulls the trade permits.

Commercial permits

Commercial and multi-family work goes through division plan check against the California Building Code, the Energy Code and CALGreen, with city amendments. New commercial construction requires drawings, plans and calculations wet signed and stamped by a California-licensed architect or engineer, and multiple plan sets are required at submittal.

Licenses, trade classifications and design professionals

Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building Division requires for the specific building before filing.

Contractors are licensed statewide by the Contractors State License Board (Classes A, B, B-2 and C) for work of $1,000 or more or any permitted work; a city may also require a business licence or tax registration. Contractor licensing in California

Clovis permit costs and fees

Budget the city building permit and plan-check fees, separate trade permits, the state Building Standards and seismic surcharges, and the development impact fees that apply in the growth areas. Fees are valuation-based and set by the city; confirm the schedule in force on your filing date.

How Clovis permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local schedule
Plan checkA percentage of the permit fee or a flat charge, at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargesBuilding Standards and seismic (SMIP) fees collected with the permit
Impact and school feesDevelopment impact and school-district fees in growth areas
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

Rather talk it over?

Call 1-855-478-4290 →

California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges (Health and Safety Code 18931.6; Public Resources Code 2705). The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building Division for the schedule in force on your filing date.

🧮

Need a real number for a specific Clovis project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.

Trade permits and who may pull them

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

Each trade follows its part of Title 24 and is done by a contractor with the matching CSLB licence (C-10 electrical, C-36 plumbing, C-20 HVAC), a Class B contractor where allowed, or an owner-builder. Trade licences in California

Rather not deal with the building department?

Get a free quote →

How to apply for a Clovis building permit

1. Confirm the parcel is inside the city

Only work within the City of Clovis limits files with the division.

2. Register on the city self-service portal

Applications and status tracking run through the online portal.

3. Confirm the CSLB classification

California licenses contractors statewide; match the classification to the scope.

4. Confirm the plan set count and stamping

Commercial submittals need wet stamped drawings and multiple sets.

5. Submit plans and pay plan-check fees

File the plan set and pay the review fees the city posts.

6. Pull the permit and book inspections a day ahead

Inspection requests are scheduled in advance rather than same day.

Review, corrections and what actually causes delay

In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building Division before filing.

A building permit carries a validity period and can expire if work does not start or stalls between inspections; confirm the expiry with Clovis on phased or delayed work. Permit validity in California

Inspections in Clovis

Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. Inspection requests must be made in advance so the division can schedule field personnel; the division assigns the required stages when the permit issues.

California inspections are made against the code editions in effect when the permit application was submitted (Health and Safety Code 18938.5), so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building Division needs and schedule around its inspection windows.

Want this handled start to finish?

Get a free quote →

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.

Clovis permit search and official resources

Permit records in California sit with the local authority that issued them. Where the City of Clovis Building Division is the authority for the City of Clovis limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.

🔍

Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Who issues building permits in the City of Clovis?

The Building Division, within Planning and Development Services, issues permits for work inside the city. Unincorporated Fresno County and the City of Fresno are separate authorities.

Inspections are where schedules slip.

Get a free quote →

What does a commercial submittal need?

Drawings, plans and calculations wet signed and stamped by a California-licensed architect or engineer, with multiple plan sets required at submittal.

Do I need a local contractor registration?

Not a contractor licence: California licenses contractors statewide through the CSLB, and the licence must be active and carry the classification that matches the work. A city may still require a business licence or business tax registration (Government Code 37101), so ask the department.

How far ahead do I book inspections?

Requests are made at least a day in advance so that field personnel can be scheduled for the following working day.

Are impact fees a factor?

In the master-planned growth areas, development impact fees are a material part of the total cost. Confirm what applies to the parcel before you price the job.

How do I run a Clovis permit search?

The division holds the city’s permit and inspection records and publishes issued-permit statistics; confirm past work was permitted before buying, refinancing or renovating.

Simplify Clovis permitting with Alliance Permitting

Clovis rewards a submittal that arrives with the right number of correctly stamped sets and a clear read on impact fees. Both are easy to get wrong from outside the valley.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Clovis because the work is done by people who have stood at the counter:

  • We confirm the parcel is inside the city rather than Fresno or the county.
  • We confirm the plan set count and stamping before submittal.
  • We confirm the CSLB classification matches the scope of work.
  • We identify the impact fees that apply in the growth areas.
  • We track plan check, issuance and the inspection sequence through final.

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Clovis sooner?

Let Alliance prepare, file, and track your Clovis permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Clovis permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.