Inside the City of Marina, building, electrical, plumbing and mechanical permits come from the Building Division of the Community Development Department, 209 Cypress Avenue (inspection line 831-884-1241), where Bill Moritz is the Chief Building Official. All building permits are filed in the city’s Citizenserve portal. Under the fiscal 2026-27 fee schedule (Resolution 2026-44, effective July 1, 2026), a $200,000 project pays a $2,250 building permit fee and $1,462 in plan check before surcharges.
What requires a building permit in Marina?
Marina’s permit pages and fee schedule cover new buildings, additions and remodels, ADUs and junior ADUs, decks and guardrails, re-roofs (including overlays), window changeouts and exterior siding on houses, solar, EV chargers, pools and spas, electrical services and panels, temporary power, demolition and commercial mechanical work. The city publishes guides for bathroom remodels, kitchen remodels and decks.
Permit plus water and sewer clearance
- New construction
- ADUs and junior ADUs
- Bathroom remodels
- Kitchen remodels
Clearance not needed
- Projects that use no water or sewer, such as signs, storage sheds, retaining walls and patio covers
- These still need any building permit the work itself requires
The water and sewer clearance is signed by the Marina Coast Water District (water and sewer permits, 831-384-6131) and Monterey One Water (sewer connection fees, 831-372-2385), and no building permit can be issued without it. MCWD’s sewer permit or waiver comes first; Monterey One Water cannot issue its permit until then.
A roof overlay is allowed over only one existing layer, and the city requires a pre-roof inspection before the roof is covered. Removing and reinstalling rooftop solar or HVAC equipment can need its own permit and inspection.
What Marina decides and what the state holds
The city sets its fees each fiscal year by council resolution, runs its own residential property inspection program for home sales (Municipal Code chapter 15.40), and decides coastal development permits for projects in its coastal zone, design review and tree removal. The state licenses contractors and sets the building standards the Building Division enforces.
Marina building department: who handles permitting
The Building Division of Community Development reviews plans, issues building permits, inspects construction, prepares residential property inspection reports and handles code enforcement inside city limits. Planning Services, in the same department under Community Development Director Guido Persicone, handles zoning, design review, coastal permits and tree removal. Addresses outside the city fall under unincorporated Monterey County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, 209 Cypress Avenue, Marina, CA 93933 |
| Inspection line / email | 831-884-1241, inspections@cityofmarina.org |
| Community Development main line | 831-884-1220; planning@cityofmarina.org for planning questions |
| Counter hours | Monday to Friday, 8:30 a.m. to 4 p.m. for re-roof and over-the-counter permits; City Hall closes for lunch from noon to 1 p.m. |
| Chief Building Official | Bill Moritz, 831-884-1256 |
| Permit questions | 831-884-1214 |
| Online | Citizenserve portal: applications, payments, status and address permit history |
Marina permit types
Every building permit is submitted in Citizenserve, where applicants also pay fees and track progress. Most permits need a plot plan drawn to scale (parcel number, owner, lot and building dimensions, distances to lot lines, easements and drainage), a foundation plan, floor plan, exterior elevations and framing details. The forms page adds a revision form for changes to issued permits, a special inspection form, a subcontractor form, a release of liability for contractors and self-certification forms for smoke and carbon monoxide alarms and for plumbing fixtures.
Residential permits
- New houses show room sizes, doors and windows, heating and water heater locations with combustion air, garage fire separation, attic and underfloor access and heat-loss calculations; the plan list notes that fire sprinklers are required.
- ADUs and junior ADUs are filed as PDFs with stamped structural, energy and truss calculations, the engineer’s truss review letter, any soils report and a current grant deed. Deferred submittals are allowed only as the Chief Building Official permits. The city also offers a pre-approved ADU packet, with its own planning review fee.
- Re-roofs are usually issued electronically or over the counter, but not when the roof structure changes or skylights are added, which need a framing plan and calculations. The application asks for the roof area in squares, the slope and the existing material.
- Solar can use the city’s eligibility checklist for expedited plan check, and EV chargers have their own checklist.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the same portal and valuation tables, with non-residential rates for re-roofs ($290), electrical services ($332), solar ($504), pools ($975) and spas ($641), and $492 per commercial air handling unit or Type I or II hood. Commercial projects should also budget for the fire sprinkler and fire alarm plan checks priced in the Fire section of the same schedule.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning and design. Check the parcel with the city’s zoning lookup or the Zoning Counter; site and architectural design review costs $648 for a minor administrative review and $1,063 for a major one. A pre-application review is $685, credited toward later fees on the same project within six months.
- Coastal zone. Projects in the coastal zone need a local coastal development permit ($1,916, on top of the usual fees) or a coastal permit exemption ($279); appeals of coastal decisions are free.
- Water and sewer. MCWD and Monterey One Water sign the clearance before the permit issues.
- School fees. New or added residential and commercial square footage is reported on the Monterey Peninsula Unified School District form (Government Code 65995), and the district emails a certificate of compliance once its fee is paid.
- Air district. Demolition and renovation work follows the Monterey Bay Air Resources District asbestos packet on the forms page.
Marina permit costs and fees
The current schedule is the fiscal 2026-27 fee schedule adopted by City Council Resolution No. 2026-44, effective July 1, 2026 with a 2.5% increase. Building permit and plan check fees are separate valuation tables, valuations count labor and materials, and each permit also carries a $64 permit insurance charge.
| Item | Fee |
|---|---|
| Building permit, $25,001–$50,000 | $572 plus $14.84 per $1,000 over $25,000 |
| Building permit, $50,001–$100,000 | $943 plus $10.22 per $1,000 over $50,000 |
| Building permit, $100,001–$500,000 | $1,454 plus $7.96 per $1,000 over $100,000 |
| Building permit, $500,001–$1,000,000 | $4,638 plus $6.82 per $1,000 over $500,000 |
| Plan check, $100,001–$500,000 | $945 plus $5.17 per $1,000 over $100,000 |
| Training fee / technology surcharge / General Plan maintenance | 2% of the building permit fee / 4% of building permit fees / 15% of Building Division permit fees |
| Permit insurance | $64 |
| House re-roof, window changeout or siding | $240 each |
| Solar on a house up to 15 kW | $170, plus $15 per kW over 15; solar plan check $132 |
| House electrical service or panel | $363 |
| EV charging station | $332 |
| Pool / in-ground spa at a house | $707 / $504 |
| Miscellaneous building / electrical, plumbing or mechanical permit | $332 / $166 |
| Demolition permit | $200 |
| Re-inspection or unlisted inspection | $152 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the tables: a $200,000 project falls in the $100,001–$500,000 bands, so the building permit fee is $1,454 plus 100 × $7.96, or $2,250, and plan check is $945 plus 100 × $5.17, or $1,462. The training fee, technology surcharge, General Plan maintenance surcharge, $64 insurance, trade permits and outside agency fees are added on top. Schedule C-2 lists plan check for trade permits at 100% of the permit fee.
Other charges in the schedule: overtime inspections run at 120% of the regular hourly rate with a four-hour minimum, a temporary certificate of occupancy is $65, a zoning clearance letter $221, a property history letter $468, a tier 1 tree removal permit $589, a review of alternative materials $700, a minor variance $2,674 and a conditional use permit $5,631. Public Works charges $611 for a residential driveway approach inspection ($784 commercial), $611 for a sidewalk inspection and $263 for a temporary encroachment permit, and improvement or grading plan review is billed against a deposit of 2.75% of the engineer’s estimate for projects up to $500,000. The city also posts a model contract for deferring impact fees under SB 937.
Trade permits and who may pull them
The Building Division issues electrical, plumbing and mechanical permits through Citizenserve, often as combination permits: a pool at a house ($707) or an EV charger ($332) covers the trades in one permit. Backflow devices and expansion tanks are $140 each, and miscellaneous trade permits $166.
- City business license first. Contractors must hold a City of Marina business license before any permit is issued; licenses are handled through the city’s HdL online portal, with questions to HdL at 831-233-6558.
- Contractor proof. For a re-roof the city asks the contractor to show a C-39 roofing license, workers’ compensation insurance and the Marina business license, and the contractor takes out the permit.
- Owner-builders. An owner who pulls the permit is responsible for code compliance and completes the owner-builder acknowledgment before issue; the city’s owner-builder packet explains the owner-as-worker, owner-as-contractor and owner-as-employer choices.
Rather not deal with the building department?
Get a free quote →How to apply for a Marina building permit
Use the zoning lookup or call Planning at 831-884-1220 for design review, coastal or tree permits.
For new buildings, ADUs and kitchen or bath remodels, have MCWD and Monterey One Water sign the clearance form.
Follow the submittal list for the project: plot, foundation, floor, elevation and framing sheets, or the ADU and re-roof handouts.
Create an account, upload PDFs and the application, and pay the plan check fee.
Upload corrections through the portal; changes after issue use the building revision form.
Bring the school district certificate and the contractor’s Marina business license, pay the permit fees and receive the permit.
Review, corrections and what causes delay
For ADUs the city asks applicants to allow at least 10 to 15 business days for the first plan review and the same for each resubmittal. Missing items that hold permits back include the water and sewer clearance, stamped calculations and the truss engineer’s letter, the school fee certificate and the contractor’s city business license. Additional plan review is charged at the hourly rate.
Inspections in Marina
Inspections are Monday through Friday by appointment only, booked at least 24 hours ahead for a morning (8 a.m. to noon) or afternoon (1 to 4 p.m.) window rather than a set time. Book in Citizenserve if the permit was filed online, by email to inspections@cityofmarina.org or on the inspection line at 831-884-1241. Approved plans and the permit must be on site, or no inspection will be approved.
- The residential sequence runs from foundation forms (do not pour until the forms are signed off), underfloor and underfloor insulation, roof sheathing and shear walls, framing and top-out, wall and ceiling insulation and lath or drywall to stucco and the final.
- Calling before the work is ready, or failing to cancel, can bring the $152 re-inspection fee.
- Utilities are released only after every department has signed off at final; the city posts the minimum requirements for a single-family final inspection.
Separately, an owner selling a home in Marina must order a residential property inspection report from the city before close of escrow and give it to the buyer. The report, ordered in Citizenserve, lists the zoning, the occupancy shown by permits of record, recorded code violations and whether the building appears substandard; it costs $200, plus $100 for each inspection after the second. New homes sold within six months of final inspection, and first sales in subdivisions recorded within two years, are exempt.
California building code in Marina
Marina links its municipal code through Code Publishing; the residential property inspection rules are in chapter 15.40. ADU plans must state the flood zone and fire sprinkler status on the cover sheet. FEMA’s Community Status Book lists Marina (community 060727) as participating in the National Flood Insurance Program, with a current flood map dated June 21, 2017.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Marina building permit FAQs
Who issues building permits in Marina?
The city’s Building Division at 209 Cypress Avenue, part of Community Development, for property inside city limits.
Can I apply in person?
Building permits are submitted online in Citizenserve; simple re-roof permits can also be issued over the counter on weekdays from 8:30 a.m. to 4 p.m.
How much is a building permit in Marina?
A $200,000 project pays $2,250 for the building permit and $1,462 for plan check under the FY 2026-27 schedule, plus percentage surcharges and $64 permit insurance.
Why do I need a water and sewer clearance?
New buildings, ADUs and kitchen or bathroom remodels cannot get a permit until Marina Coast Water District and Monterey One Water sign the clearance form.
How do I book an inspection?
At least 24 hours ahead in Citizenserve, by email or at 831-884-1241; you get a morning or afternoon window.
Do I need anything from the city to sell my house?
Yes. A residential property inspection report must be ordered before close of escrow and given to the buyer.
Do contractors need a Marina business license?
Yes, before the permit is issued, through the city’s HdL business license portal.
Marina permit search and official resources
With a free Citizenserve account you can view the permit history of any address in the city and follow the status of current projects. A formal property history letter from Community Development costs $468.
Inspections are where schedules slip.
Get a free quote →- Marina Building Services
- Citizenserve online permit portal
- Building permits: application requirements
- Sewer and water clearance form
- Fee schedules
- FY 2026-27 fee schedule (Resolution 2026-44)
- Building forms
- ADU and JADU submittal requirements
- Re-roofing requirements
- Owner-builder packet
- Monterey Peninsula Unified School District fee form
- Inspections
- Typical inspection sequence, residential
- Residential property inspection reports
- Planning Services
- California Building Standards Code (Title 24)
- FEMA Community Status Book, California
Simplify Marina permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Marina sooner?
Let Alliance prepare, file, and track your Marina permits while your crew stays on the job.
More California permitting guides
Monterey County
Read guide →Monterey
Read guide →Pacific Grove
Read guide →Mariposa County Building Permit Guide
Read guide →Martinez Building Permit Guide
Read guide →Marysville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Marina permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.