Skip to main content
Municipal GuideCaliforniaMartinez · Contra Costa County

Martinez, California Building Permit Guide

To get a building permit in Martinez, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Martinez Building Division at City Hall, 525 Henrietta Street, issues building and trade permits, and since September 1, 2026 takes new applications only through its online Accela portal.

Authority: City of Martinez Building DivisionFiling: Online Portal (Accela); SolarAPP+ for solarPhone: (925) 372-3515
Authority
City Building DivisionCity Hall, 525 Henrietta Street
Apply
Online Portal onlyPaper and e-mailed applications refused
Plan review
38% of permit feeTitle 24 energy check adds 25% of that
Inspections
(925) 372-3596Request by 4 p.m. the business day before

Inside Martinez city limits, building, electrical, plumbing and mechanical permits come from the City’s Building Division, which runs the Permit Center at City Hall, 525 Henrietta Street ((925) 372-3515); Mike Leontiades is the Chief Building Official. Since September 1, 2026 every new application, residential, commercial or industrial, goes through the City’s online Accela portal, and solar goes through SolarAPP+. Fees follow the User Fee Schedule of Resolution No. 25-036: from July 1, 2026 a $75 technology fee applies to each permit, and plan review is 38% of the building permit fee.

What requires a building permit in Martinez?

Martinez treats new buildings, additions, remodels, demolition and trade work as permit work, and its fee schedule shows how far that reaches: separate line items exist for re-roofs, decks, patio covers and enclosed patios, carports, retaining and crib walls, pile foundations, stucco, fireplaces, signs, satellite dishes, pools and spas, and the common furnace, air conditioner, water heater, gas line, sewer and electrical circuit job. The Building Division’s handouts cover bathroom and kitchen remodels, EV chargers, heat pumps and heat pump water heaters, furnace and air conditioner change-outs, tankless water heaters, battery storage, solar and pool or spa demolition.

Permit needed

  • Fences and freestanding walls 7 feet tall or more (fee bands start at 7 to 10 feet)
  • Retaining walls, gravity and crib walls
  • Decks, patio covers and patio enclosures
  • Re-roofs, including overlays and tear-offs
  • Pools, spas and pool demolition
  • Water heaters, furnaces, air conditioners and duct work

No building permit

  • Fences less than 7 feet tall, which the fee schedule states need no building permit
  • Other exemptions follow the California codes; the Building Division answers scope questions at (925) 372-3515

Work in a mapped flood zone gets a separate check. Converting an existing garage into a junior ADU does not by itself trigger flood upgrades; they apply only when the project is a substantial improvement, meaning its cost reaches 50% of the structure’s market value. For a detached garage only the garage’s value counts, but for an attached garage the whole house is valued. The City reviews flood status and costs case by case and publishes a Substantial Damage Estimator worksheet and standard operating procedure for flood-damaged buildings.

What Martinez decides and what the state holds

Martinez sets its own permit fees, discounts and impact fees by Council resolution, runs its own zoning ordinance through the Planning Division, issues engineering permits for grading, encroachments and street trees, and enforces its construction and demolition debris ordinance (Section 8.19.090). Contractor licenses come from the state, and fire code questions belong to the Contra Costa County Fire Protection District, whose 2024 weed abatement standards the City posts with its forms.

Short on time to read all of this?

Get a free quote →

Martinez building department: who handles permitting

The City’s Building Department issues permits to homeowners and licensed contractors for construction inside city limits and works alongside the Planning and Engineering Divisions in the same building. The Building Division handles permitting, plan review, inspection and building code enforcement. Contra Costa County’s building office at 30 Muir Road is also in Martinez, but it permits only unincorporated land and the cities that contract with it; parcels inside Martinez go to City Hall.

Martinez permit contacts
OfficeDetails
Permit Center (Building Division)City Hall, 525 Henrietta Street, Martinez, CA 94553; (925) 372-3515; buildingpermits@cityofmartinez.org for general questions only
Permit Center hoursMonday–Friday, 8 to 11:30 a.m. and 1 to 4 p.m. (closed for lunch)
Chief Building OfficialMike Leontiades, (925) 372-3565
Plan checker line(925) 372-3529
Inspection request recorder(925) 372-3596
Planning(925) 372-3515; dutyplanner@cityofmartinez.org
Engineering(925) 372-3516; engineering@cityofmartinez.org
Code Enforcement(925) 372-3598; codeenforcement@cityofmartinez.org
Business license support (HdL)(925) 273-7439

Martinez permit types

Building, mechanical, plumbing and electrical permits are all issued by the Building Division, and engineering permits (encroachment, grading, site development, transportation and street tree replacement) by the Engineering Division. Solar systems use SolarAPP+ only. The forms page also carries agent authorization forms for contractors and for property owners, an owner’s acknowledgement and verification form, a revision submittal form for changes to approved plans, a duplicate plans request, an alternative methods and materials request and a construction valuation cost policy that sets how job values are figured.

Residential permits

  • New homes and additions. The “NSFD or Addition” submittal checklist and the 1 & 2 family dwelling requirements list what plans must show; structural design criteria are posted separately.
  • ADUs and JADUs. An ADU/JADU submittal checklist applies. ADUs and JADUs under 750 square feet pay no city impact mitigation fees; larger ADUs pay fees in proportion to the main home’s size. The schedule also lists an hourly ADU prototype plan fee.
  • Legalizing an existing unit. A Certificate of Health and Safety Compliance (dwelling unit amnesty) costs $780, plus $120 for inspections beyond the first and final ones and $200 for a re-review when plans need major changes.
  • Remodels and equipment. Kitchen and bathroom remodel handouts, an electrical load calculation sheet, a smoke and carbon monoxide alarm declaration and handouts for heat pumps, water heaters and furnaces.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Tenant improvements follow the City’s tenant improvement submittal list, and commercial or industrial re-roofs, grease traps, Type I and Type II hoods, walk-in coolers, boilers and three-phase services each have their own fee lines. Where the code calls for special inspection, the City posts a special inspection form and its list of recognized special inspection agencies. Multifamily and condominium owners must also report balcony and walkway hazards under SB 326: buildings permitted before January 1, 2020 were due for a first inspection by January 1, 2025 and every 9 years after, and newer buildings within 6 years of the certificate of occupancy.

What comes before the building permit

  • Zoning and design review: the Planning Division applies the zoning ordinance; administrative design review is $715 and a tree permit $240 from July 1, 2026.
  • Engineering: grading, site development and encroachment permits for work in the street, filed in person, by email or through the City’s Hightail upload, with encroachment plan review billed at $250 an hour.
  • Fire district: fire code review by the Contra Costa County Fire Protection District where the project needs it; the Outside Agency Contact List names the other agencies.
  • Construction waste: covered projects must register in the City’s Green Halo waste tracking system and post a diversion security deposit.
  • Flood zone: a substantial improvement review for work on structures in a special flood hazard area.

Martinez permit costs and fees

Martinez prints its building fees in the City of Martinez User Fee Schedule, last revised June 30, 2025 under City Council Resolution No. 25-036. It carries three columns, for fees effective July 1, 2024, July 1, 2025 and July 1, 2026; the figures below are the July 1, 2026 column. Building permit fees rise with job valuation, plan review is charged on top at 38% of the building permit fee, and a Title 24 energy plan check adds another 25% of the plan review fee.

Rather talk it over?

Call 1-855-478-4290 →
Martinez building permit fee by valuation (from July 1, 2026)
Job valuationBase feePlus, per $1,000
$1 to $1,500$117–
$1,501 to $2,000$148–
$2,001 to $25,000$224$45.61
$25,001 to $50,000$1,272$32.91
$50,001 to $100,000$2,098$22.91
$100,001 to $500,000$3,237$18.26
$500,001 to $1,000,000$10,538$15.46
$1,000,001 or more$18,274$10.24
Other Martinez building fees (from July 1, 2026)
ItemFee (from July 1, 2026)
Technology fee$75 per permit or project application
Demolition / deck / sign$277 each
Fence or freestanding wall, non-masonry, 7 to 10 feet$530 for the first 100 linear feet, plus $137 per added 100
Standard retaining wall$360 for the first 50 linear feet, plus $85 per added 50
Wood patio cover up to 300 sq ft / enclosed$422 / $633
Masonry fireplace / prefabricated fireplace$530 / $360
Residential air conditioner / furnace$278 / $279
Water heater (first) / water pipe repair or replacement$172 / $192
Additional plan review / revisions to a permit$243 an hour / $195 an hour
Re-inspection / after-hours inspection$186 an hour / $369 (2-hour minimum)
Records management$2 a page

Several discounts apply to the building permit fee: 50% off for converting a wood-burning furnace or fireplace to gas, for switching appliances from gas to electric and for EV charging stations. Solar photovoltaic electrical permits and solar water heating plumbing permits are also half price, except solar required for new homes, and a greywater system permit is a flat $35; those solar and greywater rates end June 30, 2027. A small state fee for the California Building Standards Commission is added to building permits, $1 for each $25,000 of valuation.

Rather not deal with the building department?

Get a free quote →

New housing also pays impact mitigation fees, effective July 1, 2025: $14,041 per single-family home ($2,221 transportation, $2,509 parks and recreation, $5,095 park in-lieu, $3,373 cultural facilities, $411 police and $432 childcare) and $10,048 per multifamily unit, with per-square-foot rates for retail, office and industrial space. Drainage fees set by County ordinance apply in the listed drainage areas.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits are Building Division permits with flat per-item fees: a residential air conditioner is $278, duct work alone $167, a residential range hood and duct $173, a backflow preventer or new water service $259 and a drain and vent repair $218 from July 1, 2026. Stand-alone trade jobs that need plans are checked at an hourly plan review rate. Permits go to the property owner or to a contractor holding the right state license; the Permit Center links a separate notice that contractors working in Martinez need a City business license, which the City has outsourced to HdL (support line (925) 273-7439).

A contractor or owner who wants someone else to file can use the City’s authorization forms to act as agent for a contractor or for a property owner. The same forms page holds an owner’s acknowledgement and verification of information form and a smoke and carbon monoxide alarm declaration.

How to apply for a building permit in Martinez

1. Check zoning and other agencies

Ask the duty planner about setbacks and design review, and use the Outside Agency Contact List for fire, sanitary and utility approvals.

2. Prepare plans and forms

Use the matching checklist (new home or addition, ADU/JADU, tenant improvement or solar), the Building Permit Application and a valuation figured under the City’s cost policy.

3. Register in the Online Portal

Create an account in the City’s Accela portal; solar goes to SolarAPP+ instead. Permit Center staff at (925) 372-3515 help with the portal.

4. Upload the application and plans

Since September 1, 2026, paper applications and paper plan sets are refused unless the Chief Building Official grants an exception for exceptional circumstances, and applications sent to the Building Division email address are not processed.

5. Answer plan review and pay

Respond to corrections and revisions in the portal, register the project in Green Halo if it is covered, and pay the permit, plan review and technology fees.

6. Book inspections

Call the inspection request recorder at (925) 372-3596 by 4 p.m. the business day before.

Want this handled start to finish?

Get a free quote →

Review, corrections and what causes delay

Applicants upload revised drawings and track the status of an application in the portal instead of visiting City Hall. Additional plan review is billed at $243 an hour, and changes after approval need a revision submittal at $195 an hour. Covered projects must file diversion receipts in Green Halo within 30 days after construction ends, or the whole diversion security deposit is forfeited.

Inspections in Martinez

Inspections are booked by phone through the Building Inspection Request Recorder at (925) 372-3596. Leave the message no later than 4 p.m. on the business day before you want the visit, and give your name and the job address, a phone number, the permit number, the type of inspection and whether you prefer morning or afternoon. The City tries to meet the preference but does not guarantee it.

Inspections are covered by the permit fee, while added visits are billed: construction re-inspections at $186 an hour, a pre-work or site inspection at $180 an hour and after-hours inspections at $369 with a two-hour minimum. Unlisted building services are billed at $195 an hour with a two-hour minimum.

California building code in Martinez

The Permit Center notes that construction projects needing a building permit have had to meet the 2025 California Building Standards Codes since January 1, 2026. FEMA’s Community Status Book lists the City of Martinez (community 065044) as participating in the National Flood Insurance Program, with flood maps effective March 21, 2017.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Martinez permit search and official resources

Permit applicants track the status of their applications in the City’s Online Portal. For copies of old plans, the forms page has a duplicate plans request, and general questions go to buildingpermits@cityofmartinez.org.

Inspections are where schedules slip.

Get a free quote →

Martinez building permit FAQs

Who issues building permits in Martinez?

The City’s Building Division at City Hall, 525 Henrietta Street, for all work inside city limits; the County’s building office does not permit Martinez parcels.

Can I email or mail a permit application?

No. Since September 1, 2026 new applications go only through the Online Portal, or SolarAPP+ for solar, unless the Chief Building Official grants an exception.

How much is plan review?

38% of the building permit fee, plus 25% of that amount when Title 24 energy calculations are checked.

Do I need a permit for a fence?

Not for a fence under 7 feet tall. A non-masonry fence of 7 to 10 feet costs $530 for the first 100 linear feet from July 1, 2026.

How do I schedule an inspection?

Call (925) 372-3596 by 4 p.m. the business day before, with the permit number and inspection type.

Do ADUs pay impact fees?

Not if the ADU or JADU is under 750 square feet; larger ADUs pay a share in proportion to the main home.

Are solar permits discounted?

Yes, solar electrical and solar water heating permits are half price until June 30, 2027, except solar required for new homes.

Does a contractor need a Martinez business license?

Yes. The Permit Center lists a business license as required for contractors; HdL runs it for the City at (925) 273-7439.

Simplify Martinez permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Martinez sooner?

Let Alliance prepare, file, and track your Martinez permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Martinez permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.