Inside McFarland’s city limits, building permits come from the city’s Building Division, part of the Community Development Department at City Hall, 401 W. Kern Avenue (661-792-3091). Applications, plans and payments go through the city’s GovWell portal. Under Resolution 2024-76, in force since September 1, 2024, a residential water heater or HVAC change-out costs $166 and a reroof up to 2,000 square feet costs $368, while larger jobs are priced on a valuation table plus a plan review fee of 75% of the permit fee.
What requires a building permit in McFarland?
The city’s building permit application and its fee schedule show the range of work McFarland permits. The application form lists new houses and master-plan homes, residential remodels and alterations, patios and porches, carports, swimming pools, reroofs, demolition, house moving, sewer connections, temporary gas, code compliance work and separate electrical, plumbing and mechanical permits. The fee schedule adds flat-priced items such as service panel upgrades, sewer, water or gas line repairs, block walls, window and sliding door replacements, solar systems under 10 kW and temporary power poles.
Common home projects
- Water heater and HVAC change-outs
- Reroofing, priced by roof area
- Patio covers, standard or with electrical and stucco upgrades
- Block walls, priced by length
- New or altered windows and sliding doors
- Pools, spas and pool equipment change-outs
- Room additions and remodels, structural or not
Larger and commercial work
- New houses and other new buildings
- Commercial tenant improvements, structural or not
- Accessory dwelling units, with an administrative permit first
- Demolition and house moving
- Signs, which also need planning sign review
- Any work in a city street, alley or sidewalk (encroachment permit)
The city’s pages do not publish a list of work that is exempt from a permit. Work found without a permit is charged an investigation fee of twice the permit fee, so ask the Building Division before starting anything not listed above.
What McFarland decides and what the state holds
McFarland sets its own permit fees by council resolution, runs its zoning code (Title 17) and planning approvals, and licenses every business that works in the city, including contractors based elsewhere. The building standards themselves are the state’s Title 24 codes, enforced by the Building Division. Fire-code plan review and enforcement come from the Kern County Fire Department, which serves McFarland as a contract city. Contractor licenses are issued by the state, not the city.
McFarland building department: who handles permitting
The Building Division is one of four divisions in McFarland’s Community Development Department, along with Planning, Grants and Communication and Marketing. It reviews plans, issues permits, inspects work and works with the Kern County Fire Department and county environmental health on safety issues. The city’s master application package sends plans to outside consultants named on its contact list, including Interwest Consulting Group for building and safety review and separate civil, water and wastewater engineering firms. Fees those firms charge are paid directly to them before the permit is issued. Land outside the city limits is unincorporated Kern County; see the Kern County building permit guide for that area.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Building Division | City Hall, 401 W. Kern Avenue, McFarland, CA 93250; phone 661-792-3091, fax 661-792-3093 |
| Online permits | GovWell portal: apply, upload plans, pay fees, request inspections and track status |
| Planning Division | Zoning, floodplain questions, planning applications; 661-792-3091 (have the address or parcel number ready) |
| Business licenses | City Clerk, 661-792-3091; applications and renewals in GovWell |
| Fire plan review | Kern County Fire Department, Office of the Fire Marshal, 2820 M Street, Bakersfield |
McFarland permit types
Most permits start in GovWell: you create an account, pick the permit type, upload the documents it asks for and pay online. The city’s paper building permit application is still posted and shows what the city needs to know: the parcel number, valuation and square footage, the contractor’s state license number and expiry date, and whether the owner or an agent is applying. A plan check deposit must be paid before an application is processed.
Residential permits
- Simple replacements such as water heaters, HVAC units, service panels and sewer or gas line repairs carry one flat fee that already includes issuance, inspection and in-house plan check.
- Remodels and additions are priced by floor area on the flat schedule, split into structural and non-structural work.
- New houses are valued from the International Code Council’s building valuation data and priced on the valuation table. Master-plan homes in a tract must use a site plan exactly matching the approved set, or the job goes through regular plan check at the standard fee.
- Accessory dwelling units need a planning administrative permit and a building permit. The city accepts Kern County’s pre-approved detached ADU plans, though some site-specific design work is still needed.
- Owner-builders receive a property owners packet; the city will not issue the permit until the owner has initialed, signed and returned the owner-builder verification form.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial tenant improvements are priced by area, with lower rates per 250 square feet above 5,000 square feet. New commercial buildings use the valuation table. Commercial HVAC change-outs are $221 per unit and commercial panel upgrades $221. Signs need planning sign review, and new development goes through site plan review, which the checklist says involves Public Works, the City Engineer, the fire department for large developments and Caltrans for sites within 1,000 feet of a freeway interchange.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning clearance. The Planning Division signs off on zoning for most building permits: $85 for residential alterations and additions, $170 for a new single-family house, $340 for new non-residential buildings.
- Planning applications. Conditional use permits, variances, site plan and design review, maps and zone changes use the Master Uniform Application, which needs a preliminary title report no more than two months old and a detailed project description. Staff say to expect an update about 10 business days after you submit.
- Planning Commission. The five-member commission hears conditional use permits, subdivision maps and some design review on the first Wednesday of each month at 6:00 p.m. at the Veterans Hall council chambers, 103 W. Sherwood Avenue.
- Outside approvals. The master package lists the McFarland Unified School District and the San Joaquin Valley Air Pollution Control District among the agencies a project may need, and proof of payment of development impact, school district and park impact fees is required at issuance.
- Encroachment permit. Driveway approaches, curb, gutter, sidewalk, utility connections and other work in the public right-of-way need an engineering (encroachment) permit with an Underground Service Alert number (1-800-227-2600).
McFarland building permit fees
Building and planning fees come from Resolution 2024-76, approved by the City Council on June 27, 2024 and effective September 1, 2024; encroachment and land development fees come from Resolution 2020-0027 (effective July 1, 2020). The flat fees in the schedule’s Section A include issuance, inspection and in-house plan check. Technology, training and state fees are charged on top, and third-party plan review is passed through at cost.
| Work | Fee |
|---|---|
| Water heater, residential HVAC change-out or residential panel upgrade | $166 each |
| Residential solar under 10 kW | $332 |
| Residential reroof up to 2,000 sq ft | $368, plus $74 per extra 1,000 sq ft |
| Block wall, first 100 linear feet | $221, plus $74 per extra 50 feet |
| Standard patio cover up to 200 sq ft / over 200 sq ft | $258 / $332 |
| Swimming pool or spa | $516 |
| Residential addition up to 500 sq ft | $737, plus $61 per extra 100 sq ft |
| Structural residential remodel up to 500 sq ft | $589, plus $61 per extra 100 sq ft |
| Demolition | $221 |
| Valuation-based permit, $100,001 to $500,000 | $1,473.60 for the first $100,000 plus $9.58 per extra $1,000 |
| Plan review (valuation-based permits) | 75% of the building permit fee, up to three in-house checks |
| Electrical, plumbing or mechanical with a building permit | 12% of the base permit fee each |
| Permit issuance (valuation-based permits) | $74 |
| Technology fee / training fee | 6% / 5% of the permit fee |
| Certificate of occupancy / temporary, per 30 days | $111 / $221 |
| Reinspection (third visit on) or missed inspection | $74 |
Rather talk it over?
Call 1-855-478-4290 →Valuation for new buildings comes from the International Code Council’s building valuation data; remodels, additions and tenant improvements use 50% of that table, and the Building Official sets the final figure. New construction and additions also pay a 6% general plan maintenance fee. Under the valuation table, a new house valued at $200,000 has a base permit fee of $2,431.60 ($1,473.60 plus 100 × $9.58) and a plan review fee of $1,823.70, before trade, issuance and state fees. On planning, an ADU design review takes a $1,700 deposit (minimum fee $1,300), a variance $2,040 (minimum $1,500) and a home occupation permit $125. Encroachment permits start at $58, with $115 for a minor inspection and $460 for a major one.
Trade permits and who may pull them in McFarland
Electrical, plumbing and mechanical work is permitted by the Building Division. When the trade work is part of a building permit, each trade adds 12% of the base permit fee. A stand-alone trade permit uses its own valuation table: $73.68 up to $2,000, $147.36 from $2,001 to $4,000, then $24.56 per $1,000 to $10,000 and $9.83 per $1,000 after that. Common swaps, such as a water heater, a residential HVAC unit or a panel upgrade, are simpler at a flat $166.
The application asks for the contractor’s California license number and expiry date. Before any permit is issued, the contractor must hold a valid City of McFarland business license and have general and auto liability and workers’ compensation certificates on file with the city. The business license applies to every business working in the city, including contractors whose offices are outside McFarland, and runs for the fiscal year. Owners doing their own work apply as owner-builders and must complete the city’s owner-builder acknowledgment before the permit is issued; an agent may sign for the owner only with the city’s prior approval on the authorization of agent form.
Rather not deal with the building department?
Get a free quote →How to apply for a McFarland building permit
Call the Planning Division at 661-792-3091 with the address or parcel number to confirm zoning and whether the lot is in a flood zone.
Projects needing a use permit, design review, an ADU administrative permit or a map file the Master Uniform Application with its fees and a recent title report.
Use the city’s site plan checklist: existing and proposed buildings, setbacks, driveways, parking, utilities, fencing, landscaping, a north arrow and scale.
Create an account, choose the permit type, upload plans and documents, and pay the plan check deposit.
Answer plan check comments from the city’s reviewers and the Kern County Fire Department, and pay any consultant invoices directly.
Pay permit, trade and any impact or school fees, and confirm the contractor’s business license and insurance are on file.
Review, corrections and what causes delay
The plan review fee includes up to three in-house plan checks, and the schedule bills excess plan review at $147 an hour. The city’s forms name what holds a permit back: incomplete forms cannot be processed, consultant plan review fees must be paid before issuance, proof of impact, school district and park fee payment is required at issuance, and the contractor’s business license and insurance must be on file. Projects that also need a planning approval wait for it first, and an ADU administrative permit must be decided within 60 days of a complete application under the city’s ADU ordinance.
Inspections in McFarland
Inspections are requested through the GovWell portal, where the permit’s status and results are also tracked. Keep the approved plans and permit card on site. The fee schedule sets the costs that come with inspections: a reinspection from the third visit onward or a missed inspection is $74, a phased inspection is $74 each, and after-hours inspections are $177 an hour with a two-hour minimum. Fire sprinklers, fire alarms and other fire-code items fall to the Kern County Fire Department, which enforces the fire code in the city. When the work passes final inspection, new buildings receive a certificate of occupancy ($111); a temporary certificate costs $221 for each 30 days.
California building code in McFarland
McFarland enforces the state’s Title 24 codes through its Building Division, with fire-code enforcement by the Kern County Fire Department. Its zoning rules, including the ADU rules in section 17.136.150 as amended by Ordinance No. 1-2024, sit in Title 17 of the municipal code. FEMA’s Community Status Book lists McFarland (community 060080) as participating in the National Flood Insurance Program, with flood maps effective September 26, 2008.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
McFarland building permit FAQs
Who issues building permits in McFarland?
The city’s Building Division at 401 W. Kern Avenue, for property inside the city limits; unincorporated land nearby is handled by Kern County.
How much does a water heater permit cost in McFarland?
$166 under Resolution 2024-76, the same as a residential HVAC change-out or panel upgrade; the flat fee includes issuance and inspection.
Can I apply online?
Yes. McFarland takes applications, documents and payments in its GovWell portal, which also handles inspection requests and status checks.
Does my contractor need a McFarland business license?
Yes. The application says the contractor must hold a valid city business license and have liability and workers’ compensation certificates on file before any permit is issued.
How do I get an ADU approved?
File an administrative permit with the Master Uniform Application and a building permit application; the city may use Kern County’s pre-approved detached ADU plans.
Who reviews fire sprinklers and fire access?
The Kern County Fire Department, which serves McFarland as a contract city and does fire-code plan review and enforcement.
Do I need a permit to work on the sidewalk or driveway approach?
Yes. Work in a city street or sidewalk needs an encroachment permit with an Underground Service Alert number; a non-blanket permit fee is $58.
McFarland permit search and official resources
Your own permits, inspection results and fees are visible in your GovWell account. For older permit files or plans, file a request through the city’s public records portal; the City Clerk (661-792-3091, ext. 2135) answers within 10 days whether the records can be provided, and copies cost 35 cents a page plus staff time.
Inspections are where schedules slip.
Get a free quote →- McFarland Building Division
- GovWell permit portal
- Schedule of user and regulatory fees (Resolution 2024-76)
- Building permit application
- Master Uniform Application package
- Site plan checklist
- Planning Division and FAQs
- Planning applications and fees
- Accessory dwelling units
- ADU Ordinance No. 1-2024
- Encroachment permits
- Engineering (encroachment) permit application
- Business licenses
- Planning Commission
- Public records requests
- Kern County Fire Department fire prevention
- Kern County Fire Hazard Severity Zone maps
Simplify McFarland permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in McFarland sooner?
Let Alliance prepare, file, and track your McFarland permits while your crew stays on the job.
More California permitting guides
Kern County
Read guide →Ridgecrest
Read guide →Shafter
Read guide →Mendocino County Building Permit Guide
Read guide →Mendota Building Permit Guide
Read guide →Menifee Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about McFarland permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.