Building, electrical, plumbing and mechanical permits inside Shafter’s city limits come from the city’s Building Department at City Hall, 336 Pacific Avenue (661-746-5002), where Dennis Fidler is the Building Official. Small residential jobs can be emailed in and are processed in one to five business days; larger projects go in by counter or mail and take 15 to 20 business days of plan review. Under Resolution 3083, adopted June 2, 2026, a new building costs 1.32% of its adjusted valuation up to $500,000, a fee that already covers plan check and the trade permits.
What requires a building permit in Shafter?
Shafter requires a permit to construct, enlarge, alter, repair, move, improve, remove, convert or demolish a building or structure, and for any electrical, mechanical or plumbing work. The Building Department names the common cases: home and business additions and alterations, solar, patios, decks, garden and retaining walls, pools and spas, air conditioners, and all electrical and plumbing installations, including sprinklers, water heaters and gas lines.
Accepted by email
- EV charging stations
- Electrical service upgrades at an existing main panel
- Gas inserts
- HVAC repair, replacement or new installation
- Patio and pergola covers (two site plans)
- Residential reroofs
- Rooftop solar under the city’s SB 379 form
- Sewer, minor plumbing and fixture replacement
- Water heaters and window retrofits
Counter or mail submittal
- New houses and room additions
- Commercial buildings and tenant improvements (three sets of drawings)
- Projects that need Kern County Fire Department approval
- Any work beyond the email list above
Patio covers always need a permit, and the city publishes drawing requirements for room additions and patio covers. For work begun without a permit, the fee schedule adds a penalty equal to the fees that would have applied, so the owner pays twice the original fees.
What Shafter decides and what the state holds
The Building Department enforces minimum building standards throughout the incorporated city, and Shafter sets its own permit fees, zoning and subdivision rules, special inspector registration and encroachment rules. Fire-code review and enforcement come from the Kern County Fire Department, which serves Shafter as a contract city. Contractor licensing is a state matter, and the city’s portal links to the Contractors State License Board for license checks.
Shafter building department: who handles permitting
The Building Department issues building permits and performs building inspections for property in the incorporated city. Dennis Fidler is the Building Official (the commercial submittal guidance calls the post Chief Building Official) and is the contact, with the inspection manager, for early questions on commercial or industrial projects of 50,000 square feet or more. Planning, zoning and subdivisions sit with the Planning Department under Planning Director Steve Esselman, and work in the street with Public Works Engineering. Land outside the city is unincorporated Kern County; see the Kern County building permit guide.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Building Department | City Hall, 336 Pacific Avenue, Shafter, CA 93263; 661-746-5002; buildinginspection@shafterca.gov; Monday to Friday, 8 a.m. to 5 p.m. |
| Planning Department | City Hall; 661-746-5002; Monday to Friday, 8 a.m. to noon and 1 to 5 p.m. |
| Public Works / Engineering | Encroachment permits; 661-746-5004 |
| Online portal | SmartGov public portal: applications, documents, inspection scheduling, results and parcel search |
| Fire review | Kern County Fire Department (contract city) |
Shafter permit types
Every building permit starts with the city’s Project Identification Worksheet, sent with plans and supporting documents. Projects that need Kern County Fire Department approval also include the fire department’s Application for Permit Request Service. The city’s SmartGov portal lets applicants create an account, apply, upload documents, schedule inspections and see results; the Building Department’s page also describes email and counter submittals, so ask staff which route fits your project.
Residential permits
- Quick residential permits (the email list) are processed in one to five business days, with a same-day answer when the application comes in early. Once approved, the applicant gets an email with the steps to finish issuance.
- Room additions need drawings that show every required view; patio covers need two site plans with dimensions to the house, other structures, pools and property lines.
- ADUs may need an extra street or utility address, which the Building Department assigns on or before completion; junior units built inside homes, such as the Next Gen suites in Gossamer Grove, do not get a separate address.
- Homeowners can obtain a permit for improvements to their own home and may draw their own plans, provided the plans meet the structural, energy, fire and life-safety codes.
- Factory-built housing approved by the state (HCD or DSA) pays 50% of the normal new-construction fee.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects go in as three sets of drawings, in person or by mail, and plan review takes 15 to 20 business days, restarting when revisions come in. Work that the California Building Code lists for special inspection must be inspected by a special inspector registered with the city (registration is $149 per inspector and is processed by mail in five to seven business days). Commercial building permit applicants and business license applicants receive the state’s disability access notice, which the city posts in seven languages. Affordable housing projects can get priority permitting and inspections.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning and site review. The Planning Department runs site development review, zoning and subdivisions, and charges 15% of the building plan check fee to review building plans. A conditional use permit is $7,495, a minor variance $3,170 and a major variance $5,650.
- Planning Commission. The five-member commission meets at 6 p.m. on the second Tuesday of each month in the City Hall council chamber and advises the City Council on land use.
- Encroachment permit. Any work in the city right-of-way needs one. Since August 3, 2026, applications must go through the online portal, and fees are due when you submit.
- Grading. The city posts rough and final grade certificate forms on its Building and Engineering pages.
Shafter building permit fees
Shafter’s fees are set by City Council Resolution 3083, adopted June 2, 2026, with the new fees taking effect 60 days later; the city manager may adjust them each July 1 by the Bakersfield-Delano consumer price index. Each permit carries an issuance fee that depends on location: $30 inside the core area (north of Riverside Street and west of Cherry Avenue) and $69 elsewhere in the city, with one issuance fee when permits are combined.
| Work | Fee |
|---|---|
| New construction, valuation up to $500,000 | 1.32% of valuation (includes plan check and trades) |
| New construction, $500,001 to $1,000,000 | $6,600 plus 1.0% of the excess |
| Permit issuance, core area / outside core | $30 / $69 |
| Minimum permit fee, core / outside core | $79 / $120 |
| Residential reroof up to 2,000 sq ft | $78, plus $13 per extra 1,000 sq ft |
| Water heater (plumbing) | $21, plus plumbing issuance |
| Split-system HVAC change-out / packaged unit | $117 / $64 |
| Solar PV under 10 kW | $105 |
| Fence or block wall, first 100 linear feet | $117 |
| Pre-engineered open / enclosed patio cover | $195 / $313 |
| Swimming pool or spa | $313 |
| Window replacement, up to 5 windows | $78, plus $13 each additional |
| Re-inspection or missed inspection (second and later) | $117 each |
| Temporary certificate of occupancy | $117 |
| Permit extension of time | $106 |
| Hourly staff rate | $194 |
Rather talk it over?
Call 1-855-478-4290 →Valuation for new buildings is the International Code Council building valuation figure multiplied by 0.70. The new-construction fee covers plan check, building, electrical, mechanical, plumbing and strong-motion fees; about one-third of it is plan check, collected up front. On a new house with an adjusted valuation of $300,000, the permit fee is $3,960 (1.32%), plus a $30 or $69 issuance fee. The city also adds a community planning fee of $0.00172 per dollar of value ($516 on that house) and the state building standards fee. Above $1,000,000 the fee is $11,600 plus 0.66% of the excess. Withdrawing a project by written request, before or after plan check, carries a $105 termination fee.
Engineering fees in the same resolution: encroachment intake is $105, a minor encroachment is $160 for plan review and $290 for inspection, and a major one is $640 for plan review and $385 for inspection plus $130 a day after the first day. Planning business zoning review and a home occupation permit are $70 each, and a planning sign permit is $465. On the building side, a demolition permit is $43, a change-of-occupancy survey $156, and an appeal of a Building Official decision to the Board of Building Appeals $1,650.
Trade permits and who may pull them in Shafter
Electrical, plumbing and mechanical permits come from the Building Department and use itemized fee schedules when they are not part of a new building: for example $39 for each 10 receptacles or light fixtures, $97 for a temporary construction power service, $64 for a furnace or condenser change-out and $21 for a water heater, each plus the issuance fee ($29 or $69 for plumbing). Trade work on a new building is already included in the 1.32% new-construction fee.
Rather not deal with the building department?
Get a free quote →A homeowner can obtain a permit for work on their own home. The city recommends using qualified professionals in most cases and notes that licensed contractors must carry their own bonds, workers’ compensation and liability insurance, which an owner doing the work may lack; it suggests owners review their insurance before starting. The Building Department posts a subcontractor list form for projects with several trades. New businesses in Shafter file a business license application with the Administrative Services Department.
How to apply for a Shafter building permit
Ask the Planning Department about zoning, setbacks and any site development review; the portal’s parcel search shows parcel information.
Fill in the Project Identification Worksheet and gather plans, and the fire department request form if Kern County Fire must approve the work.
Email small residential jobs on the city list to buildinginspection@shafterca.gov, use the SmartGov portal, or bring or mail larger and commercial projects to City Hall.
Plan check fees are charged up front, at least one-third of the permit fee.
Respond to plan review comments; each revision restarts the 15 to 20 business day review clock.
After approval, follow the emailed instructions, pay the remaining fees and get the permit before work starts.
Review, corrections and what causes delay
Quick residential permits take one to five business days, and larger projects 15 to 20 business days, with the clock resetting on every revision. The city’s own rules explain most holds: online submittals outside the email list are not accepted, patio applications need two site plans, projects needing Kern County Fire approval need its request form, special inspections must be done by city-registered inspectors, and re-inspection fees must be paid before the next inspection is called.
Inspections in Shafter
Residential inspections are booked by email to buildinginspection@shafterca.gov (or through the portal) with the address, requested date, inspection type, permit number, a morning or afternoon window and any gate or entry instructions; mark re-inspections clearly. Morning inspections run from 8:30 a.m. to noon and afternoon ones from 1:30 to 4 p.m., and the city warns that heavy workloads can push appointments back. Commercial inspections use the commercial inspection request form, emailed during business hours at least 24 hours ahead; late requests roll to the next business day. A correction notice means a re-inspection once the work is fixed, and the second and later re-inspections or missed inspections cost $117 each. New buildings finish with a certificate of occupancy, and a temporary one costs $117.
Want this handled start to finish?
Get a free quote →California building code in Shafter
Shafter’s Building Department enforces the state building standards throughout the incorporated city, alongside the city’s own fee resolution, special inspection program and engineering design manual. FEMA’s Community Status Book lists Shafter (community 060082) as participating in the National Flood Insurance Program, with flood maps effective October 21, 2021.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Shafter building permit FAQs
Who is Shafter’s Building Official?
Dennis Fidler, at the Building Department in City Hall, 336 Pacific Avenue (661-746-5002).
How much is a permit for a new house in Shafter?
1.32% of the adjusted valuation up to $500,000, plus a $30 or $69 issuance fee; $3,960 on a $300,000 adjusted valuation.
Can I email my permit application?
Yes, for small residential jobs on the city’s list such as water heaters, HVAC, reroofs, patio covers and solar; larger work goes by counter, mail or the portal.
How long does plan review take?
15 to 20 business days for larger projects, restarting with each revision; quick residential permits take one to five business days.
Can a homeowner pull a permit and draw the plans?
Yes. Owners can obtain permits for their own homes and prepare their own plans, as long as the plans meet all applicable codes.
How do I schedule an inspection?
Email buildinginspection@shafterca.gov with the permit number, address, inspection type and a morning or afternoon window, or schedule in the portal.
Do I need a permit to work in the street?
Yes. An encroachment permit, applied for in the city’s online portal since August 3, 2026, with fees paid at submission.
Shafter permit search and official resources
Permit status and inspection results for your own projects appear in the SmartGov portal, which also has a parcel search; portal help is at 661-746-5002. For older permit records, use the city’s public records request form; the city answers within 10 days and copies are usually 20 cents a page.
Inspections are where schedules slip.
Get a free quote →- Shafter building permits
- Building Department
- SmartGov permit portal
- User and regulatory fees
- Resolution 3083, user and regulatory fees update 2026
- Home additions and patio covers
- Priority permitting for affordable housing
- Planning Department
- Planning Commission
- Engineering Department and encroachment permits
- New business licenses
- Public records requests
- Kern County Fire Department fire prevention
Simplify Shafter permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Shafter sooner?
Let Alliance prepare, file, and track your Shafter permits while your crew stays on the job.
More California permitting guides
Kern County
Read guide →Tehachapi
Read guide →Wasco
Read guide →Shasta County Building Permit Guide
Read guide →Shasta Lake Building Permit Guide
Read guide →Sierra County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Shafter permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.