Skip to main content
Municipal GuideCaliforniaShasta Lake · Shasta County

Shasta Lake, California Building Permit Guide

To get a building permit in Shasta Lake, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Shasta Lake’s Building Division, part of Development Services at 4477 Main Street, takes building permit applications by email and prices homes and additions by square footage under its February 2024 fee schedule.

Authority: City of Shasta Lake Building DivisionFees: Effective Feb. 1, 2024Phone: 530-275-7430
Authority
City Building Division4477 Main Street
Apply
By email or at the counterpermit@cityofshastalake.org
New home fee
$2,677 total1,801–2,000 sq ft, incl. plan check
Roof snow load
35 psfNon-reducible, citywide

Inside the City of Shasta Lake, the Building Division of the Development Services Department, 4477 Main Street (530-275-7430), reviews plans, issues building permits and inspects all phases of construction; Bryan Trudeau is the Building Official. Applications and forms can be emailed to the division or brought to the Development Services permit counter. Under the fee schedule effective February 1, 2024, a new home of 1,801 to 2,000 square feet costs $2,677 in permit and plan check fees before valuation-based surcharges.

What requires a building permit in Shasta Lake?

The city’s fee schedule and forms show the work it permits: new dwellings, residential additions, garages and workshops, carports, decks and patio covers, dwelling renovations, foundations, manufactured home installations, re-roofing, pools and spas, solar systems, demolition, signs, wireless facilities, engineered retaining walls and fences, and electrical, plumbing and mechanical work such as service changes, water heaters, gas line tests and HVAC replacements. Commercial and industrial buildings, tenant improvements and awnings are priced separately.

Building permit

  • New homes, additions, garages and workshops
  • Decks, patio covers and carports
  • Re-roofing, with Class A roofing material
  • Manufactured home installation and foundations
  • Swimming pools and spas
  • Solar photovoltaic systems
  • Service changes, water heaters, HVAC and gas lines
  • Demolition

Other city permits

  • Clearing and grading permits
  • Encroachment permits for work in the right-of-way
  • Floodplain development review
  • Tree removal
  • Design review, use permits and variances
  • Sign permits
  • Home occupation permits

Work done without a required permit carries a penalty equal to the permit fee. The city also offers a code compliance inspection and report at $445, or $117 for owners who qualify as low or moderate income.

What Shasta Lake decides and what the state holds

The city publishes its own climatic and geographic design criteria on a sheet prepared under the 2019 California codes: a roof snow load of 35 pounds per square foot, non-reducible, taken from Shasta County’s snow load map; an 85 mph wind speed; seismic design category D1; climate zone 11; a soil bearing value of 1,500 pounds per square foot; a 32-degree winter design temperature; and Class A roofing material. Flood hazard rules are in Chapter 15.04 of the Shasta Lake Municipal Code. The city also sets its fees and runs its own water, sewer and electric utilities; contractor licensing is a state matter.

Shasta Lake building department: who handles permitting

The City of Shasta Lake issues building permits for all work inside its limits. Its Development Services Department oversees the Building Division, Planning and Zoning, Code Enforcement and Economic Development, and runs one permit counter for all development projects. Public Works handles encroachment permits, and the city’s Electric Department charges its own application fee on solar systems. Land outside the city limits is permitted by the Shasta County Building Division.

Short on time to read all of this?

Get a free quote →
Shasta Lake permit contacts
DetailInformation
OfficeDevelopment Services, 4477 Main Street (P.O. Box 777), Shasta Lake, CA 96019
Building OfficialBryan Trudeau, 530-275-7472
Permit counter530-275-7430; fax 530-275-7414
Applications by emailpermit@cityofshastalake.org (the application form lists permit@cityofshastalake.gov)
HoursMonday to Thursday 7 a.m. to 3 p.m., Friday 7 a.m. to 2 p.m.; closed noon to 1 p.m.
PlanningPlanning@cityofshastalake.org; 530-275-7430
City Hall / Public Works (encroachment)530-275-7400

Shasta Lake permit types

The Building Division posts its forms online and takes them by email: the building permit application, a solar permit application, a re-roof permit packet, a residential pools and spas packet, a demolition permit packet, a manufactured home permit application packet, the building design criteria sheet, a smoke and carbon monoxide alarm affidavit, an encroachment permit application and an address change request. The application asks for the contractor’s state license number and City of Shasta Lake business license number, or an owner-builder declaration.

Residential permits

  • New homes and additions are priced by gross square footage, with plan check built into the total.
  • Garages, workshops and accessory structures have their own size-based fees, such as $117 for a prefabricated metal carport and $1,136 for a garage of 601 to 1,000 square feet.
  • Manufactured homes follow the city’s manufactured home inspection procedure; installation is $641, of which $252 is plan check.
  • Pools and spas need the pool barrier requirements in the city’s handouts.
  • HVAC replacements are covered by the city’s installation handouts for contractors and for homeowners.

Commercial permits

New commercial and industrial buildings are priced by gross square footage, from $4,280 for up to 500 square feet to $33,745 for 175,001 to 200,000 square feet, including plan check. Tenant improvements and renovations are $673 up to $5,000 of valuation and $1,044 above that, with the schedule noting proposed changes pending; commercial solar adds a $529 Electric Department application fee to the $348 permit and $226 plan check. The handouts include a food facility wastewater discharge survey for fats, oils and grease.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning approvals: design review, site development permits, use permits and variances are filed on the city’s planning application with the matching checklist; residential design review issued by the director is $512.
  • Clearing and grading: separate permits, with plan check and inspection, from $96 for clearing under an acre and $547 for grading under an acre.
  • Trees: a tree removal plan and the city’s landscaping and replacement tree list under Planning Commission Resolution 21-02; a tree removal permit is $134.
  • Right-of-way: an encroachment permit is required for any work within, under or over the right-of-way, such as driveway changes, concrete or asphalt, drainage, utilities, fencing or landscaping.
  • Floodplain: floodplain development review and inspection with a building permit is $175, and a written floodplain determination is $116.
  • Fire and septic: the handouts include the Shasta Lake Fire Protection District’s fuel oil tank sheet and Shasta County Environmental Health’s onsite wastewater program letter for parcels on septic.

Shasta Lake building permit fees

Fees come from the City of Shasta Lake Permit Fee Schedule effective February 1, 2024. New dwellings and residential additions are priced by gross square footage; each total below includes the permit fee and the plan check fee.

New dwellings and additions (fee schedule effective Feb. 1, 2024)
Gross square feetNew dwelling (total)Residential addition (total)
1 to 600$2,131$1,087
601 to 1,200$2,295$2,072
1,201 to 1,400$2,399$2,174
1,401 to 1,800$2,575$2,314
1,801 to 2,000$2,677$2,415
2,001 to 2,400$2,927$2,552
2,401 to 2,600$3,026$2,727
2,601 to 3,000$3,204$2,869
3,001 to 3,200$3,306$2,970
3,201 to 3,600$3,484$3,105
Each added 200 sq ft$273$341

Rather talk it over?

Call 1-855-478-4290 →
Other residential fees
ItemFee
Deck 1–400 sq ft / over 400 sq ft$174 / $405
Patio cover 1–300 sq ft / over 300 sq ft$174 / $405
Carport: prefabricated metal / detached / attached$117 / $328 / $432
Dwelling renovation: up to $2,000 / over $2,000 valuation$174 / $331 (schedule notes proposed changes pending)
Re-roof, residential$118
Foundation or manufactured home installation$641
In-ground pool or spa (permit / plan check)$478 / $310
Residential solar (Electric Dept. fee / permit / plan check)$250 / $174 / $113
Temporary power pole / service change$122 / $134
Mechanical (HVAC or repairs) / water heater / gas line test$149 / $96 / $96
Demolition / encroachment permit$118 / $118
Engineered retaining wall or fence (permit / plan check)$487 / $316
Re-inspection or wasted trip (no access, not ready)$115
Plan revision or single-sheet plan check / permit time extension$76 / $84

Every building permit also pays a general plan maintenance fee of 0.1842% and an information technology fee of 0.1789% of project valuation, the state seismic fee (residential valuation times 0.00013, 50 cents below $3,850) and the state building standards fee ($1 per $25,000 of valuation up to $100,000, plus $1 for each further $25,000 range). Re-roof valuations are estimated per roofing square: $211 for an overlay, $317 for a tear-off and $423 for a tear-off with new sheathing. A new plan set needs a new plan check fee.

Worked example: a 1,900-square-foot home with a declared valuation of $400,000 pays $2,677 in permit and plan check fees, $736.80 general plan maintenance, $715.60 technology fee, $52 seismic fee and $16 building standards fee, $4,197.40 before utility and impact fees.

Utility connection and impact fees (city form, 2023)
ItemFee
1-inch water meter and service$2,312 each
Water capacity charge, 5/8- or 1-inch meter for a fire sprinkler requirement$5,367
Sewer capacity charge$5,350 per single-family equivalent
Sewer connection permit / 4-inch tap$60 / $100
Park and recreation facilities impact fee, single-family$3,178
Transportation impact fee, single-family$1,680.90
Electric connectionCalculated by the Electric Department

Rather not deal with the building department?

Get a free quote →

The city’s utility form states that applicants pay the fees in effect when the building permit is issued.

Trade permits and who may pull them in Shasta Lake

The Building Division issues electrical, plumbing and mechanical permits on flat fees: a temporary electric pole is $122, removing or replacing a service or miscellaneous rewiring $134, an HVAC replacement or repair $149, a water heater or gas line pressure test $96 and miscellaneous plumbing repairs $149. Residential solar needs the city’s solar application and a $250 Electric Department application fee, because the city runs its own electric utility; liquefied petroleum gas installations and PG&E gas meter requirements are covered in the city’s handouts.

The application carries a licensed contractor declaration, with state license number and class, and an owner-builder declaration for owners who will do the work themselves on a structure not intended or offered for sale, or who contract only with licensed contractors. Contractors also list their City of Shasta Lake business license number. The city requires a business license when a business’s gross income exceeds $300 a quarter, including businesses based outside the city that work inside it and home-based businesses, which also need a home occupation application approved by Planning.

How to apply for a Shasta Lake building permit

1. Check zoning and planning approvals

Ask Planning whether the project needs design review, a use permit, a tree removal plan or a clearing or grading permit.

2. Check utilities and the street

Plan water, sewer and electric connections with the city and get an encroachment permit for any driveway or utility work in the right-of-way.

3. Prepare the plans

Design to the city’s criteria sheet (prepared under the 2019 codes), including the 35 psf non-reducible roof snow load and Class A roofing.

4. Complete the application

Fill in the building permit application with the valuation, contractor or owner-builder declaration and workers’ compensation details.

5. Submit by email or at the counter

Email the application and plans to the permit address or bring them to Development Services, 4477 Main Street.

6. Pay and collect the permit

Pay the permit, plan check, surcharge and utility fees, then keep the permit on site.

Review, corrections and what causes delay

Plan check is priced into each permit, but changes cost more: a plan revision or single-sheet check is $76, and submitting a new plan set requires a new plan check fee. Projects in mapped flood areas need floodplain development review, and parcels in the wildland-urban interface or very high fire hazard severity zones must meet the fire-resistant construction rules the design criteria sheet points to. A permit time extension is $84. The city does not publish standard plan review times; ask the permit counter at 530-275-7430.

Want this handled start to finish?

Get a free quote →

Shasta Lake building inspections

The Building Division inspects all phases of construction. The city does not post a separate inspection request line, so arrange inspections through the Development Services permit counter at 530-275-7430 during office hours, Monday to Thursday from 7 a.m. to 3 p.m. and Friday until 2 p.m. A re-inspection, or a trip wasted because the site was not ready or could not be entered, costs $115.

Manufactured home installations are inspected under the city’s own inspection procedure, and one- and two-family projects file the smoke and carbon monoxide alarm affidavit. Construction sites follow the city’s stormwater best management practices handouts.

California building code in Shasta Lake

Shasta Lake’s climatic and geographic design criteria sheet was prepared under the 2019 California codes; its local values, such as the 35 psf roof snow load and Class A roofing, are the ones the city asks designers to use. Ask the Building Division about local amendments in Title 15 of the municipal code. FEMA’s Community Status Book lists the City of Shasta Lake (community 060758) as participating in the National Flood Insurance Program, with flood maps effective March 17, 2011.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Shasta Lake permit search and official resources

To check a permit’s status or get copies of permit records, contact Development Services at 530-275-7430 or the permit email address. The city’s GIS map viewer shows parcel and public property locations.

Inspections are where schedules slip.

Get a free quote →

Shasta Lake building permit FAQs

How do I apply for a building permit in Shasta Lake?

Email the building permit application and plans to permit@cityofshastalake.org or bring them to Development Services at 4477 Main Street.

How much does a permit for a new house cost?

Under the February 2024 schedule, a new dwelling of 1,801 to 2,000 square feet is $2,677 including plan check, plus valuation-based surcharges and utility connection and impact fees.

What roof snow load do I design for?

35 pounds per square foot, non-reducible, under the city’s design criteria, with Class A roofing material required.

Do I need a permit for a deck or patio cover?

Yes. Decks up to 400 square feet and patio covers up to 300 square feet are $174; larger ones are $405.

Do contractors need a Shasta Lake business license?

Yes, when the business earns more than $300 a quarter in the city, even if it is based elsewhere; the permit application asks for the license number.

Do I need a permit for work in the street?

Yes. An encroachment permit, $118, is required for driveway, concrete, drainage, utility, fencing or landscaping work in the right-of-way.

Who is the building official?

Bryan Trudeau, reachable at 530-275-7472.

Simplify Shasta Lake permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Shasta Lake sooner?

Let Alliance prepare, file, and track your Shasta Lake permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Shasta Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.