Mendocino County, California Building Permit Guide

To get a building permit in Mendocino County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Mendocino County Planning and Building Services issues building permits for unincorporated land and, under its own published duties, for the cities of Fort Bragg and Point Arena, from offices in Ukiah and Fort Bragg and through the e-TRAKiT portal.

Authority: Mendocino County Planning and Building ServicesFees: Resolution 26-129, effective September 19, 2026Phone: 707-234-6650
Covers
Unincorporated countyPlus Fort Bragg and Point Arena
Apply
Ukiah or Fort Bragg counterOr online through e-TRAKiT
Plan review
75% of permit fee100% where the county runs the fire code
Inspections
Call by 3:00 p.m.The day before; Ukiah 707-234-6650

The Building Division of Mendocino County’s Planning and Building Services department issues building permits in the unincorporated county and, as the department states its duties, in the cities of Fort Bragg and Point Arena; Ukiah and Willits run their own building offices. Applications go in at 860 North Bush Street, Ukiah (707-234-6650), at 752 South Franklin Street, Fort Bragg (707-964-5379), or online through e-TRAKiT. Under the countywide master fee schedule adopted by Resolution 26-129 and in force since September 19, 2026, plan review is 75% of the valuation-based permit fee, and the department currently quotes 6 to 8 weeks for plan check.

What requires a building permit in Mendocino County?

Section 18.08.10 of the Mendocino County Code, quoted on the Building Division page, bars anyone from erecting, constructing, enlarging, altering, repairing, moving, improving, occupying, removing, converting or demolishing a building or structure in the unincorporated area without a separate building permit for each building or structure, unless the California Building Code or another county ordinance exempts the work.

Permit required

  • New homes, additions, accessory dwelling units and garages
  • Reroofing, siding and window replacement
  • Electrical, plumbing and mechanical work, including generators and EV chargers
  • Mobile and manufactured home installations
  • Demolition of a building or part of one
  • Decks over 200 square feet, attached decks, or decks more than 30 inches above grade
  • Grading beyond the county’s exemptions, under Chapter 18.70

No building permit

  • One-story detached accessory structures up to 120 square feet
  • Fences not over 7 feet high
  • Retaining walls up to 4 feet from the bottom of the footing, unless supporting a surcharge
  • Water tanks on grade up to 5,000 gallons with a height-to-width ratio of 2 to 1 or less
  • Sidewalks and driveways, and painting, tiling, carpeting, cabinets and countertops
  • Prefabricated pools under 24 inches deep, play equipment and wall-supported awnings up to 54 inches
  • Minor electrical, gas, mechanical and plumbing repairs listed on the Building Division page

Grading of 50 cubic yards or less carries no fee when it is not combined with other development, but grading in the Coastal Zone can also need a coastal development permit.

What the county decides and what the state holds

The Board of Supervisors sets the fee schedule, the zoning codes (Inland, Coastal and Town of Mendocino divisions of Title 20), the grading and stormwater ordinances and the Class K rules for owner-built rural dwellings in Chapter 18.23. The building standards themselves are state codes, and contractor licenses come from the state.

Mendocino County building department: who handles permitting

Planning and Building Services has four divisions: Planning, Building, Code Enforcement and Cannabis. Richard Angley is the Interim Department Director and the Building Official. The Building Division issues construction permits, runs the floodplain program and checks stormwater compliance; the Planning Division handles zoning, coastal development permits and addressing. To see whether an address is in a city or in the unincorporated county, the Planning Division offers a Zoning Lookup Tool for assessor parcels and a formal letter of zoning ($148 plus staff time).

Short on time to read all of this?

Get a free quote →
Mendocino County permit contacts
DetailInformation
Ukiah office860 North Bush Street, Ukiah, CA 95482; 707-234-6650; fax 707-463-5709
Fort Bragg office752 South Franklin Street, Fort Bragg, CA 95437; 707-964-5379 (the Planning page lists 120 West Fir Street for this office)
HoursMonday to Friday, 8:00 a.m. to 5:00 p.m.; no permit issuance, submittals or payments after 4:30 p.m.; Fort Bragg closed noon to 1:00 p.m.
Planner of the Day707-234-6653 (voice mail only); Monday, Tuesday, Thursday and Friday
Environmental HealthSeptic and wells: 860 N. Bush Street, 707-234-6625; Fort Bragg 752 S. Franklin Street, 707-961-2714
TransportationCounty road encroachment and transportation permits, 707-463-4363
Code Enforcement707-234-6669

Fire districts with authority to review permits include Anderson Valley, Fort Bragg, Hopland, Little Lake and Ukiah.

Cities and towns in Mendocino County
PlaceWho issues building permits
Fort BraggMendocino County Planning and Building Services, per the county’s stated duties
Point ArenaMendocino County Planning and Building Services, per the county’s stated duties
UkiahCity of Ukiah Building Services Division
WillitsCity of Willits Building & Safety, 111 E. Commercial Street (city page)
All unincorporated communitiesMendocino County Planning and Building Services

Mendocino County permit types

The Building Division takes applications only from the property owner acting as owner-builder, a California-licensed and bonded contractor, or an authorized agent of either, and every application needs the county’s building permit application form. Same-day, over-the-counter permits need only the application and an 8½ by 11 inch plot plan; examples are electrical, demolition, reroofing, residential mechanical and plumbing, like-for-like windows and siding and minor interior remodels.

Residential permits

  • New homes and additions add a set of construction plans, Title 24 energy compliance for conditioned space, wet-signed engineering where required, erosion and sediment plans for sites under one acre, and where they apply a Brooktrails Services District stamp and a Cal Fire application with preliminary approval.
  • Class K dwellings are an alternative standard for owner-built rural homes and their outbuildings on suitably zoned parcels of one acre or more, up to 2½ stories; the fee is the same as for a standard building, a Class K waiver form is needed, and Class K does not apply to commercial or industrial buildings.
  • ADUs may be up to 1,200 square feet detached, or attached at no more than 50% of the existing living area or 1,200 square feet, whichever is smaller; junior units are capped at 500 square feet. The county offers two free, unstamped sample plans of 816 and 1,120 square feet that a licensed architect must redraw and stamp.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial tenant improvements and additions use the county’s commercial checklists and accessibility worksheet. Agricultural buildings that qualify for the exemption use the agricultural exempt building application and pay a flat fee instead of a valuation-based permit fee, unless the structure exceeds 1,000 square feet or needs more than one inspection.

What comes before the building permit

  • Planning and zoning: projects are reviewed by Planning, Building and Environmental Health before issuance, and use permits, variances, administrative permits and boundary line adjustments go through the Planning Division first.
  • Coastal Zone: parcels in the mapped Coastal Zone may need a coastal development permit or a categorical exclusion, and work in the Town of Mendocino goes to the Mendocino Historical Review Board.
  • Septic and wells: Environmental Health reviews site evaluations and issues sewage system and well permits.
  • Other sign-offs: the local fire department, Air Quality, the recycling ordinance, sewer or water districts and school impact fees may have to be cleared before a new building or demolition permit issues.
  • Stormwater and floodplain: sites disturbing one acre or more need state Construction General Permit coverage, parcels in the Ukiah or Fort Bragg MS4 areas need the MS4 form, and floodplain work needs a floodplain development permit.

Mendocino County building permit fees

Building fees are part of the countywide Master Fee Schedule adopted at the Board of Supervisors’ July 21, 2026 fee hearing by Resolution 26-129 and effective September 19, 2026. The permit fee is set from the job cost valuation; staff may use the schedule’s per-square-foot table, and remodels are valued at 65% of the stated valuation. Fees paid when applying in e-TRAKiT are only part of the total; the balance is collected at issuance.

Building permit fee by job cost valuation (Resolution 26-129)
ValuationBuilding permit fee
$1 to $500$23.67
$501 to $2,000$23.67 for the first $500 plus $3.11 per additional $100
$2,001 to $25,000$70.03 for the first $2,000 plus $14.12 per additional $1,000
$25,001 to $50,000$394.88 for the first $25,000 plus $10.19 per additional $1,000
$50,001 to $100,000$649.64 for the first $50,000 plus $7.06 per additional $1,000
$100,001 to $500,000$1,002.73 for the first $100,000 plus $5.61 per additional $1,000
$500,001 to $1,000,000$3,246.75 for the first $500,000 plus $4.78 per additional $1,000
Over $1,000,000$5,634.45 for the first $1,000,000 plus $3.55 per additional $1,000

Rather talk it over?

Call 1-855-478-4290 →
Other Building Division fees (Resolution 26-129)
ItemFee
Plan review75% of the building permit fee (100% where the county administers the fire code)
Minimum permit or demolition fee$186
Issuance fee$135
Records management$150 over the counter or floodplain; $300 residential; $305 commercial up to $25,000; $500 commercial over $25,000
General plan maintenance0.65% of valuation from $17,001; $20 flat at $17,000 or less
Education fee1% of the building permit and plan check fees
Reinspection$106
Reinstatement or extension$172 plus $86 for each remaining inspection on an issued permit
Stormwater, MS4 or flood inspection$187 each
Agricultural building exemption / pond or grading exemption$306 / $713
Residential solar, 15 kW or less$450 flat
Special or pre-site inspectionFrom $222 (Ukiah, Fort Bragg) to $878 (Whale Gulch); Willits $305, Gualala $578

Worked example: a job with a $100,000 job cost valuation carries a building permit fee of $1,002.73 and a plan review fee of $752.05 (75%), before the issuance, records, general plan maintenance, education and state fees are added. The schedule’s valuation table moves from 2021 to 2024 ICC figures; for a one- or two-family house of type V-B construction it lists $170.80 a square foot.

Other departments charge separately: Environmental Health lists $733 for a new standard sewage system permit, $883 to review a standard site evaluation report and $885 for a water well permit, and Transportation charges $600 for a residential driveway approach encroachment. School districts set school impact fees on new homes and commercial buildings of 500 square feet or more; garages and workshops are exempt from the residential school fee. The department’s own fee extract, linked from its page, still shows some older amounts, such as a $183 minimum fee and an $86 reinspection fee; the board-adopted schedule above is the one in force.

Rather not deal with the Mendocino County building department?

Get a free quote →

Trade permits and who may pull them in Mendocino County

Electrical, plumbing and mechanical work is permitted by the same Building Division, either as part of a building permit or as an over-the-counter trade permit. The county publishes packets for generators and EV charging stations. Only an owner-builder, a California-licensed and bonded contractor or their authorized agent may apply; an agent needs the county’s agent and applicant authorization form.

Owner-builders who build a Class K dwelling may use the alternative standard only for owner-built rural homes, not for commercial or industrial buildings. Businesses operating in the unincorporated county apply for a county business license through the Treasurer-Tax Collector, and Planning reviews zoning and occupancy for a business license at $249 ($132 for a home occupation).

How to apply for a Mendocino County building permit

1. Confirm the parcel

Use the Zoning Lookup Tool or call the Planner of the Day to confirm zoning, Coastal Zone status and whether the address is inside Ukiah or Willits.

2. Clear septic, water and fire

Get Environmental Health approval for a septic system or well, and any district, Brooktrails or Cal Fire approvals the project needs.

3. Choose a plan review path

Residential applicants pick county review, third-party review by CSG Consultants, Inc., or a California-licensed design professional with residential plan review certification.

4. Submit the application

File in person in Ukiah or Fort Bragg before 4:30 p.m., or upload through e-TRAKiT with the completed application and plot plan.

5. Answer corrections

Return revisions with the revision and recheck cover sheet; extra review is billed at staff time.

6. Sign and pay

Pay the balance of fees; the county may issue the permit digitally by DocuSign.

Review, corrections and what causes delay

Plan checks are taken in the order received, and the county will not move a project ahead for escrow or weather; foundation-only permits may be allowed for commercial projects. The department’s current estimate is 6 to 8 weeks for plan check, and its AB 253 notice says county review cannot consistently meet the 30-business-day state benchmark for residential plans, which is why a paid third-party option exists. Incomplete applications are returned whether filed online, by mail or in person.

Mendocino County building inspections

Request inspections on the automated line (Ukiah 707-234-6650, Fort Bragg 707-961-2677) with the site address and permit number, or online in e-TRAKiT, by 3:00 p.m. the day before. Inspectors run area routes: the Ukiah, Willits, Hopland, Fort Bragg and Mendocino areas are served Monday to Friday, Covelo only on Thursdays, and Gualala, Point Arena and Elk on Mondays and Wednesdays; a visit outside an area’s set day costs extra.

Want this handled start to finish?

Get a free quote →

The first inspection must happen within one year of issuance and each later approval within 180 days of the last one; a written extension request with its fee must reach the Building Official before the permit expires. To learn the morning or afternoon window, call between 8:00 and 9:00 a.m. on the day. Post the address in 2½ to 4 inch numbers visible from the road and keep the job copy of plans and permit on site.

California building code in Mendocino County

The county applies the state building codes through Title 18 of its code: Chapter 18.08 requires the permits, Chapter 18.23 adopts the Class K standard for limited-density owner-built rural dwellings, and Chapter 18.70 regulates excavation and grading. FEMA’s Community Status Book lists unincorporated Mendocino County (community 060183) as participating in the National Flood Insurance Program, with flood maps effective September 19, 2025.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Mendocino County permit search and official resources

Permit status can be looked up in e-TRAKiT, and the county’s request-for-permit-information form covers status checks, pickup appointments, extensions and reinstatements. Copies of past permits and project documents are requested through the county’s Public Records Request page, which the Planning Division says carries no fee.

Inspections are where schedules slip.

Get a free quote →

Mendocino County building permit FAQs

Does the county issue permits in Fort Bragg and Point Arena?

Yes. The department states that it administers building regulations in the unincorporated county and in those two cities; Ukiah and Willits issue their own permits.

How long does plan check take?

The department currently quotes 6 to 8 weeks, and residential applicants may pay for third-party review instead.

How much is plan review?

75% of the valuation-based building permit fee, or 100% where the county administers the fire code.

Do I need a permit for a shed or fence?

Not for a one-story detached shed of 120 square feet or less, or a fence up to 7 feet high.

Can I build my own house under Class K?

Owner-builders can use the Class K standard for a rural home on suitably zoned land of one acre or more, up to 2½ stories, for the same permit fee.

How do I book an inspection?

Call the automated line or use e-TRAKiT by 3:00 p.m. the day before; rural areas are inspected on set days.

When does a permit expire?

If the first inspection is not within one year, or 180 days pass between approvals, unless a paid extension is granted first.

Simplify Mendocino County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Mendocino County sooner?

Let Alliance prepare, file, and track your Mendocino County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Mendocino County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.